                                                                             SWMS: 30 – Work on a Mast Climber – N/A
Project Details

Project:                                71 SEAVIEW TCE SUNSHINE BEACH QLD 4567                                                      Responsible Person:          Matt Leeke 0414 691 314
                                                                                                                                    Site Manager:                Matt Leeke 0414 691 314
                                                                                                                                    Site Foreman :               Terry Strahan 0419 762 427

Activity Description:                   Operating and performing associated work activities from a Mast Climber.                    Site Foreman :
                                                                                                                                    HSO:                         Terry Strahan 0419 762 427

Referenced SWMS:                        SMWS 04 – SMWS 08
                                           Mast Climber and associated mast sections platform and electrical connections
Plant and Equipment Involved:
                                           Personal tools and associated power tools and materials
                                                                                                                                                                    energised electrical installations
                                        Work at Heights >2m                   Disturbance of asbestos                    Confined spaces
                                                                                                                                                                    or services
High Risk Activities:                                                          Structural alterations requiring          Excavation >1.5 metres or near a           a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                          temporary support                         tunnel                                     atmosphere
                                        A work area with moving                water or other liquid that
                                                                                                                         tilt-up or precast concrete                Other: ____________________
                                        powered mobile plant                   involves a risk of drowning
PPE Required:                           Hard Hat                      Safety glasses / goggles           Hearing Protection                Fall Arrest Harness              Wrist straps / lanyard
(Tick as relevant)                      Safety Boots                  Face Shield                       Gloves                             Respirator                       High Visibility Vest
                                           Inspection and pre-start checks are to be carried out by a trained competent persons recommendations and inspected at least:
Maintenance / Prestart Checks
Required:                                  before first use;
                                           prior to each day’s use;
                                           immediately following any disturbance or major weather impact that might reasonably be expected to affect the stability of the mast climber;
                                           following any repairs and modifications; and
                                           Service intervals not exceeding thirty (30) day or as per manufacturers requirements.
                                           RB - basic rigging or
Certificates of Competency
Required:                                  SI - intermediate scaffolding

                                         Induction into this Safe Work Method Statement
Training / Competencies Required:
                                         Undergo mast climber induction training in the safe operation and functioning to operate provided by the supplier
                                        Work Health & Safety Regulation 2011, Part 5.4,                        Electrical Safety Act and Regulations 2002
Health, Safety or Environmental                                                          Codes or Standards QLD Code of Practice – Managing risks of plant in the workplace 2013
                                        Chapter 6.
Legislation:                                                                             Applicable to the     NSW Code Of Practice – Managing Risks Of Plant In The Workplace 2014
                                        Occupational Health & Safety Act 200 (VIC),
                                                                                         Works:                TAS Code Of Practice – Managing Risks Of Plant In The Workplace 2012
                                                                                                                         VIC Code of Practice(no.19) – Plant 1995

584 Milton Road TOOWONG QLD 4066                              SWMS Developed by:     Jamie Gilbert                                                                       VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                           Position:              National Health & Safety Co-ordinator                                                                 Page 123
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.