SWMS: 30 – Work on a Mast Climber – N/A Project Details Project: 71 SEAVIEW TCE SUNSHINE BEACH QLD 4567 Responsible Person: Matt Leeke 0414 691 314 Site Manager: Matt Leeke 0414 691 314 Site Foreman : Terry Strahan 0419 762 427 Activity Description: Operating and performing associated work activities from a Mast Climber. Site Foreman : HSO: Terry Strahan 0419 762 427 Referenced SWMS: SMWS 04 – SMWS 08 Mast Climber and associated mast sections platform and electrical connections Plant and Equipment Involved: Personal tools and associated power tools and materials energised electrical installations Work at Heights >2m Disturbance of asbestos Confined spaces or services High Risk Activities: Structural alterations requiring Excavation >1.5 metres or near a a contaminated or flammable Demolition of a structure Carried out in or near the following: temporary support tunnel atmosphere A work area with moving water or other liquid that tilt-up or precast concrete Other: ____________________ powered mobile plant involves a risk of drowning PPE Required: Hard Hat Safety glasses / goggles Hearing Protection Fall Arrest Harness Wrist straps / lanyard (Tick as relevant) Safety Boots Face Shield Gloves Respirator High Visibility Vest Inspection and pre-start checks are to be carried out by a trained competent persons recommendations and inspected at least: Maintenance / Prestart Checks Required: before first use; prior to each day’s use; immediately following any disturbance or major weather impact that might reasonably be expected to affect the stability of the mast climber; following any repairs and modifications; and Service intervals not exceeding thirty (30) day or as per manufacturers requirements. RB - basic rigging or Certificates of Competency Required: SI - intermediate scaffolding Induction into this Safe Work Method Statement Training / Competencies Required: Undergo mast climber induction training in the safe operation and functioning to operate provided by the supplier Work Health & Safety Regulation 2011, Part 5.4, Electrical Safety Act and Regulations 2002 Health, Safety or Environmental Codes or Standards QLD Code of Practice – Managing risks of plant in the workplace 2013 Chapter 6. Legislation: Applicable to the NSW Code Of Practice – Managing Risks Of Plant In The Workplace 2014 Occupational Health & Safety Act 200 (VIC), Works: TAS Code Of Practice – Managing Risks Of Plant In The Workplace 2012 VIC Code of Practice(no.19) – Plant 1995 584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 6 – September 2015 P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 123 ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.