                                                                          SWMS: 30 – Work on a Mast Climber – N/A
Safe Work Methods
                                                                                                                                                             Responsible      Residual
                                                                                     H                      Controls / Work Methods
                                                                                                                                                             Person/s for       Risk
             Job Steps                     Potential Hazards          L    C    R    O              1. Eliminate 2. Substitute 3. Isolate 4. Engineer         Monitor &     L    C R
                                                                                     C                               5. Admin 6. PPE                            Review
                                                                      B    5     E    5        Prior to the use of a mast climber, all relevant            Site Foreman    E    5       H
Prior to operation                    Non-competent operators /
                                                                                24              handover/commissioning documents are to be                                               1
                                      faulty equipment
                                                                                                provided to Hutchinson Builders by the                      Advanced                     5
                                                                                      5         contractor/supplier                                         Scaffolder
                                                                                                Operators MUST have completed and understand the
                                                                                                 safe operation induction process for the mast climber Mast Climber
                                                                                                 provided by the supplier before operating or working Operators
                                                                                                 in the mast climber
                                                                                      5
                                                                                               The Mast Climber Daily Safety Prestart Checklist is to be
                                                                                                completed by operators each day prior to use eg; safety
                                                                                                operational functions, (provided by the supplier).
                                                                                      3
                                                                                               Ensure exclusion zones are in place to isolate others
                                                                                                from below the operational area
                                                                      C    3    H     4     Safe access to the climber platform is provided by an          Site Foreman    D    3       M
Accessing and loading up the mast     Inappropriate means of
                                                                                13           access ladder on the climber at ground level or position                                    9
climber                               access / falls from height
                                                                                             in an area that the user is not exposed to injury.             Mast Climber
                                                                                            Access to the climber platform is to be via the                Operators
                                                                                      4      manufacturer provided ladder and gate.
                                                                                            Approaches to the mast climber are to be adequately
                                                                                      5      illuminated by either natural or artificial light.

                                                                      C    3    H     5     Check the Safe Working Load of the mast climber before         Site Foreman    D    3       M
                                      Overloading of materials and
                                                                                13           you place any loads onto the platform                                                       9
                                      weight
                                                                                      5     Evenly distribute the pending load along the length of         Mast Climber
                                                                                             the platform – ensuring to maintain clear walking access       Operators
                                                                                             and access to the control panel




584 Milton Road TOOWONG QLD 4066                           SWMS Developed by:   Jamie Gilbert                                                               VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                        Position:            National Health & Safety Co-ordinator                                                         Page 125
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.