                                                                     SWMS:31 – Operating Man & Material Hoist - N/A

Safe Work Methods
                                                                                                                                                        Responsible        Residual
                                                                                    H                     Controls / Work Methods
                                                                                                                                                        Person/s for         Risk
             Job Steps                    Potential Hazards           L   C    R    O             1. Eliminate 2. Substitute 3. Isolate 4. Engineer      Monitor &       L    C R
                                                                                    C                              5. Admin 6. PPE                        Review
Preparing to operate the hoist on     Failure to identify faulty /
                                                                      C   4     E    5     Pre-start inspections are to be undertaken (and Plant Operator               D    4       H
                                                                               18           recorded) of the plant in accordance with                                                 1
site                                  damaged plant and
                                                                                            manufacturer requirements.                                                                4
                                      equipment
                                                                                                                Trap Door Limit switch
                                                                                                                        Check gate limits
                                                                                                                        Check gate openings
                                                                                                                        Emergency Brake
                                                                                                                        Conduct full test run
                                                                                                                        Grease if required
                                                                                           Log books containing up-to-date details of
                                                                                     5      Hoist inspections, servicing and maintenance
                                                                                            to be maintained with the Hoist
                                                                                           Hoist identified as being damaged or faulty is to
                                                                                     1      be immediately removed from service.

                                      Falls from height
                                                                      C   5     E    4        Ensure the ladder is properly secured and              Hoist Operator
                                                                                                                                                                         E    5       H
                                                                               22              hand rails installed when accessing roof car.                                          1
                                                                                               Feet to remain on platform and don’t                                                   5
                                                                                               overreach outside of handrails.

                                      Struck by Falling Object
                                                                      D   3    M     5        Ensure ladder is stowed correctly after use            Hoist Operator
                                                                                                                                                                         E    3       M
                                                                                9                                                                                                     6
Loading workers and material          Hoist Falling                   C   5     E    1     Under No Circumstances will a Hoist be                    Hoist Operator
                                                                                                                                                                         E    5       H
into the hoist                                                                 22           overloaded – not to exceed the SWL                                                        1
                                                                                     5     Loads are not to be wedged in the hoist car                                               5


584 Milton Road TOOWONG QLD 4066                          SWMS Developed by:   Jamie Gilbert                                                             VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                       Position:            National Health & Safety Co-ordinator                                                       Page 132
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.