Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 422, section 1. The text section number identifies this passage in the reader.
SWMS:31 – Operating Man & Material Hoist - N/A
Safe Work Methods
Responsible Residual
H Controls / Work Methods
Person/s for Risk
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor & L C R
C 5. Admin 6. PPE Review
the defective item to be inspected and fixed to
render the Hoist fit for service
All service activities undertaken are to be
recorded into the Hoist Log Book
The Hoist is only allowed to be placed back into
operational service when the faulty items have
been verified as being fixed in the log book
Methods for monitoring and reviewing effectiveness of chosen control measures
Hutchinson Builders & Subcontracted Personnel: Follow procedure and report hazards
Hoist operator: Follow procedure and report hazards
Hutchinson Builders Foreman: Ensure competent persons operate plant and performs breakdown maintenance services to the Hoist equipment
Monitor SWMS controls on site using the Task Observation Form
Developed & approved on site by:
Name: Position: Date:
Matt Leeke Site Manager/ Foreman
Workers Representative
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 134
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.