                                                                     SWMS 32 – Operating Forklift to Load/Unload Trucks
Safe Work Methods
                                                                                                                                                        Responsible           Residual
                                                                                     H                    Controls / Work Methods
                                                                                                                                                        Person/s for            Risk
              Job Steps                     Potential Hazards          L   C    R    O            1. Eliminate 2. Substitute 3. Isolate 4. Engineer      Monitor &
                                                                                     C                             5. Admin 6. PPE                        Review          L      C     R
                                                                                            Workers are not allowed to move in front or behind
                                                                                             of moving plant – unless the operator has stop the
                                                                                             plant and he knows of your movements
                                                                                            BE AWARE OF MOVING PLANT AT ALL TIMES
                                                                       C   4     E    5     Drive to the loading / unloading point with straight     Hutchinson          E      4     H
                                       Positioning the Forklift
                                                                                18           wheels then bring the Forklift to a smooth stop          Builders Site                    10
                                                                                             leaving enough space to operate the Mast                 Foreman

                                                                                                                                                      Plant Operator
                                                                       B   5     E    5    Manual handling materials after loads are placed ;         Hutchinson          E      3     M
Operating a Forklift on site (cont.)   Preparing the
                                                                                22          Ensure adequate clear set down area is allocated for     Builders site                    6
                                       loading/unloading area
                                                                                             the load to be placed onto the ground                    foreman
                                                                                            Ensure that there is a clear travel path for the plant
                                                                                                                                                      Nominated
                                                                                             into the set down area
                                                                                                                                                      person
                                                                                            Competent person will assist the operator to
                                                                                             manoeuvre into the loading/unloading position            Plant Operator
                                                                                            Operator to ensure that workers are clear before
                                                                                             placing loads
                                                                       B   4     E    5     Operators must stay in control Forklift at all times     Hutchinson          D      2     L5
                                       Leaving forklift unattended
                                                                                21           when operational                                         Builders Site
                                                                                            Operators are not allowed to leave the Forklift when     Foreman
                                                                                             Masts are elevated in the air or when the machines
                                                                                             are left running                                         Plant Operator
                                                                       B   4     E    5     Drive the machine into a safe position clear of access   Hutchinson          D      2     L5
                                       Close down of the Forklift
                                                                                21           ways and not to impede work activities                   Builders Site
                                                                                            Lower the forks to the ground so they do not             Foreman
                                                                                             become a trip hazard for passing workers or plant
                                                                                                                                                      Plant Operator
                                                                                            Close down as per operating manual

584 Milton Road TOOWONG QLD 4066                           SWMS Developed by:   Jamie Gilbert                                                             VERSION 8 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                        Position:            National Health & Safety Co-ordinator                                                       Page 140
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.