SWMS 32 – Operating Forklift to Load/Unload Trucks
Safe Work Methods
Responsible Residual
H Controls / Work Methods
Person/s for Risk
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor &
C 5. Admin 6. PPE Review L C R
Workers are not allowed to move in front or behind
of moving plant – unless the operator has stop the
plant and he knows of your movements
BE AWARE OF MOVING PLANT AT ALL TIMES
C 4 E 5 Drive to the loading / unloading point with straight Hutchinson E 4 H
Positioning the Forklift
18 wheels then bring the Forklift to a smooth stop Builders Site 10
leaving enough space to operate the Mast Foreman
Plant Operator
B 5 E 5 Manual handling materials after loads are placed ; Hutchinson E 3 M
Operating a Forklift on site (cont.) Preparing the
22 Ensure adequate clear set down area is allocated for Builders site 6
loading/unloading area
the load to be placed onto the ground foreman
Ensure that there is a clear travel path for the plant
Nominated
into the set down area
person
Competent person will assist the operator to
manoeuvre into the loading/unloading position Plant Operator
Operator to ensure that workers are clear before
placing loads
B 4 E 5 Operators must stay in control Forklift at all times Hutchinson D 2 L5
Leaving forklift unattended
21 when operational Builders Site
Operators are not allowed to leave the Forklift when Foreman
Masts are elevated in the air or when the machines
are left running Plant Operator
B 4 E 5 Drive the machine into a safe position clear of access Hutchinson D 2 L5
Close down of the Forklift
21 ways and not to impede work activities Builders Site
Lower the forks to the ground so they do not Foreman
become a trip hazard for passing workers or plant
Plant Operator
Close down as per operating manual
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 8 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 140
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.