SWMS: 33 – Chainsaw
Safe Work Methods
H Responsible Residual
Controls / Work Methods
O Person/s for Risk
Job Steps Potential Hazards L C R 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor &
C 5. Admin 6. PPE L C R
Review
Ensure knees are bent for horizontal and angle cuts to reduce
load on the back.
Kickback C 4 H 5 To avoid kickback the tip of the chainsaw should not come Competent B 4 M
14 into contact with solid wood, or be ‘pinched’ by a log or Operator 9
timber item under pressure.
Ensure all cutting occurs with the middle of the blade at ‘full
throttle’
Methods for monitoring and reviewing effectiveness of chosen control measures
Hutchinson Builders & Subcontracted Personnel: Follow procedure and report hazards
Competent Operator: Follow procedure and report hazards
Hutchinson Builders Foreman: Ensure competent persons only use chainsaw power tools
Monitor SWMS controls on site using the Observation Form
Developed & approved on site by:
Name: Position: Date:
Matt Leeke / Terry Strahan / Jesse Joyce Site Manager/ Foreman
Workers Representative
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 148
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.