                                                                                   Hutchinson Builders – ABN:52 009 778 330

                                    WHSMP:01 – Work Health & Safety Management Plan
                                                                                                                 Version: 9.2



Following the daily site prestart employees/ leading hands will be required to inspect any scaffolding prior to
commencement of work.
Any formal inspections including weekly certified scaffolder inspections and HB Scaffold High Risk Checklist
will require records.

      16.6 Tilt up & Pre-cast Panels
All lifting, erection and installation of Tilt-Up and Pre-Cast Panels are to be performed in compliance with HB
process for construction and erection of pre-cast panels and walls (see PRA – Appendix 1 WHSMP). Prior to
the commencement of works the necessary risk assessment is to be performed and SWMS relevant to the
task are to be submitted for site management approval.
HB internal forms (Construct and Erect Tilt-Up Concrete Panels - HB-HSEQ-F-062, Erection of Precast Wall
and Column Panels Checklist - HB-HSEQ-F-064) are to be utilized throughout the works to ensure all required
steps have been addressed throughout the construction and or erection of the pre-cast panels on site.
For the erection of ‘Tilt-Up Pre-Cast Panels’ checklists are to be completed by the Panel Supervisor with a
minimum qualification of Intermediate Rigger (OHSCER223A Perform Intermediate Rigging Operations or
OHSCER224A Perform Advanced Rigging Operations). The Panel Supervisor shall define the methodology as
well as review and approve the risk assessment and SWMS specific to the task. The Site
Manager/Foreman/HSE Advisor will ensure workers are consulted through site pre-start and tool box talks
prior to all lifts. Any formal inspections and high risk checklist will require records kept and made available if
required.

      16.7    Erecting Structural Steel
The erection of structural steel is to be performed in accordance with HB process for erecting structural steel
utilising the risk control methods outlined in the PRA (see Project Risk Assessment – Appendix 1 WHSMP).
Prior to the commencement of works the necessary risk assessment is to be performed and SWMS relevant
to the task are to be submitted for site management approval.
HB internal form (Erecting Steel Structures - HB-HSEQ-F-067) is to be utilized throughout the works to ensure
all required steps have been addressed for the site works.
Erection of Structural Steel checklists are to be completed by the Supervisor with a minimum qualification of
Intermediate Rigger (OHSCER223A Perform Intermediate Rigging Operations or OHSCER224A Perform
Advanced Rigging Operations) and in alignment with the relevant Codes of Practice and Australian Standards.
The Supervisor shall define the methodology as well as review and approve the risk assessment and SWMS
specific to the task. The Site Manager/Foreman/HSE Advisor will ensure workers are consulted through site
pre-start and tool box talks prior to the steel erection works. Any formal inspections and high risk checklist
will require records kept and made available if required.

      16.8 Swing Stage Placement, Erection & Dismantling
Only a competent licensed scaffolder (CPCCLSF4001A Advanced Scaffolding (SA) or OHSCER224A Perform
Advanced Rigging Operations in QLD the state required course in safe use of swing stage and scaffold is also
required) shall be permitted to carry out placement, erection or dismantling work of swinging stage scaffold.
All works involving swing stage scaffold are to be carried out in alignment with the approved methodology
and risk control methods outlined in the Project Risk Assessment (see Project Risk Assessment – Appendix 1
WHSMP).



                                                                                                               Page 49 of 58

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.