Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
current supply to portable, mobile or moveable electrical apparatus. Testing of RCD units is to occur in
alignment with state legislative requirements (QLD / NSW 3 monthly, VIC – monthly). All electrical devises
shall be plugged into a RCD unit.
16.12 Concrete Pumping
Concrete pumps will be subject to rigorous pre-start processes prior to use on the site. The pre-start process
will identifies the registration, checks, inspections, maintenance and sign offs required designated intervals.
Operators of concrete pumps shall be licensed in accordance with regulatory requirements. Concrete pumps
are to be established and used in a manner to minimize potential risk to the worker and members of the
public. Each pipe bend and reducer shall be clearly identified and be traceable through the plant logbook.
The operators must be able to produce logbook whilst on site.
Where required traffic control shall be in place to ensure safe entry for trucks to back onto the concrete
pump.
Page 51 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.