Weekly HSE Inspection – BIG 8
HB-HSEQ-F-048
Version 9
ADDITIONAL WEEKLY ASSESSMENT ITEMS – (as required)
Rating: (√) Acceptable - (X) Unacceptable - (R) Rectified during inspection - (S) C.A.R/NCR issued -(N) Not Applicable
*WHSMP – Work Health & Safety Management Plan, MP – PP – SP – Corporate Procedure, PRA – Project Risk Assessment, SWMS – Safe Work Method Statement
HEALTH AND SAFETY ENVIRONMENTAL
No. Item Rating No. Item Rating
Formwork & falsework – PRA, SWMS:15 Noise and Vibration controlled - SP:02, PRA
1. Falls managed, exclusion signs & zones in place’ joists placed 1. Ensure that noise and vibration is monitored, PPE being worn
from below, single leading edge & working hours abided by.
Ladders and trestles - SWMS - 01 All Bunded areas empty of water - SWMS 06
2. Suitable for the task, correct setup inspected prior to use, 2.
Remove ponded water from area
removed from service if damaged
Materials Handling – PRA , SWMS:04 Spill kits on site and maintained – EMP, PRA
3. Are safe and correct mechanical aids or team lifting methods 3. Contents are maintained and adequate, spills cleaned up and
being utilised waste disposed of correctly
Excavations –PRA, SWMS 07 – PERMIT HB-HSEQ-F-078 Fauna and Flora EMP, PRA
4. Collapse controlled, barricades in place, safe access, 4.
Protected species maintained as per drawing
stockpiles away from trenches
Cranes & Lifting - PRA, Neighbour correspondence or complaints - EMP
5. Safe lifting practices near workers, warnings processes or 5. Are recorded, actioned and closed out, letter distribution also
exclusion zones in place, tag lines, recorded in register
Fire / Emergency equip maintained MP:09, PRA Sediment Control - none leaving site EMP, PRA
6. Extinguishers position at stair access/hoist, adjacent Haz / 6. Sediment fences erected & maintained, no soil on roads or in
Dangerous Goods Storage areas, 6 month tests gutters, Installed as per Civil DWG’s
Emergency exits, alarms, signs – PRA Waste Management - EMP, PRA
7. Air Horn charged, exit signs (running man) erected on levels, 7. Bins provided and exchanged regularly, segregated on site or
back up lighting maintained, at waste facility – records retained
Concrete pumps / trucks set up - PRA Weed removal – EMP, PRA
8. Set up on stable ground, clear of obstructions, exclusion zones 8. Weeds are maintained on a weekly basis to prevent
in place spreading
Traffic Management – PRA, SWMS 23 Contaminated Land – EMP, PRA
9. TMP developed to suit site conditions, deliveries and public 9.
Soils removed as per plan
interaction, compliant with council & MUTCD
Asbestos – PRA, SWMS 09
10. Licences held, exclusion in place, separation and disposal – OTHER SAFETY / ENVIRONMENTAL ITEMS:
Asbestos Management Plan, regulator notified.
Demolition PRA, SWMS 26
11. Demolition Plan, exclusion zones, methodology defined, 10.
licences, permits & notifications
Haz Chemicals & SDS - SP:01, PRA, SWMS 14
12. Supplied for Haz Subs & Dangerous Goods used on site, 11.
provide & maintain bund for storage of liquids
Confined Spaces – PRA – PERMIT – HB-HSEQ-F-075
13. Rescue plan, atmosphere tested for contaminants, trained 12.
workers, safe access
Follow Up Required or from Previous Inspections
Item Action Closed
Result / Details of Issue Further Action Required
No: (Signature of person closing action /date)
Site Manager:
Name Signature Date
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.