Skip to the record
The only place to find full transcripts.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 556, section 1. The text section number identifies this passage in the reader.

                                                                           Daily Pre-Start Meeting Form
                                                                                                    HB-HSEQ-F-054
                                                                                                        Version: 3


ABN 52 009 778 330
Project Name:                          Project #:                             Date:
Site Manager:                                       or Delegated Person:
Weather Forecast:
Expected impacts from weather:
Part 1: To Be completed by the Site Manager or Delegated Person with the
subcontractor/work group supervisors collectively.
1. Today's GENERAL work (safety, program, high risk activities, inspections, other issues, deliveries):
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
Part 2: To Be completed by The Subcontractor/Work Group Supervisor
Work Group/ Trade:                         Work Group Supervisor:                     Date:

Safety Concerns or Incidents to be reported from Yesterday’s work?                            YES    NO
If YES Details:
Other Items to be raised?                                                                  YES NO
If YES Details:
2. Today's TRADE specific work (safety, program, high risk activities, inspections, deliveries, other
issues):
2.1
2.2
2.3
2.4
Checklist
1. General works (Part 1) discussed and understood by work group.                             YES    NO
2. Today’s trade specific work discussed and understood by all workers.                       YES    NO
3. SWMS reviewed and understood and signed by all workers.                                    YES    NO
4. Required Work Permits in place and conditions understood.                                  YES    NO
5. Tools and equipment in working order with Test & Tag up to date.                           YES    NO
6. Required PPE available and fit for purpose.                                                YES    NO
7. Housekeeping issues discussed and maintained.                                              YES    NO



                                                                                                      Page 1 of 2

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.