Skip to the record
The only place to find full transcripts.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 558, section 1. The text section number identifies this passage in the reader.

                                                                                                            Task Observation
                                                                                                                            HB-HSEQ-F-052
                                                                                                                                Version: 4



1. Observers – (at least 1 subcontractor representative)
Observers Name                                             Position/Role                        Signature
1.

2.

3.


2. Observation Details
Date:                                                      Time:
Number of Persons observed:                                Company being observed:

Project Name:

Location of Observation:
Activity Observed:

Has a SWMS / Risk Assessment been conducted for the task observed?                                  Yes                     No

SWMS/JSA Title:

Have the workers been inducted and signed into the SWMS/JSA?                                        Yes                     No
Does this observation relate to one or more High Risk Activity Events? (Can be multiple selected)
           Mobile Equipment                              Working at Height                       Confined Spaces
           Power Tools                                   Lifting and Cranes                      Hazardous Materials
Does the SWMS/JSA adequately describe the sequence of basic job steps?                              Yes                   No

Are the controls on the SWMS adequate to control the risks identified, & are they                   Yes                   No
being followed?
Were there and additional risks identified?                                                         Yes                   No
Comment:

3. Observation Actions
Safe Behaviours Observed                                                                    Discussions / Feedback




At risk Conditions/ Behaviours Observed                                                         Discussion / Feedback




Further Action (if Required) Corrective Actions
To                            What                                                                       By When

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.