Hutchinson Builders – ABN:52 009 778 330
Work Health & Safety Management Plan
Appendix 8 – Emergency Response Plan
Version: 9.1
Preface
Hutchinson Builders has developed this Emergency Response Plan as the appointed Principal Contractor
A copy of the plan shall be readily available and able to be viewed by all subcontractors and clients
associated with the project.
This plan is to be reviewed (at 3 monthly intervals) or amended where deficiencies are identified, changes
occur in Hutchinson Builders’ OHSMS or project works change such that the information contained in the
plan is no longer accurate or valid. Those parties affected by any alterations shall be notified.
Emergency evacuation drills are to be performed and recorded at planned regular intervals and in
accordance with the Project Risk Assessment (refer to Fire Protection Section). Evacuation drills shall take
place where there are significant changes in the working environment or at regular 6 monthly intervals.
Emergency Response Plan Review:
Name Position Signature Date Approved
Matt Leeke Site Manager
Terry Strahan Site Foreman
Jesse Joyce Site Foreman
Review Date:
Plan Revision Table:
Page 2 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.