Site Shut Down & Storm Preparation Checklist
Version 1
Project: 71 Seaview Tce Sunshine Beach Q 4567 Date: _____________________________
Site Shut down or - Bureau of Meteorology (BoM) or official Government warning received.
ITEM Yes/No
Ensure Loose materials and objects including signage is secured and cannot blow away in a storm.
Ensure scaffold is free from excess materials
Ensure boundary fencing and barricading is secured and cannot blow away or be blown over
Ensure scaffold ties are in place and check scaffold couplers that link scaffolds together
Where required incomplete structures should be braced to prevent collapse
Dangerous goods and hazardous substances should be adequately disposed of or locked away
Review all pre-cast panel braces and ensure they are secured and locked
Ensure all block & brick walls are supported / braced and/or core filled
Ensure site hoardings have been secured
Securely lock all site containers, site sheds and buildings
Evacuate the site where it is identified that serious and damaging weather is coming and it is safe
for workers to travel from site to home
Post weather event or Shut down
ITEM Yes/No
Electricity – Prior to use ensure there has been a clearance to use live electrical sources by an
electrician
Identify any materials likely to contain asbestos containing material
Check drinking water and hand wash facilities are available
Check that workers have access to working amenities
Assess what clean-up work needs to be done
Plan the clean-up to ensure additional risks / hazards are not introduced
Consider what may go wrong during the clean-up process
Determine which tools & equipment will be needed to safely do the work
Check that the people required to operate the machinery have the right skill and competencies
and ensure less skilled workers are supervised
Be aware of worker fatigue and toolbox all workers on the signs and symptoms of fatigue
Ensure all correct PPE for the task is being correctly used by all workers
Ensure all first aid stock and rooms are suitable for treating any injuries
Check scaffold and ensure there has not been soil erosion occur from underneath the sole boards
of the scaffold. Check also that the scaffold base jacks are centred on the sole boards
Check scaffold ties and perform a monthly inspection check on all scaffold
Page 16 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.