                               HUTCHINSON BUILDERS | Established 1912


            d. Hutchinson Builders has agreed to email the residents of the private access-way
               directly to keep lines of communication open. All neighbouring parties have the site
               manager’s site contact details.
            e. Complaint Management Procedures

      Contact Matt Leeke Site Manager with the specific complaint
      Matt Leeke will address the concern on the spot if possible
      If not resolved a meeting will be held with all parties including Hutchinson’s management.

            f.   The following nuisances will be control and suppressed.



            Noise

                         Radios or amplified music will not be permitted on site
                         If jackhammers are required to be used they will be fitted with sound
                          attenuators if available. Compressors will also be sound attenuated.
                         The reversing of trucks along the access handle will be limited by providing
                          on-site turn-around facility whenever possible.

                 Vibration

                                 All piling methods will be non- vibratory and non-driven. Generally,
                                  a combination of systems involving CFA, Micro-piles and Screw-piles
                                  will be utilised.
                                 Vibrating earth working equipment, such as road rollers, will not be
                                  used. Road base and earth will, where needed, be consolidated
                                  using a sheep’s- foot style compactor.
                                 Vibration monitoring stations will be established prior to the
                                  commencement of the project.
                                 A dilapidation survey of the neighbouring houses will be undertaken
                                  prior to the commencement of the project.

                 Dust

                                 Cutting and drilling of concrete will, whenever possible, be done
                                  ‘wet’.
                                 Stockpiling of soil on site will be kept to a minimum and covered
                                  when necessary.

                 Odours and Exhaust

                              
                              Any motorised plant that produces exhaust fumes will be located
                              away from the neighbouring property boundaries.
            g. Workers Induction



M.J.Leeke                                                                                        Page 2

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.