RECORDS: Speed compliance through work site: Approx. % of compliance = _________ Comments; www.invarion.com
Set up: start time: finish time: Date:
Pack up: start time finish time: Date: Alterations & or changes to plan (give reasons why?):
Sign check times: 1- 2- 3- 4- 5- 6- Approved by: _________________
TGS effectiveness and/or suggested improvements:
Version Date Description Joins below
0 29-03-2016 Initial Drawing
30m
18-07-16 Amendment
CTM2059-2
1
2
3
w Tce
4
5
PREPA
RE
Seavie
TO
STOP
DO NO
T OVE
RTAKE
10-15m
Mc
An
all
yD
r ROA
DW
AHE ORK
AD 40 FELY
RED E SA
UCE DRIV
K R SPE
D WO ED
ROA ND
E
50
w Tce
Seavie
- Ensure any pedestrian walkways (existing ) are preserved and maintained.
- No queuing of trucks on any residential street prior to 7am.
- All trucks to turn engines off when parked.
- Street parking for residents shall be maintained at all times unless with
prior arrangement and approval.
NOTES:
- For worker safety, 40 km/h zone length is specified as 1 km maximum. There is a requirement for workers to be visible.
Table 4.7 MUTCD 2014
- Where workers are within 1.2m of travel path, a 40km/h zone shall be implimented.
- Residential and business property access shall be maintained.
- Lane width. 60km/h or less = 3.0m 70=90km/h = 3.2m 100+ = 3.4m
- Edge Clearance - Clearance between edge of traffic lane to line of traffic cones, bollards or barrier system.
(i) Posted speed limit during roadwork's up to 60km/h = 0.5m
(ii) posted speed limit during roadwork's above 60km/h = 1.0m
Ensure all relevant Permits and these plans are onsite and can be produced upon request by an authorized person.
- Cone spacing; Taper - Traffic Controller at 6m
- Lateral shift at 6m
- Merge at 6m
Closure - Lane at 12m
- Shoulder at 12m
- A Traffic Management Level 2 is responsible for installing, maintaining and removing traffic
management devices in accordance with this TGS.
- Where the TGS includes changes to regulatory signs or devices, a Sign Usage Checklist is to be completed, signed
and a copy retained by the client.
- Any existing signs that conflict with the traffic control plan shall be removed or covered during construction. All signs
that are removed shall be delivered to a storage site designated by the client.
- Signs such as symbolic workers signs and speed limits, introduced due to reduced clearances to workers, should
be covered or removed during periods when workers are no longer on site.
- Workers Symbolic and traffic Controller signs to be covered when workers and Traffic Controllers are not in attendance.
Joins above
Notes Issue Date: 29-03-16 LEGEND:
N 1. Ensure TGS has been approved. 8. Daily inspections to be completed after setup,
Client: Hutchinson Builders Traffic control ute
Start Date: TBA Work Area
2. Plan your emergency escape route & document on the pre-start. during closure & upon completion of pack up Site Contact: Matt Leeke - Construction Manager
9. Signs to be clean & legible Cones
W E 3. An accredited traffic controller must not contravene the Traffic 10. Existing signs & traffic control devices which Working Hours: All Order No: CTM2059 TMA
Controller Accreditation Scheme Approved Procedure (TCASAP) & are inappropriate to, or conflict with, the temporary Buffer zone
must direct traffic in a way stated in both the Approved Procedure work site situation shall be fully covered or removed. Work Activity: Construction Long/Short Term: Short Footpath Traffic Controller
S
& the Manual of Uniform Traffic Control Devices. Breaks shall be Job Location: Seaview Tc Sunshine Coast Day / Night: All Driveway
Print in taken as specified in TCASAP. Road Configuration: 2 way Police officer
4. Ensure a location risk assessment is undertaken prior to ALL All Signage and Equipment is in accordance
A3 ONLY with Queensland MUTCD Part 3 May 2014 Drawing Number: CTM2059-2
traffic control setups Barrier Board
NOT 5. No on site changes are allowed unless approved by & signed (Sixth Issue including Amdt.1) Traffic Method: Short term Open/Built up: Built Up
off by a Level 3 Officer Drawn By: Christopher Thomas Licence Number: Lvl 3 - ;Lvl 4 -2055
TO 6. Ensure you maintain a safe working distance from traffic Approved By: Pariss Trimm Licence Number: Lvl 3 - ; Lvl 4 - 21598 Date: Signed:
Signs shall be duplicated on the right hand side
of a one-way roadway, multi lane where practicable.
SCALE 7. Remain aware of traffic conditions and maintain line of sight Approved By: Licence Number: Lvl 3 - ; Lvl 4 - Date: Signed:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.