Skip to the record
Every meeting, every word.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 82, section 1. The text section number identifies this passage in the reader.

 

 

 

ULTIMATE POSITIONING GROUP PTY LTD
UPG ABN 12 135 812 903
33 Allison Streat
yp Bowen ills OLD 4006
P +617 3851 e300

F464 7 3282 1278
—E OLDoffice Bupgsoiutions com

 

Calibration Certificate

Trimble S6 3” DR Plus Total station with serial number 931 1 1394 was tested on the
30 June 2015 and complies with Trimble’s manufacturer specifications:

 

MANUFACTURERS SPECIFI CATION

Angle Measurement

Accuracy (Standard deviation based on DIN 18723): 3“
Automatic Level Compensator dual-axis with a working range of: +54?

Distance Measurement
ohlance Measurement

Accuracy SDV (without Reflector) according to ISO 17123-4 +2mm +2ppm
Accuracy SDV (with Reflector) according to ISO 17123-4 + 2mm +2ppm

UPG confirms the instrument mentioned was tested over established baselines at our T; timble Certified Service
Centers (TCSC), which are regularly checked using a Total Station calibrated at a NATA certified Government
baseline. As UPG baselines are regularly checked but are not a registered baseline, if required by your state
regulations, further checking at a Government Registered Baseline is recommended.

Trimble Certified Service Center. UPG will not assume liability after the unit has been transported from UPG’s
TCSC should the instrument lose calibration.

Trimble is a Quality Assured Company and is registered as a supplier under SS-EN ISO 9001.
UPG Service Centres work to AS/NZS ISO 10012:2004 guidelines, traceable to the National Standard,

All instruments are recorded under serial number and date of testing.

 

 

 

 

Yours faithfully,
Kenny Chu
www.upgsolutions.com Trimble.

Brisbane « Rockhamptori « Townsville « Sydney © Wollongong « telbourne « Adelaide * Darwin * Hobart « PNG

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.