PROJECT RISK REGISTER
Project: 71 Seaview Terrace Sunshine Beach Project Address: 71 Seaview Terrace Sunshine Beach Q 4567
Project No: 24647 Commencement Date: July 2016-July 2018
Project Duration: 110 weeks approx
Table 1 –Consequence
Level Descriptor Health and Safety Environmental $$$ Example
Low Financial Loss
1 Insignificant No Injuries No off-site impact, negligible on-site impact, few public complaints, &/or
<$500
First aid treatment, on-site release immediately No off-site impact, on-site impact easily controlled and remediated several Medium Financial Loss
2 Minor &/or
contained community complaints. $500 - $5,000
Medical treatment required, on-site release On-site release contained without assistance, no effect on ecosystem High Financial Loss
3 Moderate &/or
contained with outside assistance functions, negative local media coverage, multiple complaints received. $5,000 - $25,000
Major Extensive injuries, loss of production capability, off- Off-site impact with detrimental environmental impact attracts growing Major Financial Loss
4 &/or
site release with no detrimental effects public concern and critical state / federal media coverage. $25,000 – $200,000
Toxic release off-site with detrimental and long term effect, major public Huge Financial Loss
5 Catastrophic Death, toxic release off-site with detrimental effect &/or
outrage, political / government intervention. >$200,000
Table 2 – Likelihood Table 3 – Risk Level / Priority
CONSEQUENCES
Level Descriptor Description LIKELIHOOD
Insignificant Minor Moderate Major Catastrophic
1 2 3 4 5
The event is expected to occur in A (almost
A Almost Certain H 11 H 16 E 20 E 23 E 25
most circumstances certain)
B (likely) M 7 H 12 H 17 E 21 E 24
The event will probably occur in
B Likely C (possible) L 4 M 8 H 13 E 18 E 22
most circumstances
D (unlikely) L 2 L 5 M 9 H 14 E 19
The event might occur at some
C Possible
time E (rare) L 1 L 3 M 6 H 10 H 15
The event could occur at some Legend
D Unlikely
time
E: extreme risk; immediate reaction required (18-25)
The event may occur only in H: high risk; senior management attention needed (10-17)
E Rare
exceptional circumstances
M: moderate risk; management responsibility must be specified (6-9)
L: low risk; manage by routine procedures (1-5)
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.