Original source · versioned page text
DILGP_Concurrence agency response With conditions_SDA-0816-032636 (I)
Attached to the e-mail Concurrence agency response - 28 Eenie Creek Rd, Noosaville - MCU16/0081.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
SDA-0816-032636 Our reference: SDA-0816-032636 Council reference: MCU16/0081 Your reference: 15104 Attachment 1—Conditions to be imposed No. Conditions Condition timing Development Permit for Material Change of Use – Multiple housing Type 3 – Retirement and Special Needs Schedule 7, Table 3, Item 2 – Development impacting on State Transport Infrastructure — Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Transport and Main Roads to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 1. The development must be carried out generally in accordance with At all times. the following plans: Locality Plan prepared by Oksio Designs, dated 14.06.16; Ground Floor Plan prepared by Oksio Designs dated 14.06.16; and Design Response Plan, prepared by Oksio Designs, dated 14.06.16. Department of Infrastructure, Local Government and Planning Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.