                                                              Officer:            Andrew Gaffney
                                                              Direct Telephone:   07 53296284
                                                              Our Reference:      MCU17/0024.02
                                                              Your Reference:     002826

               18 December 2024


               Sunshine Beach Surf Life Saving Club Inc
               C/- RG Strategic Australia
               PO Box 1818
               NOOSA HEADS QLD 4567
               [email protected] [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                          Planning Act 2016

               I refer to your application received on 18 October 2024, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU17/0024.02

                   Street address:              Sunshine Beach Slsc 4 The Esplanade Sunshine Beach Qld 4567

                   Real property description:   Lot 5 SP 269274

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 19 October 2017
               •       Development Permit for Material Change of Use of Premises - Entertainment & Dining
                       Business Type 1 Food & Beverages and Type 2 Recreation, Amusement and Fitness.
               In relation to the request to make a minor change to the existing approval, Council on 17 December
               2024, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change.
               B.      Amend condition 2.
               C.      Include additional Advisory Note
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                                         PO Box 141
               noosa.qld.gov.au                                                                    Tewantin QLD 4565
               [email protected]                                                                    07 5329 6500
                                                                                                             Page 1 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024
Full text of the other 10 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               PLANNING
               When Conditions must be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the use commencing, and then compliance maintained at all times while the use continues.
                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                          3.      Plan Rev. Plan/Document Name                                  Date
                                  No.

                          0000         A    Cover Page, drawn by Andrew Bock                    February
                                            Architecture                                        2017

                          1002         B    Proposed Site Plan, drawn by Andrew Bock            March 2017
                                            Architecture

                          1003         B    Proposed Site Plan – Aerial Photo, drawn by         March 2017
                                            Andrew Bock Architecture

                          1004         B    Proposed Roof Plan, drawn by Andrew Bock            March 2017
                                            Architecture

                          1005         B    Proposed Upper Floor Plan, drawn by Andrew          March 2017
                                            Bock Architecture

                          1006         C    Proposed Ground Floor Plan (from IR                 July 2017
                                            response) , drawn by Andrew Bock Architecture

                          1007         A    Proposed Lower Floor Plan, drawn by Andrew          March 2017
                                            Bock Architecture

                          1008         B    Proposed Landscape Plan, drawn by Andrew            March 2017
                                            Bock Architecture

                          2001         B    Proposed Elevations, drawn by Andrew Bock           March 2017
                                            Architecture

                          2002         B    Proposed Elevations, drawn by Andrew Bock           March 2017
                                            Architecture

                          2003         B    Proposed Sections A & B, drawn by Andrew            March 2017
                                            Bock Architecture

                          2004         B    Proposed Sections C & D, drawn by Andrew            March 2017
                                            Bock Architecture

                          2005         B    Proposed Sections E & F, drawn by Andrew            March 2017
                                            Bock Architecture

                          3001         A    Perspective Views North and North West,             February
                                            drawn by Andrew Bock Architecture                   2017



                                                                                                       Page 2 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Page 3

                          3.      Plan Rev. Plan/Document Name                              Date
                                  No.

                          3002         B    Perspective Views West and South West,          March 2017
                                            drawn by Andrew Bock Architecture

                          3003         A    Perspective Views East and North East, drawn    February
                                            by Andrew Bock Architecture                     2017

                          3004         A    Perspective Views View to Entry and Deck        February
                                            Lounge, drawn by Andrew Bock Architecture       2017

                          3005         B    Aerial View showing Height line, drawn by       March 2017
                                            Andrew Bock Architecture

                          3006         B    Views showing Height line, drawn by Andrew      March 2017
                                            Bock Architecture

                          4001         A    Colours and Textures of Sunshine Beach,         February
                                            drawn by Andrew Bock Architecture               2017

                          4002         A    Proposed Material Palette, drawn by Andrew      February
                                            Bock Architecture                               2017

                          SDD11        A    Main Level Floor Plan Proposed – Part Plan,     October
                                            drawn by Andrew Bock Architecture               2024

                          SDE01        A    Main Level Floor Plan Proposed – Extg Terrace   October
                                            Glazing Southeast Elevation - drawn by          2024
                                            Andrew Bock Architecture
                                            Annotated by Noosa Council

                          SDE02        A    Main Level Floor Plan Proposed – Extg Terrace   October
                                            Glazing North East Elevation - drawn by         2024
                                            Andrew Bock Architecture
                                            Annotated by Noosa Council

                      The following plans require amendment.

                         Plan No.           Rev.   Plan/Document Name                          Date

                         SD-01              1      ROOF CLOSURE CONCEPT – PAGE 01              JULY 22

                         SD-03              -      ROOF CLOSURE CONCEPT – PAGE 03 – JULY 22
                                                   SECTION

                         Amendments         The envelope of the proposed roof is shown outside the site/ lease
                                            area and is not approved.
                                            Provide an amended plan and section which shows the roof within
                                            the site /lease area.

                      *(Refer to Advisory Note)




                                                                                                   Page 3 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Page 4

                      Building Height
               4.     The maximum height of the development must not exceed 11 metres above the finished
                      ground level and the natural ground level.
               5.     Certification must be submitted to Council from a Licensed Surveyor which certifies that the
                      building does not exceed the maximum height requirement of this Decision Notice.
                      Performance Bond
               6.     Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Operational Works. The cash bond or trading bank
                      guarantee will be returned on performance of the conditions of approval less any costs
                      incurred by Council in respect of enforcing performance of this permit. Council reserves the
                      right to call upon the bond or guaranteed sum to effect compliance with conditions.
                      Building appearance
               7.     Roof materials must be non-reflective and the building must be finished with muted earth
                      tones to minimise the visual impact of the development and blend in with the sites natural
                      setting, and be in accordance approved plan 4001 & 4002 Revision A, drawn by Andrew
                      Bock, dated February 2017.
               8.     The building must be finished in a mix of light-weight materials reflective of the sites natural
                      setting and be in accordance with approved plan 4002 Revision A, drawn by Andrew Bock,
                      dated February 2017.
                      NOISE
               8.     All amplified noise at the premises must be conducted through a sound limiting device at
                      all times to ensure that noise does not exceed the following:
                      i.      between 6a.m. and 10p.m.—the adjusted maximum sound pressure level LA10, plus
                              adjustments for tonal and impulse components, exceeding the background level LA90
                              by more than 10dB(A);
                      ii.     between 10p.m. and 6a.m.—the sound pressure level LOCT10, in a full octave band
                              with centre frequencies from 63HZ to 2000HZ, exceeding the background level
                              LOCT90 by more than 8dB in any octave band.
                      Condition 8 i and ii shall apply for 12 months commencing 22 May 2020, unless further
                      extended by Council in writing. After that time if not extended by Council in writing condition
                      8 iii and iv shall apply:
                      iii.    Noise emanating from the premises including amplified or non-amplified noise and
                              patron noise prior to 10.00pm must not exceed 90dBC, fast response, when
                              measured approximately 3 metres from the source of the noise; and
                      iv.     Noise emanating from the premises including amplified or non-amplified noise and
                              patron noise after 10.00pm must not exceed 85dBC, fast response, when measured
                              approximately 3 metres from the source of the noise.
               9      The sound limiting device is to have a locking mechanism, which is to be locked at all times
                      except for inspection or maintenance work on the device.
               10     Access to the sound limiting device, except for maintenance work, is restricted to the
                      licensee, nominee and the person in charge of the premises at the time.
               11     The sound limiting device must be checked and if necessary calibrated by a qualified acoustic
                      engineer at least every 12 months to ensure compliance with the conditions of the license.
                      Evidence of the sound limiting device calibration must be made available to an investigator
                      or police on request.
               12     Air-conditioning and refrigeration plant noise levels must not exceed the following:
                      a.      Between 10.00pm and 7.00am no more than 3dB(A) above the background level; or


                                                                                                        Page 4 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Page 5

                      b.      Between 7.00am and 10.00pm no more than 5dB(A) above the background level
               13     Delivery vehicles and deliveries must not be audible:
                      a.      On a business day or Saturday, before 7.00am or after 7.00pm
                      b.      On any other day before 8.00am or after 7.00pm
                      Hours of Operation
               14     The use may operate 7 days a week from 10am to 12am (with the exception of New Year’s
                      Eve where it may operate until 2am). The outdoor dining area is not to be utilised after 10pm.




                                                                                                      Page 5 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Page 6

                      Car Parking
               15     The existing carparking area adjacent to the surf club building must be upgraded. The works
                      must be generally in accordance with drawing number 1006 Revision C prepared by Andrew
                      Bock Architecture and undertaken in accordance with an Operational Works approval and
                      must include in particular:
                      a.      detail to demonstrate that sufficient area is provided for delivery/service vehicle
                              movements including clearances;
                      b.      materials and surface treatments to prioritise pedestrian movements and other
                              “shared” areas;
                      c.      signage to designate pedestrian paths, shared areas and vehicle movement areas;
                      d.      bollard and seating design and other surface treatments in accordance with Council’s
                              “look and feel” (Council’s design principles and local colour palette);
                      e.      detail to clearly indicate stormwater drainage paths;
                      f.      a reconfiguration of the carparking access, aisles and spaces to improve performance.
               16     Car parking in Webb Road must be upgraded to provide 4 additional on street car park
                      spaces and include in particular provide:
                      a.      filling, roadworks and drainage works;
                      b.      linemarking;
                      c.      dimensions and grades in accordance with AS/NZS2890.1:2006.
                      The proposed works are to be undertaken in accordance with an Operational Works
                      approval. The works must be generally in accordance with drawing number 16636-SK01
                      Revision A prepared by TOD Noosa.
                      Paving Treatment of Vehicle Movement Areas
               17     Alternative materials, surface patterns, or threshold treatments must be used to articulate the
                      pavement treatment of vehicle movement areas, shared areas and pedestrian paths.
               18     A Construction Management Plan for the development must be submitted to and approved
                      by Council at least 5 working days prior to the commencement of any Building works or at
                      least 5 working days prior to the pre-start meeting for Operational Works. The Construction
                      Management Plan shall include but not be limited to:
                      a.      site working hours;
                      b.      communication and consultation processes with surrounding premises;
                      c.      control and suppression of –
                              (i)      noise
                              (ii)     vibration;
                              (iii)    dust;
                              (iv)     odours and exhausts control; and
                              (v)      site working hours
                      d.      employee and contractor induction and education processes.
               19     A Traffic Management Plan for each separate construction phase of the development must
                      be submitted to and approved by Council at least 5 working days prior to the commencement
                      of any works or at least 5 working days prior to the pre-start meeting for Operational
                      Works. The Traffic Management Plan must include but not be limited to:
                      a.      limiting the routes for the heavy vehicles to the major road network and define the route
                              to the site;
                      b.      indicate provision for on-site and off-site parking and shuttle buses (if required) for the
                              required workforce;


                                                                                                          Page 6 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Page 7

                      c.      indicate the location of loading and unloading areas;
                      d.      indicate the location of any “holding” areas for heavy vehicles;
                      e.      operating hours.
               20     Construction staff must not park within the Council carparks in Belmore Terrace, Duke Street,
                      Webb Road or any other surrounding street. Parking must either be on site or at a suitable
                      off-site location serviced via a shuttle bus. Details must be included in the Traffic
                      Management Plans for the site.
                      Bicycle/Scooter Provision
               21     Four bicycle racks (capable of accommodating 8 bikes) and 4 scooter spaces must be
                      provided on site at the rear of the building. The works must be undertaken in accordance
                      with an Operational Works approval and clearly shown on the plans for carparking.
                      Stormwater Drainage
               22     The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and must include in particular:
                      a.      Connection of any new works on site and in the carparking area to the existing
                              stormwater drainage system;
                      b.      The works in Webb Road must be generally in accordance with drawing number
                              16636-SK01 Revision A prepared by TOD Noosa and include sufficient detail:
                              i.       To quantify the catchment and calculate runoff to the proposed inlet and define
                                       overland flow component bypassing the inlet in a 1% AEP event
                              ii.      To demonstrate improved inlet capture
                              iii.     To demonstrate how the adjacent 1in 4 fill batter is to be stabilised to avoid scour
                                       when flows bypass the proposed inlet
                              iv.      To demonstrate that cars parked in the adjacent carparking spaces will not be
                                       flooded in a 1% AEP event
                      Geotechnical Stability
               23     All works must be carried out in accordance with a Geotechnical Report (or part thereof)
                      prepared by a qualified person* and endorsed through an Operational Works approval.
                      *(Refer to Advisory Note)
               24     Certification must be submitted to Council from a qualified person* which certifies that the
                      development has been constructed in accordance with the Geotechnical Report for the
                      development and that the development has a minimum factor of safety against landslip of
                      1.5 in the long term.
                      *(Refer to advisory Note)
                      Earthworks and Retaining Walls
               25     All fill and associated batters must be undertaken in accordance with an Operational Works
                      approval, and contained entirely within the subject site unless written permission from the
                      respective landowner(s) is provided to Council.
               26     All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               27     Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:


                                                                                                            Page 7 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Page 8

                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
                      Landscaping Works
               28     The development site must be landscaped. The works must be undertaken in accordance
                      with Planning Scheme Policy 3 – Landscaping Plants and Guidelines for that specific area
                      and must include in particular the works shown on the Approved Plans.
               29     All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               30     All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
                      Retention of Existing Trees and Vegetation
               31     All trees and vegetation identified for retention must be protected in accordance with AS
                      4970, Protection of trees on development sites.
               32     A “no clearing zone” must be established and maintained over the existing vegetation on the
                      subject site. The following activities must not be carried out within the no clearing zone:
                      a.      clearing, cutting down, poisoning, lopping or pruning of native vegetation which is
                              indigenous to, or planted within, the zone
                      b.      soil/spoil dumping and/or compacting
                      c.      soil excavation, other than for planting indigenous native plants.
                      The following exceptions apply:
                      i.      declared plants under the Land Protection (Pest and Stock Route Management) Act
                              2002 and sub-ordinate Regulation 2003, and any Council Listed Environmental
                              Weeds, Exotic Grasses and other plants identified in writing by Council
                      ii.     indigenous native trees which pose a well-founded threat to persons or property as
                              approved in writing by Council
               5.     REASONS FOR APPROVAL

               The Assessment Manager considers the decision conflicts with the planning scheme and the
               following are sufficient grounds to justify the decision despite the conflict:
               1.     The proposed Entertainment & Dining business Type 1 Food & Beverage use is associated
                      with the Surf Club use.
               2.     The proposed development seeks to redevelop the existing surf club, will maintain the same
                      footprint and will result in a significantly improved facility for residents and visitors to Sunshine
                      Beach.
               3.     The proposal will result in improvements to existing on street carparking and pedestrian
                      access pathways in the area, improving access to carparking and safety for pedestrians.
               6.     REFERRAL AGENCIES

               Not Applicable
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:


                                                                                                            Page 8 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Page 9

                       Infrastructure Charges
               1.      This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in
                       accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning
                       Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted
                       Charges).
                       Other
               2.      For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
                       for the development, a qualified person is considered to be a person who:
                       a.     is a Registered Professional Engineer of Queensland (RPEQ); and
                       b.     has a degree in civil engineering or engineering geology; and
                              has a minimum of 5 years experience in the field of geotechnical engineering or
                              engineering geology.
                       Resubmission of Amended Documents Required
               3.      The conditions of this Decision Notice require resubmission of the plans to Noosa Council
                       with amendments for approval by the Manager of Planning. Please address the amended
                       plan/s to Council’s Development Assessment Branch with the Reference No.
                       MCU17/0024.02.
               8.      PROPERTY NOTES

               Not Applicable
               9.      VARIATION APPROVAL DETAILS

               Not Applicable
               10.     FURTHER DEVELOPMENT PERMITS REQUIRED

                   Type of Development Permit Required            Subject of the required Development Permit

                   Development Permit for Operational Works       Carparking, earthworks/retaining walls,
                                                                  stormwater, landscaping

                   Development Permit for Building Works          All building work

               11.     SUBMISSIONS

               Not Applicable
               12.     SELF ASSESSABLE CODES

               The following codes for self-assessable development related to the development approval issued
               under this Decision Notice must be complied with.
               •       Advertising Devices Code
               13.     RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.




                                                                                                      Page 9 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Page 10

               14.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.

               Yours faithfully,




               Andrew Gaffney
               Senior Development Planner
               Enc:     Appeal Rights
                        Approved Plans/Documents


               DECISION NOTICE HISTORY
               •     Original Decision Notice – 19 October 2017.

               •     Decision Notice - Minor MCU17/0024.01 – 21 May 2020, with an
                     amendment to condition 8

               •     Decision Notice - Minor MCU17/0024.02 – 17 December 2024,
                     amend condition 2.; include additional Advisory Note.




                                                                                                     Page 10 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Page 11

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 11 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Used in these records

About this file

File size
191 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - Minor Change Existing Approval MCU17 0024 02 [As Published].pdf · 191 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.