Skip to the record
Accept no substitutions.

Council archive · source document

SUPERSEDED - Minor Change Existing Approval MCU17 0024 02 [As Published] · MCU17/0024.02

of 11

Text shows just the words. Original shows the document exactly as it was published.

                      c.      indicate the location of loading and unloading areas;
                      d.      indicate the location of any “holding” areas for heavy vehicles;
                      e.      operating hours.
               20     Construction staff must not park within the Council carparks in Belmore Terrace, Duke Street,
                      Webb Road or any other surrounding street. Parking must either be on site or at a suitable
                      off-site location serviced via a shuttle bus. Details must be included in the Traffic
                      Management Plans for the site.
                      Bicycle/Scooter Provision
               21     Four bicycle racks (capable of accommodating 8 bikes) and 4 scooter spaces must be
                      provided on site at the rear of the building. The works must be undertaken in accordance
                      with an Operational Works approval and clearly shown on the plans for carparking.
                      Stormwater Drainage
               22     The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and must include in particular:
                      a.      Connection of any new works on site and in the carparking area to the existing
                              stormwater drainage system;
                      b.      The works in Webb Road must be generally in accordance with drawing number
                              16636-SK01 Revision A prepared by TOD Noosa and include sufficient detail:
                              i.       To quantify the catchment and calculate runoff to the proposed inlet and define
                                       overland flow component bypassing the inlet in a 1% AEP event
                              ii.      To demonstrate improved inlet capture
                              iii.     To demonstrate how the adjacent 1in 4 fill batter is to be stabilised to avoid scour
                                       when flows bypass the proposed inlet
                              iv.      To demonstrate that cars parked in the adjacent carparking spaces will not be
                                       flooded in a 1% AEP event
                      Geotechnical Stability
               23     All works must be carried out in accordance with a Geotechnical Report (or part thereof)
                      prepared by a qualified person* and endorsed through an Operational Works approval.
                      *(Refer to Advisory Note)
               24     Certification must be submitted to Council from a qualified person* which certifies that the
                      development has been constructed in accordance with the Geotechnical Report for the
                      development and that the development has a minimum factor of safety against landslip of
                      1.5 in the long term.
                      *(Refer to advisory Note)
                      Earthworks and Retaining Walls
               25     All fill and associated batters must be undertaken in accordance with an Operational Works
                      approval, and contained entirely within the subject site unless written permission from the
                      respective landowner(s) is provided to Council.
               26     All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               27     Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:


                                                                                                            Page 7 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024

Used in these records

About this file

File size
191 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - Minor Change Existing Approval MCU17 0024 02 [As Published].pdf · 191 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.