Attachment B Engineering plans

Attached to the e-mail MCU14/0084 Attachment B (2) Engineering Plans Email 2 of 4.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

EXTEND

500mm INTO STABILISED SAND

PILING CONSTRUCTION

PILE REINFORCEMENT ccoeee

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

        
 
 

 

 

 

 

 

 

 

S++

CONCRETE SCOUR
PROTECTION

 

 

CONTINUOUS 400 HIGH
BLOCKWORK WALL TO

 

 

 

 

 

 

 

 

 

   

 

 

  

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 

 

 

 

   
    
    
 
 
 
 
 
  
 
 
 
  
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

| FORM OVERLAND FLOW
J ‘CHANNEL WITH CONCRETE
SCOUR PROTECTION
2 | |
ge
z ‘750 x 600D
g g 2 \ = J BEAM
ag5 —- :
ong = g eo
@ yi & f
$0 7~— 400 TK. CONCRETE PLUG 7]
oe E \ TO TOP OF CHS PILE —
EXISTING
GROUND BEAM / WALL J GROUND SLOPE
HEAD BEAM
4 ROWS OF 25mm DIA_ is: *,
. HOLES AT 200mm VERTICAL . |
Te 27° SAFE ANGLE FROM CRS. IN SCREW PILE ale
ea BASE OF SLOPE AT BEACH. 1
af ay GEOFABRIC INSIDE SLEEVE 2-4 ape RETESET ZO
5 * TO SCREW PILE
g dle : NOTE:
é S\3 10 TO 20mm GRAVEL ————== WHERE POSSIBLE MAINTAIN
B
G3 EXISTING
oyu 0450 0219 GROUND SLOPE
lz PILE
= Z GEOFABRIC INSIDE SLEEVE
u)5 WITH 10 TO 20mm GRAVEL ACCESS TRACK
‘ FILL TO SCREW PILE E I
.
2 \ NOM. 200 TK.
6 \ ‘CRUSHED ROCK
* DEPTH OF PILES MUST ALSO BE AT LEAST ta * *. |
7.0m BELOW NATURAL GROUND LEVEL g|& is ]
2 é —_ iy, Vv ae |__|
13. cite, IMPORTED COMPACTED
| as r—_] COHESIVE ROAD BASE
je « “ LOCALLY GROUT ANY HOLES
ae us |_| THROUGH PILED WALLS 2 LAYERS A39
“ NOTE:
teenremeres | YY “he Biomceornenic WHERE POSSIBLE MAINTAIN
HOLES AT 200m VERTICAL MIN. 600mm [~~] BENCH FILL
TYPICAL @450 CFA CRS. IN SCREW PILE oy oH NETRATEN | INTO SLOPE ALLETSTANG EGET ATION
cavity [—]
GROUT REPLACEMENT PILE | 4 4 . | ——s EXSTING
NOTTO SAE SoReW PILE WICK DRANS | oan | Ni 4 [| DRILL AND EPOXY BIDIM GEOFABRIC
AT 6.0m CRS. zl \ 200 GROUTED BARS
&
: arsoness. ACCESS TRACK
=| ¢ DRIVEWAYIFLOOR SLAB _/ TYPE TEMPORARY CONSTRUCTION
Hy) : “ Nor TOSSHE
&|__ 800 | y)
g
2
LOTS 3 BACKFILL WITH
B CONCRETE ( OBTAIN gg
| NEIGHBOURS . 8
PERMISSION ) 5 4 ~~~ ro APPROVED
WI 2
CONCRETE SCOUR 4 aA DISCHARGE POINT
aa aoe : a
CONTINUOUS 400 HIGH Feed 5 DRILL 100 DIA. THROUGH WALL
BLOCKWORK WALL TO AT 600m CRS. IN 4 aheet ATS.Om CRS. SEALED 0100
FORM OVERLAND FLOW THIS S00mn ZONE “ct DRAINS
CHANNEL WITH CONCRETE \ ak
DRILL 4 ROWS OF 25mm
EXISTING SOIL ey SCOUR PROTECTION | 4 HOLES IN PIPE AT 50mm CRS.
PROFILE CONTINUOUS 750 x 6000 " WITH GEOFABRIC FILTER SOCK
WALL HEAD BEAM ON OUTSIDE
800W x 30000 a ' at he
URETEK GROUT — ~ 4 LW :
INJECTION z | Rs .
« PILE a
& | 4
5 *
& t £
| 450
SOUTH-WEST BOUNDARY
PROTECTION DETAIL |
porte TYPE SCREW PILED
VERTICAL WICK DRAIN - WD - DETAIL
nortoscae
COPYRIGHT © ‘Associated Consutants Client Drawn Verified Project Drawing Tite ‘Seale [sheet Size
Cepghineccrance th ba a UNIVERSAL TOD AVENESS __|8.GEORGE _] PROPOSED RESIDENCE AT LOT 1,No71 | CONSTRUCTION DETAILS Jas sHOWN| _A1
jeement between Tod , a
Gaaaeytey arse. n r @) PROPERTY COMPANY B. GEORGE s.prystupa | SEAVIEW TERRACE, SUNSHINE BEACH SHEET 1 Drawing Number
Used forts spoceprjock. consulting engineers Approved RPEQ No maa 14517-OP08
sport ESTABLISHMENT. S.PRYSTUPA 1137 LOCAL AUTHORITY: (NOOSA j
Trestucion und rartsdas [|B [0.10.14] ISSUED FOR DA APPROVAL AV. fe Asta ish MARKUS HASLER. Stina ie 8 HAIN Metece O=0r 9 Date NCU APPROVAL HORIZ DATUM Sheet Revision
ssued for construction’ In the: A_|AUG 14] ISSUED FOR OP WORKS APPROVAL. AV. erquires@todcor suing << ree Joccorsutirg com nw AUGUST 2014 ROL APPROVAL VERT DATUM AHD 8 of 4 0 B
revlon description. Rev! Date |Revision Description Drawn PE eee ES ‘ ~ OPW APPROVAL RL

 

 

 

 
Log in to download the original file

Attachment B Engineering plans.pdf · 6.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.