Original PDF page 11, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ES
W
D
(BITUMEN SEALED ROAD)
ES
ESWD
ES
W
GENERAL NOTES:
D
1. This drawing is preliminary and only to be used to demonstrate the
ES
Existing Existing Power + 110 adequacy of the Hydraulic design for the Car Wash operation only.
Existing Existing . 10
ESWD
109 Existing
Sign Light Pole Sign 9.77 .83 2 Further documentation (during the construction drawing stage) will specify
10 Sign Pram Ramp 0.1
.69
ES
Existing 9 11 all pipe sizes, venting, invert levels etc...
Existing STW 10 .78 Existing
Telecom Pit 10
9 Existing Power + 2. Do not scale the drawings.
Side Entry Pit 1
Light Pole Sign 0.1
11 3. All works shall be completed by suitably qualified trades people with
BN
ESWD
.03
ES
6
N
0 0 0.0
9 9.7 11 11 current licence and insurance cover.
9.4 10 .6 7
Existing Conc Footpath
10 9 109 4. The Plumbing Contractor/Builder is to consult with the Civil / Structural
.06
BN
3
EW EW EW EW EW EW 9.6
8
EW EW EW EW 9.7 EW 9.6 0
N
10 EW EW
10 EW EW EW W Existing EW EW EW EW EW EW EW EW EW EW EW EW
11 Engineer regards to all excavations & placement of all below ground tanks
ES
10
10
ESWD
9.4
3 Existing Bus Stop 8 2 Water 110.00 & drains to ensure the integrity of the building and the foundations are not
9.6
6 9.7
9.6
Ex. Bin 9.5
BN
Existing 10 10
0
10 10 0.0 compromised due to excavation within the zone of influence to any
N
Meter
0
Sign 4. TW TW 109 11
TW Site Boundary 46.262M, 351° 59'
ES
109
0' .60 109.80 structure.
EW
.40 3. 109.40
°
BN
UP
2. 5. All works are to be constructed in accordance with the standard sewerage
.27
07
N
ESWD
1.
09 & Water Supply Laws 1998, National Construction Code (BCA), AS 2149,
1 .32 3 FSL 109.30 Landscaping
ES
9
10 , UP AS 2441, AS 2444, National Plumbing & Drainage Code, AS 3500 Parts
BN
M
N
10
9.1
9
109 6 91 FSL 109.15 1-4, all other relevant Australian Standards & local laws.
5.
EW
.20 6. The Builder/Contractor is to check interpretation of Bylaws with Council.
ES
ESWD
BN
.1 8
N
1 09 y 7. The Builder/Contractor is to verify all surface levels, invert levels & cover
ar FS
L1 FSL 109.70 over waste drainage lines are correct & obtainable before construction
FSL 109.70
FSL 109.80
.75
9 d
FSL 109.75
9.0 09
BN
ES
n
09
10 .10 commences.
N
ou
L1
11
3 No. 3,900 Litre MIN Reclaim Pits
ESWD
Existing 8. The locations of any existing services shown on the drawing/s are
FS
B Auto Bay 1
0.
ite
Sign
EW
Pre-cast concrete Reclaim Pits to be cast under the paving approximate only & have not been verified. The Builder/Contractor shall
5
0
9 .7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.