Decision Notice - 010.2009.00000917.001 [As Published] · 142009.917
2009/917
4 ASSESSMENT MANAGER CONDITIONS
1 The development shall be carried out in accordance with the approved plans listed below or as
modified herein.
2 For improvement of the sightlines of the proposed access, it is necessary to remove the shrub
(lilly pilly) adjacent to the proposed access, together with the trimming of the lower branches of
the nearby mango tree.
3 Following the approved completion of works Council’s Infrastructure Services shall be notified
with regard to providing a “yellow no standing line” from Sunset Drive to the new driveway.
4 Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
5 A site control and/or compliance bond of $500 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction Technical
Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
6 Council’s Construction Technical Officer (ph 0410 512 537), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
7 The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
8 Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
Council’s signed approved drawings and conditions by the applicant.
9 Council standards shall apply to these works unless otherwise modified herein.
10 The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Chief Executive Officer, Sunshine Coast Regional Council, and shall
forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the
Chief Executive Officer, Sunshine Coast Regional Council.
All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request the Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
of the use.
Page 2 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2009.00000917.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 54 KB (small file)
- File type
No other editions are linked here.