Council archive · source document
Development Application part 2 Report/Plans - MCU11/0254
Plans and drawings: the text below has words only, no drawings.
Very large file (41.8 MB): may take a few minutes to open.
Original PDF page 74, section 1. The text section number identifies this passage in the reader.
SWMP-Lot 4 Hofmann Drive, Noosaville 6
3.0 Water Quality Management
3.1 Background
This section of the report will outline the measures to be adopted to control the quality of stormwater
which leaves the site. The scope typically encompasses the ‘post construction’ phase of the
development however ‘construction phase’ water quality is briefly addressed.
3.2 Construction Phase
Table 3.1 has been adapted from Table C4.1 of Brisbane City Council’s (BCC) Stormwater Best
Management Practices 2000 and details the typical stormwater pollutants which may be generated
during the construction phase of the development.
Pollutant Sources
Litter Paper, construction packaging, food packaging,
cement bags and off-cuts
Sediment Unprotected exposed soils and stockpiles during
earthworks and building
Hydrocarbons Fuel and oil spills, leaks from construction equipment
Toxic Materials Cement slurry, solvents, cleaning agents, wash waters
pH Altering Substances Cement slurry, wash waters
Table 3.1 –Typical Construction Phase Pollutants
The following measures should typically be implemented prior to the commencement of
construction:
Education of all site workers in sediment and erosion procedures
Specified storage areas for construction materials and plant that are bunded to prevent
any spillages from escaping
During the construction phase of the development, silt fences should be erected downstream of all
disturbed areas. In addition erosion and sediment control devices should be regularly inspected and
maintained following storm events. An Erosion and Sediment Control Plan will be provided as part of
the operational works application process.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Report/Plans - MCU11/0254Related documentApplication case desk ↗
About this file
- File size
- 41.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.