Council archive · source document
Development Application part 2 Report/Plans - MCU11/0254
Plans and drawings: the text below has words only, no drawings.
Very large file (41.8 MB): may take a few minutes to open.
Original PDF page 77, section 1. The text section number identifies this passage in the reader.
SWMP-Lot 4 Hofmann Drive, Noosaville 9
6.0 Conclusions
This report has outlined a total water cycle strategy to be adopted in the construction and operational
works phase of the development which satisfies the acceptable solutions set out in Councils planning
scheme policies.
Wastewater minimisation strategies will be adopted to reduce the demand on Council’s
existing infrastructure.
Best Management Practices for water quality have been adopted. In this instance this equates
to the specification of baffled gross pollutant collection traps and a bio-filtration deviced sized
at a minimum of 105m2 filtration area
Due to the sites location adjacent to the point of discharge for the total catchment area, no
detention of stormwater id proposed for the site
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Report/Plans - MCU11/0254Related documentApplication case desk ↗
About this file
- File size
- 41.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.