Development Application part 2 Report/Plans - MCU11/0254

of 129

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (41.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 36, section 1. The text section number identifies this passage in the reader.

          iii. increase the use of walking, cycling, bus, train and ferry modes and minimise the use of
               the private car;
          iv. vensure that vehicle access to the development does not compromise the capacity and
               safety of the road system;
           v. not increase the scale of the road network beyond that currently planned; and
          vi. ensure that development appropriately attenuates noise from adjoining roads.
    b)   Development works are designed and constructed to a standard that meets community
         expectations, prevents unacceptable off-site impacts and optimizes whole of life cycle costs;
    c)   Roads are designed and constructed to satisfy their specified functions and provide an
         appropriate level of flood immunity (including local flooding on roads, i.e. through sufficient
         kerb storage capacity);
    d)   Development provides appropriate buffering between noise sensitive uses and the major road
         network and rail corridors;
    e)   Roads are designed and constructed to be compatible with the existing road network and
         hierarchy and to provide a safe environment for vehicular traffic, pedestrians and cyclists;
    f)   Intersections and access points are designed and constructed to retain the low key
         development style and slower pace enjoyed by residents and visitors;
    g)   Road and drainage infrastructure is constructed to a standard that minimizes ongoing
         maintenance costs;
    h)   Drainage systems are designed and constructed with capacity to effectively manage or convey
         the design flow;
    i)   Road and drainage infrastructure is compatible with other infrastructure; and j) Road and
         drainage infrastructure does not create any adverse impacts upon environmental values
         associated with biodiversity, hydrological cycles, biophysical resources and air quality.

Comment: The proposal will be able to achieve compliance to all Specific Outcomes Solutions of the
Transport Roads and Drainage Code. A detailed assessment of all engineering and works codes will
be undertaken and provided in a subsequent Operational Works application once the Material Change
of Use approval is secured.



WASTE MANAGEMENT CODE
A summary of the proposed development‘s compliance with the purpose of the Waste Management
Code is included below.

The purpose of this code is to ensure:

    a) The storage, disposal and management of solid and liquid waste are conducted in an safe and
       ecologically sustainable manner and without environmental nuisance;
    b) The on-site storage of waste does not create environmental nuisance or visual impact to
       adjoining property during the construction of a development; and
    c) Council and other licensed trade waste services are able to conveniently collect and dispose of
       waste generated by the development.

Comment: The proposal will be able to achieve compliance to all Specific Outcomes of the Waste
Management Code. The proposal provides for 8 x 1100l bins within a screened onsite storage area.
This bin provision is in accordance with Planning Scheme Policy No 9 waste management. This area
will be serviced by a hosecock/washdown facility connected to sewer.                    On site waste
collection/servicing will occur – refer waste collection vehicle turning path in Attachment D. Further
details will be provided in a subsequent Operational Works application once the Material Change of
Use approval is secured.

Used in these records

About this file

File size
41.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 Report_Plans - MCU11_0254.pdf · 41.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.