Council archive · source document
Development Application part 2 Report/Plans - MCU11/0254
Plans and drawings: the text below has words only, no drawings.
Very large file (41.8 MB): may take a few minutes to open.
Original PDF page 36, section 1. The text section number identifies this passage in the reader.
iii. increase the use of walking, cycling, bus, train and ferry modes and minimise the use of
the private car;
iv. vensure that vehicle access to the development does not compromise the capacity and
safety of the road system;
v. not increase the scale of the road network beyond that currently planned; and
vi. ensure that development appropriately attenuates noise from adjoining roads.
b) Development works are designed and constructed to a standard that meets community
expectations, prevents unacceptable off-site impacts and optimizes whole of life cycle costs;
c) Roads are designed and constructed to satisfy their specified functions and provide an
appropriate level of flood immunity (including local flooding on roads, i.e. through sufficient
kerb storage capacity);
d) Development provides appropriate buffering between noise sensitive uses and the major road
network and rail corridors;
e) Roads are designed and constructed to be compatible with the existing road network and
hierarchy and to provide a safe environment for vehicular traffic, pedestrians and cyclists;
f) Intersections and access points are designed and constructed to retain the low key
development style and slower pace enjoyed by residents and visitors;
g) Road and drainage infrastructure is constructed to a standard that minimizes ongoing
maintenance costs;
h) Drainage systems are designed and constructed with capacity to effectively manage or convey
the design flow;
i) Road and drainage infrastructure is compatible with other infrastructure; and j) Road and
drainage infrastructure does not create any adverse impacts upon environmental values
associated with biodiversity, hydrological cycles, biophysical resources and air quality.
Comment: The proposal will be able to achieve compliance to all Specific Outcomes Solutions of the
Transport Roads and Drainage Code. A detailed assessment of all engineering and works codes will
be undertaken and provided in a subsequent Operational Works application once the Material Change
of Use approval is secured.
WASTE MANAGEMENT CODE
A summary of the proposed development‘s compliance with the purpose of the Waste Management
Code is included below.
The purpose of this code is to ensure:
a) The storage, disposal and management of solid and liquid waste are conducted in an safe and
ecologically sustainable manner and without environmental nuisance;
b) The on-site storage of waste does not create environmental nuisance or visual impact to
adjoining property during the construction of a development; and
c) Council and other licensed trade waste services are able to conveniently collect and dispose of
waste generated by the development.
Comment: The proposal will be able to achieve compliance to all Specific Outcomes of the Waste
Management Code. The proposal provides for 8 x 1100l bins within a screened onsite storage area.
This bin provision is in accordance with Planning Scheme Policy No 9 waste management. This area
will be serviced by a hosecock/washdown facility connected to sewer. On site waste
collection/servicing will occur – refer waste collection vehicle turning path in Attachment D. Further
details will be provided in a subsequent Operational Works application once the Material Change of
Use approval is secured.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Report/Plans - MCU11/0254Related documentApplication case desk ↗
About this file
- File size
- 41.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.