Council archive · source document
08/1546 - Operational Works - Earthworks (Changed to MCU 27/1/09) [As Published] · 132008.1546
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
lEormhi| Development’Application (tes
Part E
Building &/or operational work assessable against a planning scheme
Nature of the works
1. Natyfe of work that requires assessment against a planning scheme:
Y Building work - Complete Table A CJ Operational work - Complete Table 8
Table A
(i) Whats the nature of the building work made assessable in the planning scheme?
[ Fit OTROS 1 News Of QING GVO F FILLING AARNE weasel + Stal
(ii) Are there any current approvals associated with this application? (e.g. material change of use)
(CINo (7 Yes - Provide details below
List of approval reference/s Date approved Date approval tapses (if known)
[4
Table B
(i) What is the natuke of the operational work made assessable in the planning scheme?
(FJ Roadworks LJ Stormwater (1 Water infrastructure [J Clearing vegetation under the planning scheme
(1 Drainage works \ _] Earthworks LO Sewerage infrastructure
(1 Landscaping Signage Lo Other - Specify
{iii) What type of approval is bel
would be diff
[1 Development Permit
[ \
(iv) Is the operational work necessary to factitate the creation of new lots (ie. subaivisionf?
sought? (WOTE: if you have indicated muttiple operational works in question (i} above and your answers to this question
it for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[1 Preliminary Approval C1 Both (Specify betow)
CINo (Yes - Specify the numbeNof lots being created
(v) Are there any current approvals associated with pis application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a fot)
(No (J Yes - Complete Table B(a)
Table B(a) List of approval referenkes Date approved Date approval lapses (if known)
1,
2, What is the dollar value of this operational work? (ie. the total value including GST. materials and labour)
Soave
Mandatory information
3. Confirm the following mandatory information accompanies this application
Confirmation of lodgement] Method of lodgement
Plans, and specifications if applicable, showing the nature and tocation of the proposed works (including the
extent of any cut and fi} A Confirmed MAL
OFFICE USE ONLY
Date received | Reference numbers
Advice for completing Part E
General advice
* Part A must also be completed for all IDAS development applications.
© The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
a1 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1546 - Operational Works - Earthworks (Changed to MCU 27/1/09) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.