Original source · versioned page text
2011 - WD-P4 architectual plans 30.04.2021
From the archive 210430 OP WORKS package.zip, inside Op Works for Noosa Mode - 41 Sunshine Beach Road. File date in the archive: 2021-05-05 10:31.
3.01
3.01
3.01
03
02
01
existing building
10 09 08 07
8269 5225 5050 5005 2485
high level glazing over carpark exhaust timber privacy screen
0 / 60 / 0 riser void
900mm radius
to corner
350 350 SC101 DP DP SC102
+ site boundary
+
A
200 store
350 + print table
+ dp
HW115
outlet over WC W123
D107 C-04 ac plant metal
1:100=
high window HW116
FFL
over 26.650 slab balustrade
over
5530
B concrete planter
HW114 SC105 SC103 2
D106 3.0
60mm
W122 over
office 1 Office 3 kitchen / staff WC 300mm
C-04 C-04 C-04 C-04 W124 min. soil depth
void void
fall
fall C
2
260
D104 W132 D105 3.0
+ D103 roof access
ll D108 G101
30mm fa DP hatch DP
B
1 : 10 0
06
DP W125 SC104 SC1
01
A A
er
glass partition wall
3.02
W101
planter
pl ant 3.02
dropper from 1:100=
C-03 05
front desk W1 07 concrete planter
ROOF 'E' & 'F' over office 2 W131 concrete planter W106 W1
d.p. 7 300mm
6270
outlet through C-04 300mm C10
S
tenancy 01 HW113 min. soil depth
W121
DP over min. soil depth 104 26
W1
60mm fa
S U N
drop ceiling void reception W
9 l 08
cobble tenancy 03 - 300m² D10 ss wal W1 rendered block wall
gla tition
stone C-04 W102
W1
03 par stone wall
ll
02
FFL 26.700 27 stone capping
W1 all
dp D102 Class 5 DP nw 6
200 io ce
outlet + D101 rtit offi 4
S H I
a stormwater catchment pit
D 110 s sp C-0
C
gla
9 8 7 6 5 4 3 2 1
101
stair 02 B 28 HWover
B W1 l
n wal 5
3.02 itio ce ay
offi 4 09
1 2 3 4 5 6 7 8 9
t vew
N E B
250 par W1
+ D11
1
ass dri w
4580
HW112 stair 03 gl C-0 d - lo
voi p be
opening in W120 over
concrete roof. r am
r
fall 102 ove
C
glass roof void lift C HWover
roo
f box
f t er
3.02 c e4 line
o
pla
n
200
+ D113 D11
2
W1
29 offi 4 10 et
W1 outl w m o unt tro
ugh
130 C-0 dp belo wa l l g e l
wal
E A C
W 103 ina
in dra
D
buffet HWover
cha n a nd
1000
in-situ concrete dp outlet. t
to ope ups
HW1er11
te
W119
ov
awning
SC114
gutter low fall r e
111 c
services & con
E
point W
y
formed concrete mech riser meeting room n dar
gutter C-04 bou
104 site
HW1er10
HWover
H R O
350
W118
ov
SC113
+ fall
formed concrete
12 +3
upstand 105 W1
1:1
HWover DP
ace 50 3
terr 341
HWover
00
109
W1
106
=6
13 +2
SC1
HWover m r
17
HW
1
ove 08
W1 50 fro ' ove w
r
12
0m
r HW107 e ' F l o
C10
8 pp ' & e
dro OF 'E DP b
over
+2
01
S
A D
mf
external venetian 14 00
W1 W1 O
R let t o
all
motorised blinds 16
260
+ SC1 W115 SC1
09 out t int 629
0
+2
external cobblestone
11 20 o utle ow po
SC110 dp ter l
drainage trough spit +2 gut
to concrete awning ROOF 'G' 00
concrete roof1:100=
60mm
0.5° fall fall
400
0
02
30mm fa
1 : 100
pebble roof with 1 : 100
planting as per
01
3.0
landscape architect's
ll
+3
03
1
drawings 0
50 400
W
400
0
04 O
R
PRELIMINARY
insitu concrete
column to detail A
I M
02
4 000 05 3.0 R Apr 2021
1
cut out in R NOT FOR CONSTRUCTION.
concrete roof E
for existing tree B 5m
3.01
0 1 2 3
06
03
Scale 1 : 100 @ A2
po box 603 noosa heads qld 4567 project issue date details drawing proj no.
commercial development
ph 07 5455 4808
41 Sunshine Beach Road, Noosa Heads
P4 30.04.21 OPW submission
working drawings 2011
N
P3 29.04.21 for consultants
email [email protected] P2 27.04.21 for consultants
abn 85 114 469 395 client
P1 21.04.21 for consultants first floor plan dwg no.
reg no 002195 BDH Group Investments Pty Ltd WD 2.02 P4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2011 - WD-P4 architectual plans 30.04.2021.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.