From: Doug Reynolds
Sent: 31 May 2018 09:48
To: David Gockel
Subject: RE: 180531 - Elanda Street - Garage Level Updated Catchment
Hi David,
I confirm that the change to the pool area will not increase the stormwater loads for the site detention previously
documented in our report.
Thanks and Regards
Doug Reynolds, Director – Civil Group, B.Eng (Civil), RPEQ, Member IPWEAQ, Member AIPM
0488 383 370 | [email protected]
Noosa: 07 5449 9600 Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
TOD consulting pty ltd, PO Box 61, Noosaville QLD 4566
2016 IPWEAQ Award winner (Projects $2Million - $5Million) – Curing a Cancer Patient: Munna Point Bridge
From: David Gockel <[email protected]>
Sent: Thursday, 31 May 2018 9:42 AM
To: Doug Reynolds <[email protected]>
Subject: 180531 ‐ Elanda Street ‐ Garage Level Updated Catchment
Good Morning Doug,
I hope you are well.
On the Elanda Street project that you assisted us with, Council have asked us
to setback the pool 1M from the street boundary which we have done – please see
updated garage level plan attached.
I also attach the compiled documents that you have provided with regard to the
Stormwater.
You will note that your catchment calculations allow for 50SQM in the pool zone
(page 03); the updated pool plan for the same zone equates to 43SQM with the
7SQM in front of the fence to be at natural ground level.
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 21 pages
Page 2
Could you kindly confirm via email that this change to the pool plan would not
increase the stormwater loads and that the stormwater documentation is still
appropriate?
We need to provide confirmation of this to Council.
If you have any questions, feel free to give me a call.
Cheers,
-David Gockel
GOCKEL ARCHITECTS
0488 112 219
[email protected]
8/729 Brunswick Street
New Farm Queensland 4005
2
Page 3
STORMWATER MANAGEMENT REPORT
Address: 61 Elanda Street, Sunshine Beach
Applicant/Client: Bev Jenner Constuctions
1. Background
Tod Consulting have been engaged to provide technical advice on the impacts of a proposed
development at 61 Elanda Street, Sunshine Beach. It is proposed to construct a duplex on the site. Tod
Consulting were also involved with a previous application for a similar development on the site in 2017.
As part of the previous application a Stormwater Management Plan (SWMP) was prepared by Aquaintel
Pty Ltd.
As the new Application is very similar in nature (and size) as the previous application that was approved
by Council it is proposed to undertake a catchment comparison with the original SWMP to guide the
detention requirements for this Application. Note that we have been in contact with Aquaintel and they
have no objections to us doing this.
2. Catchment Comparison & Recommendation
As outlined in the attached tables and marked up plans there has been a minor increase in the southern
catchment compared to the previous application. As the change is in the order of 10% it is proposed to
increase the number of Atlantis Tanks on the southern side from 10 to 12 double tanks. Note that this
report along with Aquaintel’s original SWMP will be provided to the building hydraulics consultant to
ensure compliance with the requirements outlined in these two reports.
This report should be read in conjunction with Aquaintel report dated 3 August 2017 (copy attached),
the attached plans and tables prepared by Tod Consulting and Tod Consulting drawing reference 18505
– C001
Prepared by
Doug Reynolds (RPEQ 9072)
Tod Consulting Pty Ltd
26 February 2018
1
17623 - 135 Lake Weyba Drive – Engineering Report – Rev B
Page 4
61 ELANDA STREET SUNSHINE BEACH
Comparison of new development catchments to original catchments in Aquaintel SWMP
J/N - 18505
Original Development - SWMP by Aquaintel
Table 1 from SWMP
WBNM Sub-catchment Area (m2) Developed Scenario equivalent
Impervious % impervious area
(m2)
Roof (to street) 90 100% 90
Roof 130 100% 130
Drive to Rear 36 100% 36
North East Grass 70 50% 35
North side 59 50% 29.5
South Side 65 50% 32.5
Backyard 56 10% 5.6
Total to rear 268.6 m2
spilt - north (60%) 161.16 m2
split - south (40%) 107.44 m2
New development catcments
Tod Sub-catchment Area (m2) Developed Scenario equivalent
Impervious % impervious area
(m2)
Roof (to street) 90 100% 90
Roof - north 68 100% 68
Roof - south 59 100% 59
Drive to Rear - north 62 100% 62
Pool deck area - south 50 70% 35
North side 45 50% 22.5
South Side 48 50% 24
Backyard 56 10% 5.6
Total to rear 276.1 m2
Split - north 155.3 m2
Split - south 120.8 m2
D Reynolds CHANGE North -5.86 m2
PREQ 9072 South 13.36 m2
26-Feb-18
Page 5
® O ® | 1000 $890 3800 1200 71850 a0 1000 | I \ \ I I \ I | oh | jd nee _ SITEBOUNDARY 33.551.89°56 10) ag — A ein 2800 oO 1 e oR 08 07]06 05 0403/02] 01 | Lom couRT ib | Wry | | | a | a | Ou L (et _ | _ \ _! oe ~ LLL LLL EE] / | A 1 = y RENO y oete / | ; \ i! pew 5 Ea ce a x eS =| i = ie a 7 Bs it —+ 7 i | Ble rue OD || = | ‘| Ora eeye | e- |e aera ee J) lf fl z , az Ss /i | 4 2) va | (Kew e/ || } et ie | I = | | B x it ig ao I | 8 ¢ f <= RAMP y | ° | | - X i i | DRIVEWAY Ee | I psc ® fad age ! iy Pio i i ie 3 f L ( _if otf o> SS oa 4 iI - gapaed nf gs ate / ~_ / 5) <a) Z : l | er || (0) e/|- = = is = a 5 s = = = ze ze eet —-—|—— 7) — -——- —— = = RENO? / / \ \ J e a Poy fl ot tbe s 2 re eras | i fs 2 = ! jt | 1a} / | I WS S ) J med | | } |! ©) ed , or NL | (TS S| paste ---- J pees | | ils __ 8 ENTRY SERS ch oe | _ psi jot ts _ ( E )—* _ = x tuo | Yet i Sora am i i P= S| 9 —we || ig / IB feet e 3S be / St onl is ; (\p-— i | \ag/ ||3 je al [ees [a LV | ise 11 Cagtaments WO OE z “[FLas. RENOZ (Dy AN RENO tes RENO YAM REND Be ie / B t [ew @ Ye Ye 4 | Be B 2 iF] SRL euToo0R I | : j S== 1 | ig | 8 RENOZY REND K'] ee kiss [RENO] SHOWER 3 | iss | © - rao SoS [Rew] s DRY STRIPDRAIN PE OSE HaCaT . | - F | ~—ig3_ 4 _ - NSS = 7 a \ — i ene | RENO2| o dear ps | S | BATE QD AVE sag oT ha pat i | T (Om ie! | | i ae S wo i I I TE| —_—e — _ PLANTER | i I | L | I l | = ao ~ | SITEBOUNDARY 33.551 269°56'10" “7 EMTASP188179 3520 | e | ] : | | | | cal | Wwe] 1 | \ I 01 __| GARAGE LEVEL PLAN . . = 1:100 AT A3 consulting engineers PO Box 61, Noosaville Q 4566 www.todconsulting.com CLIENT PROJECT DRAWING DETAIL G Oo Cc K E L A R Cc H I T E C T Ss Claire & 61 Elanda Street 200.01 TITLE Plan DATE XX-02-2018 3 8/729 Brunswick Street Wade Jenner Sunshine Beach Q 4567 -——— AREA Garage Level PHASE Design Development D REAL ews New Farm Queensland 4005 Lot 408 on RP48112 REV A SCALE 1:100 AT A3 DRAWN DLG : www.gockel.com.au KIER SoFr
Page 6
®
1200 4860
5110 1000
O
3930
‘DEG
7000 4330 3800
| \ \ | | \ I \ | |
| | |
i oe Boe ee __SITE BOUNDARY 33.551 89°56'10"_ «i he tee ee oe
| A y
g s
@) ay ; | AWNO1 BELOW s |
Aa MTFO1 BOX GUTTER => te 00. prey terre Eee Bee Se eoor l
i P eo ;
|
|
- C Lod \ E pace: pecans
a ' | | es ( \es : gS Noam
‘(O} et = oS cs = L | fee NA s Shame © [emospy _ - _ -4 Zz _
al (CY See.
JOR I oe Fe ! )
O-~- C 3 - a Test 4] i oe 7 - “T_ -
=| I eo ie | Is
z S | iE
= orn : LRP EE, | 2
Sip MM gL =
OG AAO MLE pte fay
() = Se “ seauow | oeP Box a South =
S| CPLINTER / BSS | lis
o — = eof B hy ¥ |
5 = Me bafp Lip | iS
5 1 s CNIS bbe pipe » eyord e
©) _ “Lh le x rae : S |Feoot L _ - I? _ -
3 | 4 f | AWND1 BELOW | | | |
Io iy , \ I i wi | = \ | |
- eee RS rae | SEBOUNDARY 33551 269%560" =| TT asPiaei9 a a
\ | | | \
| | |
| | |
oot 1 CATH EATS | | j
| | I 7 | H ,
consulting engineers
| | ?D pean or geng .
: PO Box 61, Noosaville Q 4566
01 | TERRACE LEVEL PLAN _ RPE YORL www.todconsulting.com
- 1:100 AT A3
CLIENT PROJECT DRAWING DETAIL GOCKEL ARCHITECTS
Claire & 61 Elanda Street 200.04 TITLE Plan DATE XX-02-2018 8/729 Brunswick Street
Wade Jenner Sunshine Beach Q 4567 AREA Terrace Level PHASE Design Development New Farm Queensland 4005
Lot 408 on RP48112 | REV A | SCALE 1:100 AT A3 DRAWN DLG www.gockel.com.au
Page 7
Debbie Munro
Ziganairre Pty Ltd
by email
3 August 2017
61 ELANDA STREET, SUNSHINE BEACH – STORMATER QUANTITY ASSESSMENT
Dear Debbie,
AquaIntel have been commissioned by Ziganairre Pty Ltd to undertake a stormwater quantity assessment to
address an Information Request by Noosa Shire Council dated 13 July 2017 (OPW17/0225) for the proposed
development at 61 Elanda Street, Sunshine Beach. During this investigation discussion with Noosa Council were
undertaken in order to seek clarification on the intent of the development conditions and on the status of the
legal Point of Discharge for the site. It was advised that stormwater could be discharged to the street as long as
the maximum rate at which it was discharged is limited to the requirements of the conditions and that if runoff
cannot be directed to the street then stormwater must be infiltrated underground in order to minimise any
potential issues with stormwater flows increasing into neighbouring properties as a result of the development.
SITE AND CATCHMENT
The proposed site is located at 61 Elanda Street, Sunshine Beach. An existing residence is located on the
western portion of the site. Currently stormwater is discharged to the ground within the site.
The total site area is 505 m2 and the site falls to the east at a grade of approximately 12.5%. Stormwater runoff
would currently flow overland towards the rear of the property at the South East corner of the site. No
evidence of a formalised stormwater infiltration system has been located. Total catchment area assessed is
600m2 which includes the site and rear falling verge.
Of this catchment 90m2 of roof will be discharged to the Elanda Street. The development conditions for the site
specify that a maximum flow of 25L/s at any one location is to be discharged to the road, of which it understood
that the development complies with this condition.
The catchment is shown below in Figure 1.
m: 0439 119 890 t: +7 5414 7185
e: [email protected]
w: www.aquaintel.com.au
Page 8
Figure 1: Stormwater Catchment Plan
STORMWATER QUANTITY
Calculation of Flows
The objective of this study is to calculate the stormwater flows generated from the proposed development and
to size infiltration tanks / trenches to cater for the likely flows that cannot be discharged to the Street.
Hydrologic modelling has been carried out using the WBNM software for the 2, 5, 10, 20, 50 and 100 year ARI
storm events. Calculation of flows has been completed for the proposed developed case. As it is the objective of
the development to ensure runoff is infiltrated prior to leaving site to the rear there was no need to investigate
non-worsening of peak flows and thus no need for comparison with existing conditions.
An assessment was completed on the current site layout defined in the hydraulic services plans by Ian Bradford
Plumbing Consultants (20/06/2017). These plans have highlighted that 90m2 of the site can be directed to the
street. To be conservative in the infiltration sizing it has been assumed that the remainder of the site will be
directed to one of the two proposed infiltration locations.
The contributing catchment of 505 m2 has been represented using six sub-catchments being the Front Yard,
Driveway, North East Grass, Roof (both roof areas combined) and Backyard areas. The catchment layout is
m: 0439 119 890 t: +7 5414 7185
e: [email protected]
w: www.aquaintel.com.au
Page 9
shown in Figure 1. The sub-catchment areas and fraction impervious values for the catchments are tabulated
below in Table 1.
Table 1: WBNM Sub-Catchment Areas and Fraction Impervious Values
Developed Scenario
WBNM Sub-Catchment Area (ha)
Impervious (%)
Roof (to street) 0.009 100%
Roof 0.013 100%
Drive to Rear 0.0036 100%
North East Grass 0.007 50%
North_side 0.0059 50%
South_side 0.0065 50%
Backyard 0.0056 10%
The WBNM model has been validated with comparison of peak flows derived using the Rational Method and a
reasonable agreement was achieved. The WBNM model adopts a catchment lag parameter of 1.6, which is
within the accepted range of values provided in the WBNM technical reference manual. The rainfall loss rates
adopted for this investigation are an initial and continuing loss of 0mm and 2.5mm/hr for pervious, and 0mm
and 0mm/hr for impervious.
Peak flows tabulated below in Table 2 represent the developed peak flow for each design storm event with the
critical duration varying from 5 to 15 minutes (5 minute for 100 year). Output summary provided in Attachment
1.
Table 2: Developed Scenario WBNM Peak Flows
2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
Catchment 3 3 3 3 3 3
(m /s) (m /s) (m /s) (m /s) (m /s) (m /s)
To Street 0.004 0.005 0.005 0.006 0.007 0.008
To Rear 0.019 0.023 0.026 0.029 0.033 0.037
Infiltration Trench Sizing
Discussion with Noosa Council (pers. Comm. Mark Lewis, 31 May 2016) indicated that the development would
need to demonstrate that runoff to the rear of the property for all but the most extreme rainfall events would
be infiltrated on-site so as not to cause scour or slope instability on adjacent properties. As such it was
determined that an infiltration trench or trenches would need to be sized to cater for the infiltration of all
design events up to and including the 1% AEP (1 in 100 year ARI design event).
m: 0439 119 890 t: +7 5414 7185
e: [email protected]
w: www.aquaintel.com.au
Page 10
The site is located on a beach dune. Although the geotechnical information provided by Global Testing Pty Ltd
(refer Attachment 2) did not provide an infiltration rate for the saturated hydraulic conductivity of the in-situ
sands, previous work in the area and empirical values for soils in this area indicate a saturated hydraulic
conductivity at the site were likely to be a minimum of k=2.56 x 10-3 m/s (9216 mm/hr). All calculations within
this document are based on this value. No information as to the depth to groundwater was available and it is
assumed that the base of infiltration trenches can be located at least 1.0 m above the seasonal high water table.
The methodology for the design of infiltration trenches is contained within “The WSUD Technical Design
Guidelines for South East Queensland” was adopted for this project. Chapter 7 of these Guidelines outlines two
alternate methodologies for the sizing of trenches being; the Hydrological Effectiveness Method and the Design
Storm Method. Calculation by both methods was undertaken for comparison.
The Hydrological Effectiveness Method aims to size an infiltration trench such that a specified proportion of the
mean annual runoff volume will infiltrate into the soil profile. The guidelines provide a series of design curves
based on an idealised tank/trench layout for estimation of trench size. Based on the geotechnical information
provided and an assumed trench of 0.9 m deep and 0.8m wide (porosity = 0.95 being an Atlantis Flo-Tank). This
assumes a system that the double tank system and 2 cells wide. Figure 7-7 of the Guidelines indicates that a
trench with an area equal to 1.5% of the catchment area would achieve a hydrological effectiveness of 100%.
That is, an infiltration trench with an area of 1.5% of the catchment and 1 m deep would infiltrate 100% of the
mean annual runoff from the site.
The alternate method for infiltration tank sizing is the Design Storm Method. As determined above the design
objective is to capture and infiltrate up to a 1% AEP (1 in 100 year ARI design event) runoff volume. This method
sizes a required detention volume based on the following:
- the volume of runoff from the catchment during the design event;
- the saturated hydraulic conductivity of the in-situ soil/sand; and
- the dimensions of the proposed trench including the length, width and height of the trench.
The required detention volume is the difference between the volume of runoff from the catchment and the
volume that can be infiltrated during a rainfall event.
From the hydrologic model outlined above the volume of runoff from the proposed lots was calculated (using
the WBNM model output) for the 1% AEP event.
Table 3 shows the calculated infiltration requirements and the number Atlantis Flo-Tank (double) to cater for
these infiltration requirements. Detailed calculations are provided in Attachment 3.
Table 3: Required Infiltration – Atlantis Flo-Tank (Double – 2 cells wide)
Volume Based on Volume Based on
Required
WBNM Sub- Hydrological Design Event No of Atlantis
Area (ha) 3 Infiltration Area
Catchment Effectiveness Method (m ) 2 Flo-Tank (Double)
3 (m )
Method (m ) (Vd)
Site (excluding
area draining to 0.0416 6.24 5.77 6.42 25
road)
m: 0439 119 890 t: +7 5414 7185
e: [email protected]
w: www.aquaintel.com.au
Page 11
It can be seen from Table 3 that the Design Storm Method results in marginally larger trench sizes and thus
these sizes are recommended for use on this site. The hydraulic services design has nominated two location for
the infiltration systems with one being located near the northern and southern boundaries at the rear of the
house. A flow split has also been nominated with 60% of the flow going to the northern system and 40% going
to the southern system. The following is infiltration system is recommended for the southern and norther
system:
• Southern System – 10 x Atlantis Flo-Tanks (double) (w) x 0.90m (d) x 3.4m (l)
• Northern System – 15 x Atlantis Flo-Tanks (double) (0.82m (w) x 0.90m (d) x 5.5m (l)
It is noted that there is a 3m Unity Water sewer easement in the property. It is understood that Unity water
may in some circumstances allow the infiltration trench within the easement however Unity Water would need
to be consulted.
CONCLUSION
Based on the methodology contained within the “The WSUD Technical Design Guidelines for South East
Queensland” and the geotechnical information available for the site it is recommended that a minimum
infiltration area and volume as provided in Tables 3 be installed within the development to prevent water
leaving the site. This volume and area could be accommodated by a total of 25 x Atlantis Flo-Tank (Double).
I trust this assessment of stormwater management requirements for your development meets your needs. Feel
free to contact me should you wish to discuss any of the content in this letter.
Yours faithfully,
Kelly McKendry
Water Resources Engineer / Director (RPEQ 09298)
AquaIntel Pty Ltd
Attachments
1. Hydrologic Calculations
2. Geotechnical Information
3. Trench sizing calculations
m: 0439 119 890 t: +7 5414 7185
e: [email protected]
w: www.aquaintel.com.au
Page 12
ATTACHMENT 1: Hydrologic Calculations
m: 0439 119 890 t: +7 5414 7185
e: [email protected]
w: www.aquaintel.com.au
Page 13
ATTACHMENT 2: Geotechnical Information
m: 0439 119 890 t: +7 5414 7185
e: [email protected]
w: www.aquaintel.com.au
Page 14
THE ONLY NAME IN SOILS
QBCC Licence No. 1018403
PH : 07 54 740 900
3/53 Gateway Drive, Noosaville 4566
JOB NUMBER 15/1054 SITE CLASSIFICATION REPORT
CLIENT ZIGANNAIRE PTY LTD
SITE LOCATION PROPOSED DUPLEX,
61 ELANDA STREET, SUNSHINE BEACH
REPORT DATE 21/10/2015
1. INTRODUCTION
The purpose of this report is to classify the subject allotment in accordance with Australian Standard
2870 - 2011 'Residential Slabs and Footings'. From this classification a footing system can be
recommended for the structure so as to allow adequate performance of the footings under the soil
conditions determined at the site.
Trees: There are several small to large trees on and adjacent to the proposed site. Global
Testing recommends an experienced arborist be commissioned to quantify the existing size,
location, predicted maximum height and type of these trees to aid in the design process. It is the
responsibility of the designing engineer to apply the principals of AS2870-2011 Appendix H
"Guide to Design of Footings for Trees". The classification herein excludes the effect of trees on
the site.
Please note: The site has an existing residence which is to be removed.
2. SITE DESCRIPTION
Type of Allotment Residential
Vegetation (Building Envelope) Grassed/Scattered small to large sized
mature trees
Vegetation (Allotment) Grassed/Scattered small to large sized
mature trees
Road Status Sealed
Slope 7-9% to the Rear
Surface Water will Drain Towards Rear
Will Surface water from adjoining May
allotments traverse this site
Does the site have any watercourses No
Surrounding Allotments
Left Existing Residence
Right Existing Residence
Rear Existing Residence
Depth to Weathered Rock N/a
Depth to Water Table N/a
3. SITE CLASSIFICATION AND TARGET STRATA
Based on the findings of the site investigation, the classification of the site is considered to
conform to:-
CLASS “ P ” (Due to poor bearing capacity, the presence of trees and
the removal of an existing residence - Piering Required)
(PLEASE NOTE: If not for the poor bearing capacity and trees encountered and the removal of an
existing residence, this site would have the characteristics of an 'S' site)
in accordance with Australian Standard 2870 - 2011, 'Residential Slabs and Footings,
Construction'.
15/1054 Page 1
Page 15
The target stratum for the foundation of the structure at location BH1 is the SAND at a
depth of 800mm below existing ground level.
The target stratum for the foundation of the structure at location BH2 is the SAND at a
depth of 1300mm below existing ground level.
It is the designing engineers responsibility to address the potential influence of any trees
present on or around the proposed building site.
If any fill is placed over the existing ground, the structure shall be piered through the fill
into the existing material. Further note that the placement of reactive material as fill, or cutting
of the site may change the site’s classification.
4. SOIL PROFILE
Refer to Soil Profile Report for borelog information
Whilst every effort has been made to ensure that the borelogs carried out at the subject
allotment are indicative of the soil profile over the site any discrepancy between the profile
detailed in the borelogs and that observed during construction shall be referred to Global
Testing for immediate attention.
5. MATERIALS LABORATORY TEST RESULTS
Soil Laboratory testing was not carried out on samples of the soil taken from the site because the clay
content of the material was too low for Shrink-Swell movements to be critical in the classification of
the soil profile. Determination of the classification for the site in this situation is based upon results
from Dynamic Cone Penetrometer testing performed over the site.
BOREHOLE n/a
DEPTH RANGE OF SAMPLE n/a
LIQUID LIMIT n/a
PLASTIC LIMIT n/a
PLASTIC INDEX n/a
LINEAR SHRINKAGE n/a
INSTABILITY INDEX n/a
SHRINK SWELL INDEX,Iss n/a
PREDICTED SURFACE MOVEMENT n/a
Please note that the Plasticity Index (PI) determined by the Atterberg Test may be correlated to an
Instability Index (Ips)with reference to the results of extensive testing carried out by others, notably,
Dr P Mitchell, ‘Footings for Small Scale Domestic Structures, ’March 1990.
Yours Sincerely,
MICHAEL PINKNEY. (Laboratory Manager)
15/1054 Page 2
Page 16
LIMITATIONS
Recommendations given in this report are based on the information supplied by the client regarding the
proposed building construction in conjunction with the findings of the investigation. Any change in
construction type, building location or omission in the client supplied information, may require additional
testing and/or make the recommendations invalid.
The recommendations herein identify a target soil stratum into which the footings are to be founded. The
target stratum has been located by the depth in mm of the target stratum's upper horizon boundary below
the existing ground surface level at the time of the site investigation. Any cutting or filling works and any
surface erosion or deposits subsequent to the site investigation, will alter the measured location of the
stratum relative to the surface. Where required, the author should be notified in such cases to confirm the
location of the target stratum.
The description of the soil given in the Soil Profile section of this report is intended as a brief overview of
the soil's primary constituents. For a detailed classification of the soil, the reader should refer to the Soil
Profile Reports and/or Borehole Reports attached to this report.
Every reasonable effort has been made to locate the test sites so that the borehole profiles are
representative of the soil conditions within the area investigated. The client should be made aware
however, that exploration is limited by time available and economic restraints. In some cases soil
conditions can change dramatically over short distances, therefore, even careful exploration programs may
not locate all the variations.
If soil conditions different from those shown in this report are encountered or are inferred from other
sources, then the author must be notified immediately.
This report may not be reproduced except in full. The information and drawings provided with this report
shall only be used and will only be applicable for the development shown on the client supplied
information provided for this site.
Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan shall not be
used for any building construction or costing calculations. The purpose of the plan is to show approximate
location of field tests only.
Any changes made to these recommendations by persons unauthorised by the author will legally be
interpreted as that person assuming the responsibility for the long-term performance of the footing system.
The recommendations contained in this report have not taken into consideration the long term effects of
any previous, current or potential subsurface work by mining companies or potential slope instability
problems. At the time of writing this report neither our client (nor his agent) nor the local authority had
made the author aware that these problems may be affecting this allotment. If a mining subsidence or
slope stability assessment is required for this allotment, the recommendations of a suitably qualified
geotechnical engineer should be sought.
15/1054 Page 3
Page 17
THE ONLY NAME IN SOILS
SOIL PROFILE REPORT
CLIENT: Zigannaire Pty Ltd AUTHORIZED Deb Macnaught
BY:
PROJECT: 61 Elanda Street, DATE TESTED: 20/10/2015
Sunshine Beach JOB NO: 15/1054
Drilling Method: Jacro 105 100mm. Borehole
No: 1
Description PENET. Est. Bearing
Depth (blows per 100mm)
(mm) Capacity
1 2 3 4
(kPa)
0 SAND (SP) - Fine to medium grained,
brown, moist, loose.
100 2 50
200 2
300 2
400 2 50
500 2
600 2
700 2 50
800 SAND (SP) - Fine to medium grained, grey, 100
3
moist, medium-dense.
900 3
1000 3
1100 3 100
1200 3
1300 3
1400 4 125
1500 4
1600
1700
1800
1900
2000 Hole Terminated.
2100
2200
2300
2400
2500
15/1054 Page 4
Page 18
THE ONLY NAME IN SOILS
SOIL PROFILE REPORT
CLIENT: Zigannaire Pty Ltd AUTHORIZED Deb Macnaught
BY:
PROJECT: 61 Elanda Street, DATE TESTED: 20/10/2015
Sunshine Beach JOB NO: 15/1054
Drilling Method: Hand Auger 100mm. Borehole
No: 2
Description PENET. Est. Bearing
Depth (blows per 100mm)
(mm) Capacity
1 2 3 4
(kPa)
0 SAND (SP) - Fine to medium grained, grey,
moist, loose.
100 0.3 10
200 0.3
300 0.3
400 1 30
500 1
600 2
700 1 30
800 2
900 1
1000 SAND (SP) - Fine to medium grained, pale 30
1
grey, moist, loose.
1100 2
1200 2
1300 SAND (SP) - Fine to medium grained, pale 100
3
grey, moist, medium-dense.
1400 3
1500 Hole Terminated. 3 100
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
15/1054 Page 5
Page 19
THE ONLY NAME IN SOILS
Site – 61 Elanda Street, Sunshine Beach
15/1054 Page 6
[OCR of page images]
GLOBAL TESTING
THE ONLY NAME IN SOILS
Site — 61 Elanda Street, Sunshine Beach
15/1054 Page 6
Page 20
The only name in soils
Test Locality Plan
LEGEND
n BH - Borehole Location
PN - Dynamic Cone Penetrometer Location
PT - Percolation Test
-Trees
4m high 7m high
tree tree
2m high 8m high
5m high tree tree
tree
8m high 9%
tree slope
3m high
tree
8m high
3m high tree
trees
BH2 3m high
PN2 trees
8m high
tree 1m high
3.5m tree
1m high
tree
2m
2m high
tree
Existing Residence
(to be removed)
5-6m high palms
3m
3.5m
1m high bushes
1m high BH1
bushes PN1
7%
slope
8m high 7m high
tree tree
Not to Scale
Note: Any dimensions, contours, slope directions and magnitudes shown on the plan shall not be used for any building
construction or costing calculations. The purpose of the plan is to show the approximate location of the field tests only. All
dimensions in metres UNO .
Zigannaire Pty Ltd Job No. 15/1054
61 Elanda Street, Date Tested : 20/10/2015
Sunshine Beach Authorised:- Deb Macnaught
Page 21
ATTACHMENT 3: Trench Sizing Calculations
m: 0439 119 890 t: +7 5414 7185
e: [email protected]
w: www.aquaintel.com.au
Page 22
suitability for recharge is required and must be approved by the local authority.
7.2.7.2 Groundwater Table
A second groundwater related design consideration is to ensure that the base of an infiltration system is
always above the groundwater table. It is generally recommended that the base of the infiltration system
be a minimum of 1.0 m above the seasonal high water table.
If a shallow groundwater table is likely to be encountered, investigation of the seasonal variation of
groundwater levels is essential. This should include an assessment of potential groundwater mounding
(i.e. localised raising of the water table in the immediate vicinity of the infiltration system) that in shallow
groundwater areas could cause problems with nearby structures.
7.2.8 Building Setbacks (Clearances)
Infiltration systems should not be placed near building footings to avoid the influence of continually wet
Chapter
Chapter 7 – Infiltration
7 – Infiltration Measures
Measures sub-surface or greatly varying soil moisture content on the structural integrity. Australian Runoff Quality
Calculation of Infiltration Area INPUT Project
(Engineers Australia Number:
2006) 2014019
recommends minimum distances from structures and property boundaries (to
Methodology following WSUD Guidelines for SEQ calculated protect possible future buildings
Project: in neighbouring
Elanda Street properties) for different soil types. These values are
Infiltration
shown in Table 7-5.
Goal Seek to Zero
Permeability
7.3.6.2Design
7.3.6.2 DesignEstimates
Storm
Storm provided by Geotechnical Investigations
Approach
Approach
m/s mm/s mm/hr Table 7-5: Minimum Setback Distances (adapted from Engineers Australia 2006)
Where the design objective
for afor a particular infiltration system is peak discharge attenuation orcapture
the capture
UpperWhere
Limit the design
Permeability objective particular infiltration system is peak discharge
1.00E-01 attenuation or the
1.00E+02 360000 Saturated Hydraulic Conductivity Minimum distance from structures
and and infiltration
infiltration of a ofparticular
a particular design
design stormstorm
event,event,
thenthen the design
the design stormstorm approach
approach may may be adopted
be adopted for for Soil Type
Lower Limit (mm/hr) and property boundaries
sizing the infiltration system. Use of the design storm approach must be approved by the local authority 9216
Permeability 2.56E-03 2.56E+00
sizing the infiltration system. Use of the design storm approach must be approved by the local authority Sands >180 1.0 m
for sizing
for sizing infiltration
infiltration systems.
systems. Sandy Loam 36 to 180 2.0 m
Design
Design Storm
Storm (Qdes(Q
Selection
Selection ) des) Sandy Clay 3.6 to 36 4.0 m
Medium to Heavy Clay 0.0 to 3.6 5.0 m
The The
first first
stepstep in design
in the the design storm
storm approach
approach to sizing
to sizing the infiltration
the infiltration system
system is selecting
is selecting the design
the design storm storm
for capture
for capture and and infiltration.
infiltration. ThisThis
mustmust
occuroccur in consultation
in consultation withwith the local
the local authority
authority and generally
and will will generally
relaterelate
Designto Event
3 to
month Method
3 monthARI ARI
and and
1 year1 year
ARI ARI design
design storms.
storms. Hydrologic Effectiveness Method
7.2.9 Flow Management
Vin (Rational Method
Detention
Detention VolumeQ100 x tc)
Volume
11.44942 m3
Adopted
The following issues should be considered when Hydrological
designing Effectiveness
the flow control = 100%
structures within (i.e 100% of the mean annual runoff is inflitrated)
infiltration
The The required
required ‘detention
‘detention volume’
volume’ of anof infiltration
an infiltration system
system is defined
is defined by difference
by the the difference in inflow
in inflow and and systems:
Q100 outflow
Volume
outflowfrom WBNM
(or infiltrated)
(or infiltrated) volumes
volumes for duration
for the the duration
of a of a storm.
storm.
11 m3 From Figure 7-7
Porosity of fill in trench (0.35 for gravel, 1.0 empty,0.95 for Atlantis
The The inflow
inflow volume (V ) is(Vdetermined,
volume ) is determined,
0.95Flo-Trench)
in accordance
in accordance withwith Section
Section 6 (Detention
6 (Detention Basins)
Basins) of QUDM,
of QUDM, as the
as the
For large scale systems (i.e. infiltration basins),
% Catchment Area
the surface of Required area’
the ‘infiltration = must be flat or as 1.50%
i i close to this as possible to ensure uniform distribution of flow and to prevent hydraulic overloading on
product
product of design
of the the design
storm storm
flowflow
and and the storm
the storm duration:
duration: a small portion of the ‘infiltration area’.
W= 0.80 m 2x Double Flo-Tanks (side by side) Catchment Area (ha) Infiltration Volume (m3)
L= 8.03 m calculated from Ainf For gravel filled infiltration systems, flow should
Yard
be delivered to the ‘detention volume’ via a perforated
0.025 3.75
D D
Vi VQi desQdes Equation
Equation 7.1 7.1 pipe(s) network that is located and sized to convey the design flow into the infiltration systems and
d= 0.9 m Double Flo-Tank Lot (lessarea.
allow distribution of flows across the entire infiltration to street) 0.0416 6.24 7 – Infiltration Measures
Chapter
P= 17.7 m calculated from dimensions
Where Vi Vi = inflow
= inflow volume (for storm D) (mD3)) (m3)
duration
Where possible, ‘above design’ flows will bypass the infiltration systems. This can be achieved in a
U = Where volume (for storm duration 0.5 from Table 7-6 number of ways. For smaller applications, an overflow pipe or pit, which is connected to the
QdesQdes = design downstream drainage system, can be used. For larger applications, a discharge control pit can be
D= = design storm
storm flowflow for sizing
for sizing as outlined
as outlined in Section
in Section 5 7.3.5
7.3.5 mins 0.08333333 hr
located upstream of the infiltration system. This will function much like the inlet zone of a constructed
(Rational
(Rational , Q=, CIA/360
Method
Method Q= CIA/360 (m3/s)
(m3/s) wetland to regulate flows (1 year ARI) into the infiltration systems and bypass above design flows (> 1
Infiltration Hydrologic Effectiveness (Depth = 1m, Porosity = 1.0) - Nambour
Vo = D D = storm duration
= storm (hrs (hrs
duration x 3600 s/hr)s/hr)
x 3600 5.52 from Eqn 7.2 year ARI).
Substituting Eqnin 7.2
As outlined
As outlined in into
Section Eqn
Section 7.3
7.3.5.2, if the
7.3.5.2, infiltration
if the system
infiltration is toisform
system part part
to form of a ofdetention basinbasin
a detention or if ortheif the 100
Vd = catchment areaarea
catchment to the
to system is large
the system (> 50(>ha)
is large 50 then a fulla flood
ha) then routing
full flood 5.77
computation
routing computationmethod should
method Atlantis
be be Flo-Tank (double) =
should 25
WSUD Technical Design Guidelines for South East Queensland90
– Version 1 June 2006 7-8
usedused
to estimate design
to estimate flows.
design flows.
80
Ainf =Outflow from
Outflow the Goal
Solve
from infiltration
Seek system
for
the infiltration is viais the
Area
system via base and and
the base sidessides
of the
of infiltration
6.42media
m2
the infiltration and is
media dependent
and Atlantis Flo-Tank (double) =
is dependent 23
on the areaarea
on the and and
depth of the
depth structure.
of the In computing
structure. the infiltration
In computing fromfrom
the infiltration the walls of anofinfiltration
the walls an infiltration
Hydrologic Effectiveness (%)
70
system, Australian
system, Runoff
Australian Quality
Runoff (Engineers
Quality Australia
(Engineers 2006)
Australia suggests
2006) suggeststhat that
pressure is hydrostatically
pressure is hydrostatically
Goal Seek
distributed and and
distributed thusthus
equalequal
to half the depth
to half of water
the depth overover
of water the bed of the
the bed the 0.00
of infiltration system:
infiltration system: ADOPT 25 60
50
ª ª § d ·º dUº KU K D D
2.73 modules/m3
Vo Vo«A inf«Ainf¨ P §¨ P¸» ·¸» sat sat Equation
15.76 7.2 7.2
Equation 40
¬ ¬ © ©2 ¹¼ 2 ¹¼10001000 3.6mm/hr hydraulic conductivity
Chapter 7 – Infiltration Measures 10mm/hr hydraulic conductivity
30
36mm/hr hydraulic conductivity
100mm/hr hydraulic conductivity
Where Vo Vo
Where = outflow volume
= outflow (for storm
volume duration
(for storm D) (mD)3) (m3)
duration 20 360mm/hr hydraulic conductivity
1800mm/hr hydraulic conductivity
Ksat Ksat = saturated hydraulic
= saturated conductivity
hydraulic (mm/hr)
conductivity as provided
(mm/hr) in Step
as provided 1. 1.
in Step 3600mm/hr hydraulic conductivity
10
2
Ainf Ainf = infiltration areaarea
= infiltration (m ) (m ) 2
0
P
P = perimeter length
= perimeter of the
length of infiltration area area
the infiltration (m) (m) 0 0.5 1 1.5 2 2.5 3
Where Vd = required detention volume (m3)
Size of 'Infiltration Area' (as a % of Total Catchment Area)
d d = depth of the
of infiltration system (m) (m)
Vi = depth the infiltration
= inflow volume (m3)
system
U U = soil hydraulic conductivity moderating factor (see Table 7.5)
Vo = soil= hydraulic conductivity
outflow volume (m3)moderating factor (see Table 7.5)
Figure 7-7: Hydrologic Effectiveness of ‘Detention Storage’ for Infiltration Systems for the North Coast (Depth = 1 m and Porosity = 1.0)
D D = storm duration
= storm (hrs)(hrs)
duration
p = porosity (void = 1, gravel = 0.35)
Thus, the required detention volume (Vd) of an infiltration system can be Chapter 7 as
– Infiltration Measures
Thus, the required detention volume
Computation of the required storage will need (V d ) of an infiltration
to be carried system cancomputed
out for be computed
the
follows:
full range as
of follows:
probabilistic storm Infiltration Hydrologic Effectiveness (Depth = 1m, Porosity = 0.35) - Nambour
durations, ranging from 6 minutes to 72 hours. The critical storm event is that which results in the
highest required storage. A spreadsheet application (using equations 7.1 to 7.3) is the most convenient 100
Vi VVo V
wayVdofVdoing ithis. oIt is important to note that some storm events result in double peaks Equation
in the7.3
hyetograph
Equation 7.3
d p
p storm and these may affect the size of detention storage required.
for the particular
90
Soil Hydraulic Conductivity Moderating Factor 80
Where Vd = required detention volume (m3)
Soil is inherently non-homogeneous and field tests can often misrepresent the areal hydraulic
Hydrologic Effectiveness (%)
70
3
WSUD
conductivity Technical
WSUD Vinto
a soilDesign
of Technical =Guidelines
which
i Design inflow
Guidelines forvolume
South
stormwater (m
East
for South ) be
isQueensland
to
East – Version
infiltrated.
Queensland 1Field
June
– Version 2006 2006
1 experience
June suggests that field 7-16
tests
7-16
of ‘point’ soil hydraulic Vo conductivity
= outflow(asvolume
defined(m3)by Step 1) can often under estimate the areal hydraulic
60
conductivity of clay soils and over estimate in sandy soils. As a result, Australian Runoff Quality
(Engineers Australia 2005) p = porosity (void
recommends = 1,moderation
that gravel = 0.35)factors for hydraulic conductivities determined 50
from field test be applied as shown in Table 7-6.
Computation of the required storage will need to be carried out for the full range of probabilistic storm 40
Tabledurations, rangingFactors
7-6: Moderation from to 6 Convert
minutes Pointto 72tohours. The critical storm
Areal Conductivities event is that
(after Engineers which2005)
Australia results in the
3.6mm/hr hydraulic conductivity
highest required storage. A spreadsheet application (using equations 7.1 to 7.3) is the most convenient 30
Moderation Factor (U) 10mm/hr hydraulic conductivity
way of doing this. It is important to note that some storm events result in double peaks in the hyetograph
Soil Type 36mm/hr hydraulic conductivity
(to convert “point” Ksat to areal Ksat) 20
for the particular storm and these may affect the size of detention storage required. 100mm/hr hydraulic conductivity
Sandy soil 0.5 360mm/hr hydraulic conductivity
Sandy
Soil clay Conductivity Moderating Factor
Hydraulic 1.0 10 1800mm/hr hydraulic conductivity
3600mm/hr hydraulic conductivity
Medium and Heavy Clay 2.0
Soil is inherently non-homogeneous and field tests can often misrepresent the areal hydraulic 0
Emptying Time of a soil into which stormwater is to be infiltrated. Field experience suggests that field tests
conductivity 0 0.5 1 1.5 2 2.5 3
Size of 'Infiltration Area' (as a % of Total Catchment Area)
Emptying time is defined as the time taken to fully empty aoften
of ‘point’ soil hydraulic conductivity (as defined by Step 1) can under estimate
detention volumethe areal hydraulic
associated with an
conductivity
infiltration systemoffollowing
clay soilstheandcessation
over estimate in sandy
of rainfall. Thissoils.
is anAsimportant Australian
a result, design Runoff Quality
consideration as the
(Engineers
computation Australia associated
procedure 2005) recommends that moderation
with Equation factors that
7.3 assumes for hydraulic conductivities
the storage is empty determined
prior to the Figure 7-8: Hydrologic Effectiveness of ‘Detention Storage’ for Infiltration Systems the North Coast (Depth = 1 m and Porosity = 0.35)
from field testofbethe
commencement applied as shown
design storm in Table
event.7-6.Australian Runoff Quality (Engineers Australia 2006)
suggestsTable
an 7-6:
emptying time
Moderation of the
Factors detention
to Convert storage
Point to of infiltration
Areal Conductivities (aftersystems
Engineers to vary 2005)
Australia from 12 hours to 84
hours. For detention basins (surface systems) the emptying time must be limited to 72 hours to reduce
the risk of mosquito breeding. Moderation Factor (U)
Soil Type
(to convert “point” Ksat to areal Ksat)
Emptying time is computed
Sandy soil simply as the ratio of the volume of 0.5water in temporary storage (dimension
of storage x porosity)
Sandy clayto the infiltration rate (hydraulic conductivity1.0x infiltration area):
Medium and Heavy Clay 2.0
Emptying
1000 Vd Time
P p
te Equation 7.4 WSUD Technical Design Guidelines for South East Queensland – Version 1 June 2006 7-13
A inf K sat
Emptying time is defined as the time taken to fully empty a detention volume associated with an
infiltration system following the cessation of rainfall. This is an important design consideration as the
computation procedure associated with Equation 7.3 assumes that the storage is empty prior to the
Where te = emptying time (hours)
commencement of the design storm event. Australian Runoff Quality (Engineers Australia 2006)
3
suggests anVdemptying = time of thevolume
detention detention
(mstorage
) of infiltration systems to vary from 12 hours to 84
hours. For detention basins (surface systems) the emptying time must be limited to 72 hours to reduce
P = perimeter length of the infiltration area (m)
the risk of mosquito breeding.
Ainf = infiltration area (m2)
Emptying time is computed simply as the ratio of the volume of water in temporary storage (dimension
of storage xKporosity)
sat =tosaturated hydraulic
the infiltration conductivity
rate (hydraulic (mm/hr)
conductivity as provided
x infiltration in Step 1
area):
p = porosity (void = 1, gravel = 0.35)
1000 Vd P p
te Equation 7.4
A inf K sat
Where te = emptying time (hours)
Vd = detention volume (m3)
WSUD Technical Design Guidelines for South East Queensland – Version 1 June 2006 7-17
P = perimeter length of the infiltration area (m)
Ainf = infiltration area (m2)
Ksat = saturated hydraulic conductivity (mm/hr) as provided in Step 1
p = porosity (void = 1, gravel = 0.35)
WSUD Technical Design Guidelines for South East Queensland – Version 1 June 2006 7-17
Used in these records
Tod Consulting Stormwater Plans v2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.