Tod Consulting Stormwater Plans v2 · 132003.221172.A

Attached to the e-mail Change to DA - 132003.221172.A.msg.

of 22

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
David Gockel

From:                Doug Reynolds
Sent:                31 May 2018 09:48
To:                  David Gockel
Subject:             RE: 180531 - Elanda Street - Garage Level Updated Catchment


Hi David,

I confirm that the change to the pool area will not increase the stormwater loads for the site detention previously
documented in our report.


Thanks and Regards
Doug Reynolds, Director – Civil Group, B.Eng (Civil), RPEQ, Member IPWEAQ, Member AIPM




0488 383 370 | [email protected]
Noosa: 07 5449 9600 Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
TOD consulting pty ltd, PO Box 61, Noosaville QLD 4566

2016 IPWEAQ Award winner (Projects $2Million - $5Million) – Curing a Cancer Patient: Munna Point Bridge




From: David Gockel <[email protected]>
Sent: Thursday, 31 May 2018 9:42 AM
To: Doug Reynolds <[email protected]>
Subject: 180531 ‐ Elanda Street ‐ Garage Level Updated Catchment

Good Morning Doug,

I hope you are well.

On the Elanda Street project that you assisted us with, Council have asked us
to setback the pool 1M from the street boundary which we have done – please see
updated garage level plan attached.

I also attach the compiled documents that you have provided with regard to the
Stormwater.

You will note that your catchment calculations allow for 50SQM in the pool zone
(page 03); the updated pool plan for the same zone equates to 43SQM with the
7SQM in front of the fence to be at natural ground level.


                                                            1
Full text of the other 21 pages

Page 2

Could you kindly confirm via email that this change to the pool plan would not
increase the stormwater loads and that the stormwater documentation is still
appropriate?

We need to provide confirmation of this to Council.

If you have any questions, feel free to give me a call.

Cheers,

-David Gockel

                               GOCKEL ARCHITECTS
                                  0488 112 219
                              [email protected]
                            8/729 Brunswick Street
                           New Farm Queensland 4005




                                       2

Page 3

STORMWATER MANAGEMENT REPORT
Address:     61 Elanda Street, Sunshine Beach
Applicant/Client: Bev Jenner Constuctions
1.       Background

Tod Consulting have been engaged to provide technical advice on the impacts of a proposed
development at 61 Elanda Street, Sunshine Beach. It is proposed to construct a duplex on the site. Tod
Consulting were also involved with a previous application for a similar development on the site in 2017.
As part of the previous application a Stormwater Management Plan (SWMP) was prepared by Aquaintel
Pty Ltd.

As the new Application is very similar in nature (and size) as the previous application that was approved
by Council it is proposed to undertake a catchment comparison with the original SWMP to guide the
detention requirements for this Application. Note that we have been in contact with Aquaintel and they
have no objections to us doing this.

2.       Catchment Comparison & Recommendation

As outlined in the attached tables and marked up plans there has been a minor increase in the southern
catchment compared to the previous application. As the change is in the order of 10% it is proposed to
increase the number of Atlantis Tanks on the southern side from 10 to 12 double tanks. Note that this
report along with Aquaintel’s original SWMP will be provided to the building hydraulics consultant to
ensure compliance with the requirements outlined in these two reports.

This report should be read in conjunction with Aquaintel report dated 3 August 2017 (copy attached),
the attached plans and tables prepared by Tod Consulting and Tod Consulting drawing reference 18505
– C001




Prepared by



Doug Reynolds (RPEQ 9072)
Tod Consulting Pty Ltd
26 February 2018




                                                                                                       1
17623 - 135 Lake Weyba Drive – Engineering Report – Rev B

Page 4

61 ELANDA STREET SUNSHINE BEACH
Comparison of new development catchments to original catchments in Aquaintel SWMP

J/N - 18505
Original Development - SWMP by Aquaintel
Table 1 from SWMP
   WBNM Sub-catchment        Area (m2)     Developed Scenario   equivalent
                                             Impervious %     impervious area
                                                                   (m2)
Roof (to street)                90               100%               90
Roof                            130              100%               130
Drive to Rear                   36               100%               36
North East Grass                70                50%               35
North side                      59                50%              29.5
South Side                      65                50%              32.5
Backyard                        56                10%               5.6

                                           Total to rear                268.6 m2

                                           spilt - north (60%)         161.16 m2
                                           split - south (40%)         107.44 m2

New development catcments

    Tod Sub-catchment        Area (m2)     Developed Scenario   equivalent
                                             Impervious %     impervious area
                                                                   (m2)
Roof (to street)                90               100%               90
Roof - north                    68               100%               68
Roof - south                    59               100%               59
Drive to Rear - north           62               100%               62
Pool deck area - south          50                70%               35
North side                      45                50%              22.5
South Side                      48                50%               24
Backyard                        56                10%               5.6

                                           Total to rear                276.1 m2

                                           Split - north                155.3 m2
                                           Split - south                120.8 m2

D Reynolds                  CHANGE         North                        -5.86 m2
PREQ 9072                                  South                        13.36 m2
26-Feb-18

Page 5

®

O ®

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

| 1000 $890 3800 1200 71850 a0 1000
| I \ \ I I \ I |
oh |
jd nee _ SITEBOUNDARY 33.551.89°56 10) ag — A ein 2800 oO
1
e oR 08 07]06 05 0403/02] 01 |
Lom couRT ib | Wry | | | a |
a | Ou L (et _ | _ \ _! oe
~ LLL LLL EE] / | A 1
= y RENO y oete / | ; \ i! pew
5 Ea ce a x eS =| i = ie a 7 Bs it —+ 7 i
| Ble rue OD || = | ‘| Ora eeye
| e- |e aera ee J) lf fl
z , az Ss /i |
4 2) va | (Kew e/ ||
} et ie | I = | |
B x it ig ao I |
8 ¢ f <= RAMP y | ° | |
- X i
i | DRIVEWAY Ee | I
psc ® fad age ! iy Pio
i i
ie 3 f L ( _if otf
o> SS oa 4 iI - gapaed nf
gs ate / ~_
/ 5) <a) Z : l | er ||
(0) e/|- = = is = a 5 s = = = ze ze eet —-—|—— 7) — -——- ——
= = RENO? / / \ \
J e a Poy fl ot tbe
s 2 re eras | i fs
2 = ! jt | 1a} / | I WS
S ) J med | | } |!
©) ed , or NL | (TS
S| paste ---- J pees | | ils
__ 8 ENTRY SERS ch oe | _ psi jot ts _
( E )—* _ = x tuo | Yet i Sora am i i P=
S| 9 —we || ig / IB feet
e 3S be / St onl is ; (\p-— i | \ag/ ||3
je al [ees [a LV | ise 11 Cagtaments
WO OE z “[FLas. RENOZ (Dy AN RENO tes RENO YAM REND Be ie
/ B t [ew @ Ye Ye 4 | Be
B 2 iF] SRL euToo0R I | : j S== 1 | ig |
8 RENOZY REND K'] ee kiss [RENO] SHOWER 3 | iss |
© - rao SoS [Rew] s DRY STRIPDRAIN PE OSE HaCaT . | - F | ~—ig3_ 4 _ -
NSS = 7 a \ — i ene | RENO2| o dear ps |
S | BATE QD AVE sag oT ha pat i | T (Om ie! | |
i ae S wo i I I
TE| —_—e — _ PLANTER | i I | L | I l |
= ao ~ | SITEBOUNDARY 33.551 269°56'10" “7 EMTASP188179 3520 |
e | ] : | | |
| cal |
Wwe] 1
|
\ I
01 __| GARAGE LEVEL PLAN . .
= 1:100 AT A3 consulting engineers
PO Box 61, Noosaville Q 4566
www.todconsulting.com
CLIENT PROJECT DRAWING DETAIL G Oo Cc K E L A R Cc H I T E C T Ss
Claire & 61 Elanda Street 200.01 TITLE Plan DATE XX-02-2018 3 8/729 Brunswick Street
Wade Jenner Sunshine Beach Q 4567 -——— AREA Garage Level PHASE Design Development D REAL ews New Farm Queensland 4005
Lot 408 on RP48112 REV A SCALE 1:100 AT A3 DRAWN DLG : www.gockel.com.au

 

 

KIER SoFr

Page 6

 

®
1200 4860

5110 1000

 

 

 

O

 

 

 

 

 

3930

 

 

 

‘DEG

 

 

 

 

    

 

7000 4330 3800
| \ \ | | \ I \ | |
| | |
i oe Boe ee __SITE BOUNDARY 33.551 89°56'10"_ «i he tee ee oe
| A y
g s
@) ay ; | AWNO1 BELOW s |
Aa MTFO1 BOX GUTTER => te 00. prey terre Eee Bee Se eoor l
i P eo ;
|
|

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 
 

- C Lod \ E pace: pecans
a ' | | es ( \es : gS Noam
‘(O} et = oS cs = L | fee NA s Shame © [emospy _ - _ -4 Zz _
al (CY See.
JOR I oe Fe ! )
O-~- C 3 - a Test 4] i oe 7 - “T_ -
=| I eo ie | Is
z S | iE
= orn : LRP EE, | 2
Sip MM gL =
OG AAO MLE pte fay
() = Se “ seauow | oeP Box a South =
S| CPLINTER / BSS | lis
o — = eof B hy ¥ |
5 = Me bafp Lip | iS
5 1 s CNIS bbe pipe » eyord e
©) _ “Lh le x rae : S |Feoot L _ - I? _ -
3 | 4 f | AWND1 BELOW | | | |
Io iy , \ I i wi | = \ | |
- eee RS rae | SEBOUNDARY 33551 269%560" =| TT asPiaei9 a a
\ | | | \
| | |
| | |
oot 1 CATH EATS | | j
| | I 7 | H ,
consulting engineers
| | ?D pean or geng .
: PO Box 61, Noosaville Q 4566
01 | TERRACE LEVEL PLAN _ RPE YORL www.todconsulting.com
- 1:100 AT A3
CLIENT PROJECT DRAWING DETAIL GOCKEL ARCHITECTS
Claire & 61 Elanda Street 200.04 TITLE Plan DATE XX-02-2018 8/729 Brunswick Street
Wade Jenner Sunshine Beach Q 4567 AREA Terrace Level PHASE Design Development New Farm Queensland 4005
Lot 408 on RP48112 | REV A | SCALE 1:100 AT A3 DRAWN DLG www.gockel.com.au

 

 

Page 7

Debbie Munro
Ziganairre Pty Ltd

by email

3 August 2017

61 ELANDA STREET, SUNSHINE BEACH – STORMATER QUANTITY ASSESSMENT

Dear Debbie,

AquaIntel have been commissioned by Ziganairre Pty Ltd to undertake a stormwater quantity assessment to
address an Information Request by Noosa Shire Council dated 13 July 2017 (OPW17/0225) for the proposed
development at 61 Elanda Street, Sunshine Beach. During this investigation discussion with Noosa Council were
undertaken in order to seek clarification on the intent of the development conditions and on the status of the
legal Point of Discharge for the site. It was advised that stormwater could be discharged to the street as long as
the maximum rate at which it was discharged is limited to the requirements of the conditions and that if runoff
cannot be directed to the street then stormwater must be infiltrated underground in order to minimise any
potential issues with stormwater flows increasing into neighbouring properties as a result of the development.

SITE AND CATCHMENT

The proposed site is located at 61 Elanda Street, Sunshine Beach. An existing residence is located on the
western portion of the site. Currently stormwater is discharged to the ground within the site.

The total site area is 505 m2 and the site falls to the east at a grade of approximately 12.5%. Stormwater runoff
would currently flow overland towards the rear of the property at the South East corner of the site. No
evidence of a formalised stormwater infiltration system has been located. Total catchment area assessed is
600m2 which includes the site and rear falling verge.

Of this catchment 90m2 of roof will be discharged to the Elanda Street. The development conditions for the site
specify that a maximum flow of 25L/s at any one location is to be discharged to the road, of which it understood
that the development complies with this condition.

The catchment is shown below in Figure 1.




                                                                                     m: 0439 119 890 t: +7 5414 7185
                                                                                     e: [email protected]
                                                                                     w: www.aquaintel.com.au

Page 8

Figure 1: Stormwater Catchment Plan



STORMWATER QUANTITY

Calculation of Flows

The objective of this study is to calculate the stormwater flows generated from the proposed development and
to size infiltration tanks / trenches to cater for the likely flows that cannot be discharged to the Street.

Hydrologic modelling has been carried out using the WBNM software for the 2, 5, 10, 20, 50 and 100 year ARI
storm events. Calculation of flows has been completed for the proposed developed case. As it is the objective of
the development to ensure runoff is infiltrated prior to leaving site to the rear there was no need to investigate
non-worsening of peak flows and thus no need for comparison with existing conditions.

An assessment was completed on the current site layout defined in the hydraulic services plans by Ian Bradford
Plumbing Consultants (20/06/2017). These plans have highlighted that 90m2 of the site can be directed to the
street. To be conservative in the infiltration sizing it has been assumed that the remainder of the site will be
directed to one of the two proposed infiltration locations.

The contributing catchment of 505 m2 has been represented using six sub-catchments being the Front Yard,
Driveway, North East Grass, Roof (both roof areas combined) and Backyard areas. The catchment layout is

                                                                                     m: 0439 119 890 t: +7 5414 7185
                                                                                     e: [email protected]
                                                                                     w: www.aquaintel.com.au

Page 9

shown in Figure 1. The sub-catchment areas and fraction impervious values for the catchments are tabulated
below in Table 1.

Table 1: WBNM Sub-Catchment Areas and Fraction Impervious Values
                                                                              Developed Scenario
              WBNM Sub-Catchment                  Area (ha)
                                                                                Impervious (%)
                    Roof (to street)                0.009                            100%
                         Roof                       0.013                            100%
                     Drive to Rear                  0.0036                           100%
                    North East Grass                0.007                            50%
                      North_side                    0.0059                           50%
                      South_side                    0.0065                           50%
                       Backyard                     0.0056                           10%


The WBNM model has been validated with comparison of peak flows derived using the Rational Method and a
reasonable agreement was achieved. The WBNM model adopts a catchment lag parameter of 1.6, which is
within the accepted range of values provided in the WBNM technical reference manual. The rainfall loss rates
adopted for this investigation are an initial and continuing loss of 0mm and 2.5mm/hr for pervious, and 0mm
and 0mm/hr for impervious.

Peak flows tabulated below in Table 2 represent the developed peak flow for each design storm event with the
critical duration varying from 5 to 15 minutes (5 minute for 100 year). Output summary provided in Attachment
1.

Table 2: Developed Scenario WBNM Peak Flows

                                       2yr ARI    5yr ARI     10yr ARI   20yr ARI   50yr ARI   100yr ARI
        Catchment                         3          3           3          3          3           3
                                       (m /s)     (m /s)       (m /s)     (m /s)     (m /s)     (m /s)

        To Street                       0.004      0.005       0.005      0.006      0.007      0.008
        To Rear                         0.019      0.023       0.026      0.029      0.033      0.037


Infiltration Trench Sizing

Discussion with Noosa Council (pers. Comm. Mark Lewis, 31 May 2016) indicated that the development would
need to demonstrate that runoff to the rear of the property for all but the most extreme rainfall events would
be infiltrated on-site so as not to cause scour or slope instability on adjacent properties. As such it was
determined that an infiltration trench or trenches would need to be sized to cater for the infiltration of all
design events up to and including the 1% AEP (1 in 100 year ARI design event).




                                                                                    m: 0439 119 890 t: +7 5414 7185
                                                                                    e: [email protected]
                                                                                    w: www.aquaintel.com.au

Page 10

The site is located on a beach dune. Although the geotechnical information provided by Global Testing Pty Ltd
(refer Attachment 2) did not provide an infiltration rate for the saturated hydraulic conductivity of the in-situ
sands, previous work in the area and empirical values for soils in this area indicate a saturated hydraulic
conductivity at the site were likely to be a minimum of k=2.56 x 10-3 m/s (9216 mm/hr). All calculations within
this document are based on this value. No information as to the depth to groundwater was available and it is
assumed that the base of infiltration trenches can be located at least 1.0 m above the seasonal high water table.

The methodology for the design of infiltration trenches is contained within “The WSUD Technical Design
Guidelines for South East Queensland” was adopted for this project. Chapter 7 of these Guidelines outlines two
alternate methodologies for the sizing of trenches being; the Hydrological Effectiveness Method and the Design
Storm Method. Calculation by both methods was undertaken for comparison.

The Hydrological Effectiveness Method aims to size an infiltration trench such that a specified proportion of the
mean annual runoff volume will infiltrate into the soil profile. The guidelines provide a series of design curves
based on an idealised tank/trench layout for estimation of trench size. Based on the geotechnical information
provided and an assumed trench of 0.9 m deep and 0.8m wide (porosity = 0.95 being an Atlantis Flo-Tank). This
assumes a system that the double tank system and 2 cells wide. Figure 7-7 of the Guidelines indicates that a
trench with an area equal to 1.5% of the catchment area would achieve a hydrological effectiveness of 100%.
That is, an infiltration trench with an area of 1.5% of the catchment and 1 m deep would infiltrate 100% of the
mean annual runoff from the site.

The alternate method for infiltration tank sizing is the Design Storm Method. As determined above the design
objective is to capture and infiltrate up to a 1% AEP (1 in 100 year ARI design event) runoff volume. This method
sizes a required detention volume based on the following:

    -   the volume of runoff from the catchment during the design event;
    -   the saturated hydraulic conductivity of the in-situ soil/sand; and
    -   the dimensions of the proposed trench including the length, width and height of the trench.

The required detention volume is the difference between the volume of runoff from the catchment and the
volume that can be infiltrated during a rainfall event.

From the hydrologic model outlined above the volume of runoff from the proposed lots was calculated (using
the WBNM model output) for the 1% AEP event.

Table 3 shows the calculated infiltration requirements and the number Atlantis Flo-Tank (double) to cater for
these infiltration requirements. Detailed calculations are provided in Attachment 3.

Table 3: Required Infiltration – Atlantis Flo-Tank (Double – 2 cells wide)
                                      Volume Based on     Volume Based on
                                                                                 Required
  WBNM Sub-                             Hydrological        Design Event                           No of Atlantis
                       Area (ha)                                      3      Infiltration Area
  Catchment                             Effectiveness       Method (m )                2         Flo-Tank (Double)
                                                   3                                (m )
                                        Method (m )             (Vd)
  Site (excluding
 area draining to       0.0416              6.24                5.77               6.42                 25
       road)


                                                                                    m: 0439 119 890 t: +7 5414 7185
                                                                                    e: [email protected]
                                                                                    w: www.aquaintel.com.au

Page 11

It can be seen from Table 3 that the Design Storm Method results in marginally larger trench sizes and thus
these sizes are recommended for use on this site. The hydraulic services design has nominated two location for
the infiltration systems with one being located near the northern and southern boundaries at the rear of the
house. A flow split has also been nominated with 60% of the flow going to the northern system and 40% going
to the southern system. The following is infiltration system is recommended for the southern and norther
system:
     • Southern System – 10 x Atlantis Flo-Tanks (double) (w) x 0.90m (d) x 3.4m (l)
     • Northern System – 15 x Atlantis Flo-Tanks (double) (0.82m (w) x 0.90m (d) x 5.5m (l)

It is noted that there is a 3m Unity Water sewer easement in the property. It is understood that Unity water
may in some circumstances allow the infiltration trench within the easement however Unity Water would need
to be consulted.

CONCLUSION

Based on the methodology contained within the “The WSUD Technical Design Guidelines for South East
Queensland” and the geotechnical information available for the site it is recommended that a minimum
infiltration area and volume as provided in Tables 3 be installed within the development to prevent water
leaving the site. This volume and area could be accommodated by a total of 25 x Atlantis Flo-Tank (Double).

I trust this assessment of stormwater management requirements for your development meets your needs. Feel
free to contact me should you wish to discuss any of the content in this letter.
Yours faithfully,




Kelly McKendry

Water Resources Engineer / Director (RPEQ 09298)
AquaIntel Pty Ltd



Attachments

    1. Hydrologic Calculations
    2. Geotechnical Information
    3. Trench sizing calculations




                                                                                  m: 0439 119 890 t: +7 5414 7185
                                                                                  e: [email protected]
                                                                                  w: www.aquaintel.com.au

Page 12

ATTACHMENT 1: Hydrologic Calculations




                                        m: 0439 119 890 t: +7 5414 7185
                                        e: [email protected]
                                        w: www.aquaintel.com.au

Page 13

ATTACHMENT 2: Geotechnical Information




                                         m: 0439 119 890 t: +7 5414 7185
                                         e: [email protected]
                                         w: www.aquaintel.com.au

Page 14

             THE ONLY NAME IN SOILS
                                                                   QBCC Licence No. 1018403
                                                                   PH : 07 54 740 900
                                                                   3/53 Gateway Drive, Noosaville 4566

JOB NUMBER    15/1054     SITE CLASSIFICATION REPORT
CLIENT        ZIGANNAIRE PTY LTD
SITE LOCATION PROPOSED DUPLEX,
              61 ELANDA STREET, SUNSHINE BEACH
REPORT DATE   21/10/2015

1.   INTRODUCTION
     The purpose of this report is to classify the subject allotment in accordance with Australian Standard
     2870 - 2011 'Residential Slabs and Footings'. From this classification a footing system can be
     recommended for the structure so as to allow adequate performance of the footings under the soil
     conditions determined at the site.
     Trees: There are several small to large trees on and adjacent to the proposed site. Global
     Testing recommends an experienced arborist be commissioned to quantify the existing size,
     location, predicted maximum height and type of these trees to aid in the design process. It is the
     responsibility of the designing engineer to apply the principals of AS2870-2011 Appendix H
     "Guide to Design of Footings for Trees". The classification herein excludes the effect of trees on
     the site.

     Please note: The site has an existing residence which is to be removed.

2.   SITE DESCRIPTION
     Type of Allotment                                       Residential
     Vegetation (Building Envelope)              Grassed/Scattered small to large sized
                                                             mature trees
     Vegetation (Allotment)                      Grassed/Scattered small to large sized
                                                             mature trees
     Road Status                                                Sealed
     Slope                                                7-9% to the Rear
     Surface Water will Drain Towards                            Rear
     Will Surface water from adjoining                           May
     allotments traverse this site
     Does the site have any watercourses                              No
     Surrounding Allotments
                                   Left                      Existing Residence
                                   Right                     Existing Residence
                                   Rear                      Existing Residence
     Depth to Weathered Rock                                         N/a
     Depth to Water Table                                            N/a

3.   SITE CLASSIFICATION AND TARGET STRATA
     Based on the findings of the site investigation, the classification of the site is considered to
     conform to:-

       CLASS “ P ” (Due to poor bearing capacity, the presence of trees and
           the removal of an existing residence - Piering Required)
     (PLEASE NOTE: If not for the poor bearing capacity and trees encountered and the removal of an
               existing residence, this site would have the characteristics of an 'S' site)
     in accordance with Australian Standard 2870 - 2011, 'Residential Slabs and Footings,
     Construction'.

                                                  15/1054 Page 1

Page 15

       The target stratum for the foundation of the structure at location BH1 is the SAND at a
       depth of 800mm below existing ground level.
       The target stratum for the foundation of the structure at location BH2 is the SAND at a
       depth of 1300mm below existing ground level.

       It is the designing engineers responsibility to address the potential influence of any trees
       present on or around the proposed building site.

       If any fill is placed over the existing ground, the structure shall be piered through the fill
       into the existing material. Further note that the placement of reactive material as fill, or cutting
       of the site may change the site’s classification.

4.     SOIL PROFILE

       Refer to Soil Profile Report for borelog information

       Whilst every effort has been made to ensure that the borelogs carried out at the subject
       allotment are indicative of the soil profile over the site any discrepancy between the profile
       detailed in the borelogs and that observed during construction shall be referred to Global
       Testing for immediate attention.


5.     MATERIALS LABORATORY TEST RESULTS

       Soil Laboratory testing was not carried out on samples of the soil taken from the site because the clay
       content of the material was too low for Shrink-Swell movements to be critical in the classification of
       the soil profile. Determination of the classification for the site in this situation is based upon results
       from Dynamic Cone Penetrometer testing performed over the site.

                         BOREHOLE                                                 n/a
                         DEPTH RANGE OF SAMPLE                                    n/a
                         LIQUID LIMIT                                             n/a
                         PLASTIC LIMIT                                            n/a
                         PLASTIC INDEX                                            n/a
                         LINEAR SHRINKAGE                                         n/a
                         INSTABILITY INDEX                                        n/a
                         SHRINK SWELL INDEX,Iss                                   n/a
                         PREDICTED SURFACE MOVEMENT                               n/a

      Please note that the Plasticity Index (PI) determined by the Atterberg Test may be correlated to an
      Instability Index (Ips)with reference to the results of extensive testing carried out by others, notably,
      Dr P Mitchell, ‘Footings for Small Scale Domestic Structures, ’March 1990.

     Yours Sincerely,




     MICHAEL PINKNEY. (Laboratory Manager)




                                                 15/1054 Page 2

Page 16

                                          LIMITATIONS
Recommendations given in this report are based on the information supplied by the client regarding the
proposed building construction in conjunction with the findings of the investigation. Any change in
construction type, building location or omission in the client supplied information, may require additional
testing and/or make the recommendations invalid.

The recommendations herein identify a target soil stratum into which the footings are to be founded. The
target stratum has been located by the depth in mm of the target stratum's upper horizon boundary below
the existing ground surface level at the time of the site investigation. Any cutting or filling works and any
surface erosion or deposits subsequent to the site investigation, will alter the measured location of the
stratum relative to the surface. Where required, the author should be notified in such cases to confirm the
location of the target stratum.

The description of the soil given in the Soil Profile section of this report is intended as a brief overview of
the soil's primary constituents. For a detailed classification of the soil, the reader should refer to the Soil
Profile Reports and/or Borehole Reports attached to this report.

Every reasonable effort has been made to locate the test sites so that the borehole profiles are
representative of the soil conditions within the area investigated. The client should be made aware
however, that exploration is limited by time available and economic restraints. In some cases soil
conditions can change dramatically over short distances, therefore, even careful exploration programs may
not locate all the variations.

If soil conditions different from those shown in this report are encountered or are inferred from other
sources, then the author must be notified immediately.

This report may not be reproduced except in full. The information and drawings provided with this report
shall only be used and will only be applicable for the development shown on the client supplied
information provided for this site.

Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan shall not be
used for any building construction or costing calculations. The purpose of the plan is to show approximate
location of field tests only.

Any changes made to these recommendations by persons unauthorised by the author will legally be
interpreted as that person assuming the responsibility for the long-term performance of the footing system.

The recommendations contained in this report have not taken into consideration the long term effects of
any previous, current or potential subsurface work by mining companies or potential slope instability
problems. At the time of writing this report neither our client (nor his agent) nor the local authority had
made the author aware that these problems may be affecting this allotment. If a mining subsidence or
slope stability assessment is required for this allotment, the recommendations of a suitably qualified
geotechnical engineer should be sought.




                                                  15/1054 Page 3

Page 17

            THE ONLY NAME IN SOILS


SOIL PROFILE REPORT
CLIENT:     Zigannaire Pty Ltd           AUTHORIZED                Deb Macnaught
                                         BY:
PROJECT:    61 Elanda Street,            DATE TESTED:              20/10/2015
            Sunshine Beach               JOB NO:                   15/1054


             Drilling Method: Jacro 105 100mm.                               Borehole
                                                                              No: 1
           Description                                       PENET.         Est. Bearing
 Depth                                                  (blows per 100mm)
 (mm)                                                                        Capacity
                                                         1     2   3    4
                                                                               (kPa)
   0       SAND (SP) - Fine to medium grained,
           brown, moist, loose.
  100                                                    2                      50
  200                                                    2
  300                                                    2
  400                                                    2                      50
  500                                                    2
  600                                                    2
  700                                                    2                      50
  800      SAND (SP) - Fine to medium grained, grey,                            100
                                                         3
           moist, medium-dense.
   900                                                   3
  1000                                                   3
  1100                                                   3                      100
  1200                                                   3
  1300                                                   3
  1400                                                   4                      125
  1500                                                   4
  1600
  1700
  1800
  1900
  2000     Hole Terminated.
  2100
  2200
  2300
  2400
  2500
                                       15/1054 Page 4

Page 18

           THE ONLY NAME IN SOILS

SOIL PROFILE REPORT
CLIENT:     Zigannaire Pty Ltd           AUTHORIZED               Deb Macnaught
                                         BY:
PROJECT:    61 Elanda Street,            DATE TESTED:             20/10/2015
            Sunshine Beach               JOB NO:                  15/1054


           Drilling Method: Hand Auger 100mm.                                Borehole
                                                                              No: 2
           Description                                       PENET.         Est. Bearing
 Depth                                                  (blows per 100mm)
 (mm)                                                                        Capacity
                                                        1    2     3    4
                                                                               (kPa)
   0       SAND (SP) - Fine to medium grained, grey,
           moist, loose.
   100                                                      0.3                 10
   200                                                      0.3
   300                                                      0.3
   400                                                       1                  30
   500                                                       1
   600                                                       2
   700                                                       1                  30
   800                                                       2
   900                                                       1
  1000     SAND (SP) - Fine to medium grained, pale                             30
                                                             1
           grey, moist, loose.
  1100                                                       2
  1200                                                       2
  1300     SAND (SP) - Fine to medium grained, pale                             100
                                                             3
           grey, moist, medium-dense.
  1400                                                       3
  1500     Hole Terminated.                                  3                  100
  1600
  1700
  1800
  1900
  2000
  2100
  2200
  2300
  2400
  2500
                                       15/1054 Page 5

Page 19

THE ONLY NAME IN SOILS




   Site – 61 Elanda Street, Sunshine Beach
                  15/1054 Page 6


[OCR of page images]
GLOBAL TESTING

 

THE ONLY NAME IN SOILS

 

Site — 61 Elanda Street, Sunshine Beach

15/1054 Page 6

Page 20

                   The only name in soils


                           Test Locality Plan
                                                           LEGEND

 n                                                            BH - Borehole Location
                                                              PN - Dynamic Cone Penetrometer Location
                                                              PT - Percolation Test
                                                                  -Trees
                                     4m high                                                                 7m high
                                      tree                                                                    tree
                                               2m high                   8m high
                              5m high           tree                      tree
                               tree


                                         8m high                  9%
                                          tree                   slope
                             3m high
                              tree
                                                             8m high
 3m high                                                      tree
  trees
                                                                                BH2                          3m high
                                                                                PN2                           trees
                                    8m high
                                     tree                                                 1m high
                                                                       3.5m                tree
                                                      1m high
                                                       tree
                                                                                2m
    2m high
     tree

                                                Existing Residence
                                                 (to be removed)


                                                        5-6m high palms
                                                                              3m


                                                                            3.5m
                            1m high bushes
                                                             1m high        BH1
                                                              bushes        PN1
                                                      7%
                                                     slope
   8m high                                                                                                          7m high
    tree                                                                                                             tree


                                                                                                                 Not to Scale
Note: Any dimensions, contours, slope directions and magnitudes shown on the plan shall not be used for any building
construction or costing calculations. The purpose of the plan is to show the approximate location of the field tests only. All
dimensions in metres UNO .



Zigannaire Pty Ltd                                                                                                      Job No. 15/1054
61 Elanda Street,                                                                                              Date Tested : 20/10/2015
Sunshine Beach                                                                                              Authorised:- Deb Macnaught

Page 21

ATTACHMENT 3: Trench Sizing Calculations




                                           m: 0439 119 890 t: +7 5414 7185
                                           e: [email protected]
                                           w: www.aquaintel.com.au

Page 22

                                                                                                                                                                    suitability for recharge is required and must be approved by the local authority.

                                                                                                                                                          7.2.7.2   Groundwater Table

                                                                                                                                                                    A second groundwater related design consideration is to ensure that the base of an infiltration system is
                                                                                                                                                                    always above the groundwater table. It is generally recommended that the base of the infiltration system
                                                                                                                                                                    be a minimum of 1.0 m above the seasonal high water table.

                                                                                                                                                                    If a shallow groundwater table is likely to be encountered, investigation of the seasonal variation of
                                                                                                                                                                    groundwater levels is essential. This should include an assessment of potential groundwater mounding
                                                                                                                                                                    (i.e. localised raising of the water table in the immediate vicinity of the infiltration system) that in shallow
                                                                                                                                                                    groundwater areas could cause problems with nearby structures.

                                                                                                                                                          7.2.8     Building Setbacks (Clearances)
                                                                                                                                                                    Infiltration systems should not be placed near building footings to avoid the influence of continually wet
                                                                                                      Chapter
                                                                                                   Chapter      7 – Infiltration
                                                                                                           7 – Infiltration      Measures
                                                                                                                            Measures                                sub-surface or greatly varying soil moisture content on the structural integrity. Australian Runoff Quality
  Calculation of Infiltration Area                                                                                                   INPUT                                           Project
                                                                                                                                                                    (Engineers Australia      Number:
                                                                                                                                                                                          2006)          2014019
                                                                                                                                                                                                recommends     minimum distances from structures and property boundaries (to
  Methodology following WSUD Guidelines for SEQ                                                                                      calculated                     protect possible   future buildings
                                                                                                                                                                                     Project:           in neighbouring
                                                                                                                                                                                              Elanda Street              properties) for different soil types. These values are
                                                                                                                                                                                                               Infiltration
                                                                                                                                                                    shown in Table 7-5.
                                                                                                                                     Goal Seek to Zero
   Permeability
    7.3.6.2Design
7.3.6.2       DesignEstimates
                     Storm
                  Storm        provided by Geotechnical Investigations
                           Approach
                        Approach
                                                                              m/s                         mm/s              mm/hr                                                    Table 7-5: Minimum Setback Distances (adapted from Engineers Australia 2006)
           Where     the design    objective
                                          for afor a particular  infiltration system   is peak  discharge attenuation  orcapture
                                                                                                                          the capture
  UpperWhere
        Limit  the  design
                 Permeability objective         particular infiltration  system   is peak  discharge
                                                                                            1.00E-01  attenuation or the
                                                                                                              1.00E+02             360000                                                                Saturated Hydraulic Conductivity                                          Minimum distance from structures
       and and   infiltration
           infiltration   of a ofparticular
                                   a particular  design
                                            design   stormstorm
                                                             event,event,
                                                                       thenthen  the design
                                                                             the design   stormstorm  approach
                                                                                                  approach may may    be adopted
                                                                                                                 be adopted   for for                                           Soil Type
  Lower Limit                                                                                                                                                                                                        (mm/hr)                                                           and property boundaries
           sizing the infiltration system. Use of the design storm approach must be approved by the local authority 9216
                 Permeability                                                               2.56E-03          2.56E+00
          sizing the infiltration system. Use of the design storm approach must be approved by the local authority                                                   Sands                                            >180                                                                      1.0 m
               for sizing
          for sizing        infiltration
                      infiltration       systems.
                                    systems.                                                                                                                         Sandy Loam                                     36 to 180                                                                   2.0 m
             Design
          Design     Storm
                 Storm           (Qdes(Q
                           Selection
                       Selection       ) des)                                                                                                                        Sandy Clay                                     3.6 to 36                                                                   4.0 m
                                                                                                                                                                     Medium to Heavy Clay                           0.0 to 3.6                                                                  5.0 m
        The The
              first first
                     stepstep  in design
                          in the   the design    storm
                                             storm     approach
                                                   approach        to sizing
                                                              to sizing      the infiltration
                                                                        the infiltration      system
                                                                                         system        is selecting
                                                                                                  is selecting      the design
                                                                                                               the design  storm storm
             for capture
        for capture     and and   infiltration.
                            infiltration.  ThisThis
                                                 mustmust
                                                      occuroccur  in consultation
                                                             in consultation  withwith   the local
                                                                                    the local      authority
                                                                                              authority      and generally
                                                                                                         and will will generally
                                                                                                                           relaterelate
  Designto Event
           3 to
              month    Method
                 3 monthARI ARI
                            and and
                                  1 year1 year
                                           ARI ARI  design
                                                design      storms.
                                                       storms.                                                                                                                                                            Hydrologic Effectiveness Method
                                                                                                                                                          7.2.9     Flow Management
  Vin (Rational   Method
           Detention
        Detention     VolumeQ100 x tc)
                  Volume
                                                                                                   11.44942 m3
                                                                                                                                                                                                                Adopted
                                                                                                                                                                    The following issues should be considered when         Hydrological
                                                                                                                                                                                                                   designing              Effectiveness
                                                                                                                                                                                                                             the flow control             = 100%
                                                                                                                                                                                                                                              structures within       (i.e 100% of the mean annual runoff is inflitrated)
                                                                                                                                                                                                                                                                infiltration
       The The  required
            required        ‘detention
                       ‘detention        volume’
                                    volume’   of anof infiltration
                                                       an infiltration   system
                                                                    system       is defined
                                                                             is defined     by difference
                                                                                        by the the difference  in inflow
                                                                                                          in inflow  and and                                        systems:
  Q100 outflow
       Volume
           outflowfrom      WBNM
                    (or infiltrated)
               (or infiltrated)      volumes
                                volumes        for duration
                                          for the  the duration
                                                              of a of a storm.
                                                                   storm.
                                                                                              11 m3                                                                                                                       From Figure 7-7
  Porosity of fill in trench (0.35 for gravel, 1.0 empty,0.95 for Atlantis
          The The  inflow
              inflow   volume   (V ) is(Vdetermined,
                            volume       ) is determined,
                                                                       0.95Flo-Trench)
                                                            in accordance
                                                       in accordance   withwith Section
                                                                            Section     6 (Detention
                                                                                    6 (Detention     Basins)
                                                                                                 Basins)     of QUDM,
                                                                                                         of QUDM,      as the
                                                                                                                  as the
                                                                                                                                                                    ƒ For large scale systems (i.e. infiltration basins),
                                                                                                                                                                                                                     % Catchment      Area
                                                                                                                                                                                                                          the surface of     Required area’
                                                                                                                                                                                                                                         the ‘infiltration = must be flat or as                                                                                          1.50%
                                           i   i                                                                                                                       close to this as possible to ensure uniform distribution of flow and to prevent hydraulic overloading on
              product
          product       of design
                   of the  the design
                                   storm  storm
                                             flowflow
                                                  and and  the storm
                                                      the storm       duration:
                                                                  duration:                                                                                            a small portion of the ‘infiltration area’.
  W=                                                                                     0.80 m                  2x Double Flo-Tanks (side by side)                                             Catchment                                           Area (ha)                                                                           Infiltration Volume (m3)
  L=                                                                                     8.03 m                  calculated from Ainf         ƒ For gravel filled infiltration systems, flow should
                                                                                                                                                                                                Yard
                                                                                                                                                                                                      be delivered to the ‘detention volume’ via a perforated
                                                                                                                                                                                                                                                      0.025                                                                                         3.75
                  D ˜D
      Vi VQi desQ˜des                                                                                    Equation
                                                                                                     Equation 7.1 7.1                            pipe(s) network that is located and sized to convey the design flow into the infiltration systems and
  d=                                                                                      0.9 m                  Double Flo-Tank                                                                Lot (lessarea.
                                                                                                                                                 allow distribution of flows across the entire infiltration  to street)                              0.0416                                                                                         6.24 7 – Infiltration Measures
                                                                                                                                                                                                                                                                                                                                                   Chapter

  P=                                                                                     17.7 m                  calculated from dimensions
         Where        Vi Vi = inflow
                                   = inflow  volume    (for storm       D) (mD3)) (m3)
                                                                    duration
                                                                                                                                              ƒ  Where possible, ‘above design’ flows will bypass the infiltration systems. This can be achieved in a
  U = Where                             volume    (for storm   duration                   0.5                    from Table 7-6                  number of ways. For smaller applications, an overflow pipe or pit, which is connected to the
                      QdesQdes = design                                                                                                          downstream drainage system, can be used. For larger applications, a discharge control pit can be
  D=                               = design  storm
                                         storm  flowflow    for sizing
                                                       for sizing      as outlined
                                                                  as outlined       in Section
                                                                               in Section    5 7.3.5
                                                                                          7.3.5 mins              0.08333333 hr
                                                                                                                                                                       located upstream of the infiltration system. This will function much like the inlet zone of a constructed
                                                       (Rational
                                                   (Rational       , Q=, CIA/360
                                                                 Method
                                                             Method      Q= CIA/360  (m3/s)
                                                                                 (m3/s)                                                                                wetland to regulate flows (1 year ARI) into the infiltration systems and bypass above design flows (> 1
                                                                                                                                                                                                                                              Infiltration Hydrologic Effectiveness (Depth = 1m, Porosity = 1.0) - Nambour
  Vo =                  D D = storm          duration
                                       = storm           (hrs (hrs
                                                   duration    x 3600  s/hr)s/hr)
                                                                    x 3600                        5.52                       from Eqn 7.2                              year ARI).
  Substituting  Eqnin 7.2
       As outlined
           As outlined   in into
                       Section    Eqn
                            Section     7.3
                                 7.3.5.2,  if the
                                     7.3.5.2,       infiltration
                                                 if the            system
                                                          infiltration      is toisform
                                                                       system              part part
                                                                                      to form    of a ofdetention basinbasin
                                                                                                          a detention   or if ortheif the                                                                                                                             100

  Vd = catchment  areaarea
           catchment    to the
                             to system   is large
                                the system          (> 50(>ha)
                                               is large       50 then  a fulla flood
                                                                  ha) then             routing
                                                                                full flood        5.77
                                                                                               computation
                                                                                            routing computationmethod  should
                                                                                                                   method    Atlantis
                                                                                                                                 be be Flo-Tank (double) =
                                                                                                                            should                                             25
                                                                                                                                                                       WSUD Technical Design Guidelines for South East Queensland90
                                                                                                                                                                                                                                  – Version 1 June 2006                                                                  7-8
          usedused
               to estimate design
                   to estimate    flows.
                               design flows.
                                                                                                                                                                                                                                                                       80
  Ainf =Outflow from
           Outflow    the Goal
                  Solve
                    from  infiltration
                                  Seek system
                                         for
                          the infiltration     is viais the
                                             Area
                                           system        via base and and
                                                             the base sidessides
                                                                             of the
                                                                                  of infiltration
                                                                                             6.42media
                                                                                                     m2
                                                                                      the infiltration  and is
                                                                                                       media   dependent
                                                                                                             and     Atlantis Flo-Tank (double) =
                                                                                                                 is dependent                                                  23
        on the   areaarea
             on the    and and
                            depth of the
                                depth       structure.
                                        of the          In computing
                                                 structure.            the infiltration
                                                            In computing                  fromfrom
                                                                           the infiltration      the walls    of anofinfiltration
                                                                                                       the walls      an infiltration




                                                                                                                                                                                                                                       Hydrologic Effectiveness (%)
                                                                                                                                                                                                                                                                       70
        system,    Australian
             system,          Runoff
                       Australian     Quality
                                  Runoff        (Engineers
                                           Quality           Australia
                                                     (Engineers        2006)
                                                                 Australia   suggests
                                                                           2006)   suggeststhat that
                                                                                                 pressure    is hydrostatically
                                                                                                       pressure   is hydrostatically
  Goal Seek
        distributed  and and
             distributed thusthus
                               equalequal
                                     to half the depth
                                          to half        of water
                                                  the depth       overover
                                                             of water  the bed   of the
                                                                           the bed        the 0.00
                                                                                      of infiltration  system:
                                                                                               infiltration system:                                   ADOPT                    25                                                                                      60


                                                                                                                                                                                                                                                                       50
                  ª ª § d ·º dUº˜ KU ˜ K˜ D ˜ D
                                                                                                               2.73 modules/m3
             Vo Vo«A inf«Ainf¨ P˜ §¨ P¸»˜ ˜ ·¸» ˜ sat sat                                                        Equation
                                                                                                                      15.76 7.2 7.2
                                                                                                                       Equation                                                                                                                                        40
                  ¬ ¬ © ©2 ¹¼ 2 ¹¼10001000                                                                                                                                                                                                                                                                                                                3.6mm/hr hydraulic conductivity
                                                                                                      Chapter 7 – Infiltration Measures                                                                                                                                                                                                                   10mm/hr hydraulic conductivity
                                                                                                                                                                                                                                                                       30
                                                                                                                                                                                                                                                                                                                                                          36mm/hr hydraulic conductivity
                                                                                                                                                                                                                                                                                                                                                          100mm/hr hydraulic conductivity
          Where Vo Vo
            Where                 = outflow volume
                                      = outflow     (for storm
                                                volume          duration
                                                         (for storm      D) (mD)3) (m3)
                                                                    duration                                                                                                                                                                                           20                                                                                 360mm/hr hydraulic conductivity
                                                                                                                                                                                                                                                                                                                                                          1800mm/hr hydraulic conductivity
                       Ksat Ksat = saturated hydraulic
                                     = saturated       conductivity
                                                 hydraulic          (mm/hr)
                                                           conductivity     as provided
                                                                        (mm/hr)         in Step
                                                                                as provided      1. 1.
                                                                                             in Step                                                                                                                                                                                                                                                      3600mm/hr hydraulic conductivity
                                                                                                                                                                                                                                                                       10
                                                            2
                       Ainf Ainf = infiltration areaarea
                                     = infiltration  (m ) (m )   2

                                                                                                                                                                                                                                                                        0
                       P
                      P = perimeter         length
                                  = perimeter        of the
                                                  length  of infiltration    area area
                                                              the infiltration      (m) (m)                                                                                                                                                                                 0             0.5                 1                  1.5                   2                        2.5                  3
       Where              Vd           = required detention volume (m3)
                                                                                                                                                                                                                                                                                                     Size of 'Infiltration Area' (as a % of Total Catchment Area)
                 d d = depth           of the
                                            of infiltration  system      (m) (m)
                          Vi = depth            the infiltration
                                       = inflow volume (m3)
                                                                    system
                 U U = soil          hydraulic conductivity       moderating       factor (see Table 7.5)
                          Vo = soil= hydraulic        conductivity
                                          outflow volume          (m3)moderating factor (see Table 7.5)
                                                                                                                                                                                                                              Figure 7-7: Hydrologic Effectiveness of ‘Detention Storage’ for Infiltration Systems for the North Coast (Depth = 1 m and Porosity = 1.0)
                 D D = storm           duration
                                  = storm          (hrs)(hrs)
                                             duration
                          p            = porosity     (void = 1, gravel = 0.35)
         Thus,  the required    detention   volume     (Vd) of  an   infiltration   system   can be Chapter 7 as
                                                                                                               – Infiltration Measures
              Thus, the  required    detention    volume
       Computation of the required storage will need        (V d ) of  an  infiltration
                                                                         to be carried  system   cancomputed
                                                                                            out for  be computed
                                                                                                    the
                                                                                                                  follows:
                                                                                                        full range as
                                                                                                                    of follows:
                                                                                                                        probabilistic storm                                                                                                                                         Infiltration Hydrologic Effectiveness (Depth = 1m, Porosity = 0.35) - Nambour
       durations, ranging from 6 minutes to 72 hours. The critical storm event is that which results in the
       highest required storage. A spreadsheet application (using equations 7.1 to 7.3) is the most convenient                                                                                                                                                        100
                Vi VVo V
       wayVdofVdoing  ithis. oIt is important to note that some storm events result in double peaks                  Equation
                                                                                                                         in the7.3
                                                                                                                                hyetograph
                                                                                                                          Equation 7.3
                d p
                        p storm and these may affect the size of detention storage required.
       for the particular
                                                                                                                                                                                                                                                                       90


       Soil Hydraulic Conductivity Moderating Factor                                                                                                                                                                                                                   80
                Where              Vd          = required detention volume (m3)
       Soil is inherently non-homogeneous and field tests can often misrepresent the areal hydraulic
                                                                                                                                                                                                                                  Hydrologic Effectiveness (%)




                                                                                                                                                                                                                                                                       70
                                                                       3
              WSUD
       conductivity    Technical
                    WSUD           Vinto
                            a soilDesign
                         of Technical          =Guidelines
                                           which
                                     i Design    inflow
                                           Guidelines  forvolume
                                                           South
                                                   stormwater       (m
                                                                  East
                                                             for South   ) be
                                                                     isQueensland
                                                                        to
                                                                       East          – Version
                                                                                 infiltrated.
                                                                              Queensland       1Field
                                                                                                  June
                                                                                           – Version   2006 2006
                                                                                                     1 experience
                                                                                                       June          suggests that field 7-16
                                                                                                                                             tests
                                                                                                                                              7-16
       of ‘point’ soil hydraulic   Vo   conductivity
                                               = outflow(asvolume
                                                               defined(m3)by Step 1) can often under estimate the areal hydraulic
                                                                                                                                                                                                                                                                       60

       conductivity of clay soils and over estimate in sandy soils. As a result, Australian Runoff Quality
       (Engineers Australia 2005)  p           = porosity (void
                                             recommends            = 1,moderation
                                                                 that     gravel = 0.35)factors for hydraulic conductivities determined                                                                                                                                50

       from field test be applied as shown in Table 7-6.
                Computation of the required storage will need to be carried out for the full range of probabilistic storm                                                                                                                                              40
           Tabledurations,   rangingFactors
                  7-6: Moderation      from to 6 Convert
                                                 minutes Pointto 72tohours.     The critical storm
                                                                       Areal Conductivities            event is that
                                                                                                (after Engineers      which2005)
                                                                                                                   Australia   results in the
                                                                                                                                                                                                                                                                                                                                                                3.6mm/hr hydraulic conductivity
                highest required storage. A spreadsheet application (using equations 7.1 to 7.3) is the most convenient                                                                                                                                                30
                                                                                   Moderation Factor (U)                                                                                                                                                                                                                                                        10mm/hr hydraulic conductivity
                way of doing this.    It is important to note that some storm events result in double peaks in the hyetograph
                                 Soil Type                                                                                                                                                                                                                                                                                                                      36mm/hr hydraulic conductivity
                                                                          (to convert “point” Ksat to areal Ksat)                                                                                                                                                      20
                for the particular storm and these may affect the size of detention storage required.                                                                                                                                                                                                                                                           100mm/hr hydraulic conductivity
                  Sandy soil                                                                    0.5                                                                                                                                                                                                                                                             360mm/hr hydraulic conductivity
                  Sandy
                Soil      clay Conductivity Moderating Factor
                      Hydraulic                                                                 1.0                                                                                                                                                                    10                                                                                       1800mm/hr hydraulic conductivity
                                                                                                                                                                                                                                                                                                                                                                3600mm/hr hydraulic conductivity
                  Medium and Heavy Clay                                                         2.0
                Soil is inherently non-homogeneous and field tests can often misrepresent the areal hydraulic                                                                                                                                                           0
       Emptying       Time of a soil into which stormwater is to be infiltrated. Field experience suggests that field tests
                conductivity                                                                                                                                                                                                                                                0             0.5                1                   1.5                  2                         2.5                  3
                                                                                                                                                                                                                                                                                                     Size of 'Infiltration Area' (as a % of Total Catchment Area)
       Emptying time is defined as the time taken to fully empty aoften
                of  ‘point’ soil hydraulic    conductivity    (as defined     by Step   1) can          under estimate
                                                                                                    detention    volumethe    areal hydraulic
                                                                                                                           associated    with an
                conductivity
       infiltration    systemoffollowing
                                    clay soilstheandcessation
                                                        over estimate        in sandy
                                                                    of rainfall.   Thissoils.
                                                                                           is anAsimportant      Australian
                                                                                                      a result, design       Runoff Quality
                                                                                                                          consideration    as the
                (Engineers
       computation            Australia associated
                          procedure       2005) recommends         that moderation
                                                         with Equation                   factors that
                                                                               7.3 assumes         for hydraulic  conductivities
                                                                                                         the storage    is empty determined
                                                                                                                                     prior to the                                                                              Figure 7-8: Hydrologic Effectiveness of ‘Detention Storage’ for Infiltration Systems the North Coast (Depth = 1 m and Porosity = 0.35)
                from field testofbethe
       commencement                  applied   as shown
                                           design     storm in Table
                                                                 event.7-6.Australian Runoff Quality (Engineers Australia 2006)
       suggestsTable
                  an 7-6:
                     emptying     time
                          Moderation     of the
                                     Factors     detention
                                             to Convert       storage
                                                        Point to         of infiltration
                                                                 Areal Conductivities (aftersystems
                                                                                             Engineers to vary 2005)
                                                                                                       Australia from 12 hours to 84
       hours. For detention basins (surface systems) the emptying time must be limited to 72 hours to reduce
       the risk of mosquito breeding.                                     Moderation Factor (U)
                                  Soil Type
                                                                   (to convert “point” Ksat to areal Ksat)
       Emptying time     is computed
                     Sandy   soil        simply as the ratio of the volume of         0.5water in temporary storage (dimension
       of storage x porosity)
                     Sandy clayto the infiltration rate (hydraulic conductivity1.0x infiltration area):
                             Medium and Heavy Clay                                           2.0

                 Emptying
                1000  ˜ Vd Time
                            ˜P ˜ p
        te                                                                                           Equation 7.4                                                                                                                                                       WSUD Technical Design Guidelines for South East Queensland – Version 1 June 2006                                           7-13
                  A inf ˜ K sat
                 Emptying   time is defined as the time taken to fully empty a detention volume associated with an
            infiltration system following the cessation of rainfall. This is an important design consideration as the
            computation procedure associated with Equation 7.3 assumes that the storage is empty prior to the
       Where             te       = emptying time (hours)
            commencement       of the design storm event. Australian Runoff Quality (Engineers Australia 2006)
                                                           3
            suggests anVdemptying = time of thevolume
                                     detention  detention
                                                        (mstorage
                                                             )      of infiltration systems to vary from 12 hours to 84
            hours. For detention basins (surface systems) the emptying time must be limited to 72 hours to reduce
                         P        = perimeter length of the infiltration area (m)
            the risk of mosquito breeding.
                             Ainf       = infiltration area (m2)
                 Emptying time    is computed simply as the ratio of the volume of water in temporary storage (dimension
                 of storage xKporosity)
                              sat       =tosaturated    hydraulic
                                            the infiltration        conductivity
                                                             rate (hydraulic      (mm/hr)
                                                                             conductivity    as provided
                                                                                          x infiltration     in Step 1
                                                                                                         area):
                                 p             = porosity (void = 1, gravel = 0.35)

                           1000 ˜ Vd ˜ P ˜ p
                  te                                                                                                    Equation 7.4
                             A inf ˜ K sat


                 Where                 te           = emptying time (hours)

                                       Vd           = detention volume (m3)
             WSUD Technical Design Guidelines for South East Queensland – Version 1 June 2006                                                  7-17
                                       P            = perimeter length of the infiltration area (m)

                                       Ainf         = infiltration area (m2)

                                       Ksat         = saturated hydraulic conductivity (mm/hr) as provided in Step 1

                                       p            = porosity (void = 1, gravel = 0.35)




                       WSUD Technical Design Guidelines for South East Queensland – Version 1 June 2006                                 7-17

Used in these records

About this file

File size
6.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Tod Consulting Stormwater Plans v2.pdf · 6.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.