suitability for recharge is required and must be approved by the local authority.
7.2.7.2 Groundwater Table
A second groundwater related design consideration is to ensure that the base of an infiltration system is
always above the groundwater table. It is generally recommended that the base of the infiltration system
be a minimum of 1.0 m above the seasonal high water table.
If a shallow groundwater table is likely to be encountered, investigation of the seasonal variation of
groundwater levels is essential. This should include an assessment of potential groundwater mounding
(i.e. localised raising of the water table in the immediate vicinity of the infiltration system) that in shallow
groundwater areas could cause problems with nearby structures.
7.2.8 Building Setbacks (Clearances)
Infiltration systems should not be placed near building footings to avoid the influence of continually wet
Chapter
Chapter 7 – Infiltration
7 – Infiltration Measures
Measures sub-surface or greatly varying soil moisture content on the structural integrity. Australian Runoff Quality
Calculation of Infiltration Area INPUT Project
(Engineers Australia Number:
2006) 2014019
recommends minimum distances from structures and property boundaries (to
Methodology following WSUD Guidelines for SEQ calculated protect possible future buildings
Project: in neighbouring
Elanda Street properties) for different soil types. These values are
Infiltration
shown in Table 7-5.
Goal Seek to Zero
Permeability
7.3.6.2Design
7.3.6.2 DesignEstimates
Storm
Storm provided by Geotechnical Investigations
Approach
Approach
m/s mm/s mm/hr Table 7-5: Minimum Setback Distances (adapted from Engineers Australia 2006)
Where the design objective
for afor a particular infiltration system is peak discharge attenuation orcapture
the capture
UpperWhere
Limit the design
Permeability objective particular infiltration system is peak discharge
1.00E-01 attenuation or the
1.00E+02 360000 Saturated Hydraulic Conductivity Minimum distance from structures
and and infiltration
infiltration of a ofparticular
a particular design
design stormstorm
event,event,
thenthen the design
the design stormstorm approach
approach may may be adopted
be adopted for for Soil Type
Lower Limit (mm/hr) and property boundaries
sizing the infiltration system. Use of the design storm approach must be approved by the local authority 9216
Permeability 2.56E-03 2.56E+00
sizing the infiltration system. Use of the design storm approach must be approved by the local authority Sands >180 1.0 m
for sizing
for sizing infiltration
infiltration systems.
systems. Sandy Loam 36 to 180 2.0 m
Design
Design Storm
Storm (Qdes(Q
Selection
Selection ) des) Sandy Clay 3.6 to 36 4.0 m
Medium to Heavy Clay 0.0 to 3.6 5.0 m
The The
first first
stepstep in design
in the the design storm
storm approach
approach to sizing
to sizing the infiltration
the infiltration system
system is selecting
is selecting the design
the design storm storm
for capture
for capture and and infiltration.
infiltration. ThisThis
mustmust
occuroccur in consultation
in consultation withwith the local
the local authority
authority and generally
and will will generally
relaterelate
Designto Event
3 to
month Method
3 monthARI ARI
and and
1 year1 year
ARI ARI design
design storms.
storms. Hydrologic Effectiveness Method
7.2.9 Flow Management
Vin (Rational Method
Detention
Detention VolumeQ100 x tc)
Volume
11.44942 m3
Adopted
The following issues should be considered when Hydrological
designing Effectiveness
the flow control = 100%
structures within (i.e 100% of the mean annual runoff is inflitrated)
infiltration
The The required
required ‘detention
‘detention volume’
volume’ of anof infiltration
an infiltration system
system is defined
is defined by difference
by the the difference in inflow
in inflow and and systems:
Q100 outflow
Volume
outflowfrom WBNM
(or infiltrated)
(or infiltrated) volumes
volumes for duration
for the the duration
of a of a storm.
storm.
11 m3 From Figure 7-7
Porosity of fill in trench (0.35 for gravel, 1.0 empty,0.95 for Atlantis
The The inflow
inflow volume (V ) is(Vdetermined,
volume ) is determined,
0.95Flo-Trench)
in accordance
in accordance withwith Section
Section 6 (Detention
6 (Detention Basins)
Basins) of QUDM,
of QUDM, as the
as the
For large scale systems (i.e. infiltration basins),
% Catchment Area
the surface of Required area’
the ‘infiltration = must be flat or as 1.50%
i i close to this as possible to ensure uniform distribution of flow and to prevent hydraulic overloading on
product
product of design
of the the design
storm storm
flowflow
and and the storm
the storm duration:
duration: a small portion of the ‘infiltration area’.
W= 0.80 m 2x Double Flo-Tanks (side by side) Catchment Area (ha) Infiltration Volume (m3)
L= 8.03 m calculated from Ainf For gravel filled infiltration systems, flow should
Yard
be delivered to the ‘detention volume’ via a perforated
0.025 3.75
D D
Vi VQi desQdes Equation
Equation 7.1 7.1 pipe(s) network that is located and sized to convey the design flow into the infiltration systems and
d= 0.9 m Double Flo-Tank Lot (lessarea.
allow distribution of flows across the entire infiltration to street) 0.0416 6.24 7 – Infiltration Measures
Chapter
P= 17.7 m calculated from dimensions
Where Vi Vi = inflow
= inflow volume (for storm D) (mD3)) (m3)
duration
Where possible, ‘above design’ flows will bypass the infiltration systems. This can be achieved in a
U = Where volume (for storm duration 0.5 from Table 7-6 number of ways. For smaller applications, an overflow pipe or pit, which is connected to the
QdesQdes = design downstream drainage system, can be used. For larger applications, a discharge control pit can be
D= = design storm
storm flowflow for sizing
for sizing as outlined
as outlined in Section
in Section 5 7.3.5
7.3.5 mins 0.08333333 hr
located upstream of the infiltration system. This will function much like the inlet zone of a constructed
(Rational
(Rational , Q=, CIA/360
Method
Method Q= CIA/360 (m3/s)
(m3/s) wetland to regulate flows (1 year ARI) into the infiltration systems and bypass above design flows (> 1
Infiltration Hydrologic Effectiveness (Depth = 1m, Porosity = 1.0) - Nambour
Vo = D D = storm duration
= storm (hrs (hrs
duration x 3600 s/hr)s/hr)
x 3600 5.52 from Eqn 7.2 year ARI).
Substituting Eqnin 7.2
As outlined
As outlined in into
Section Eqn
Section 7.3
7.3.5.2, if the
7.3.5.2, infiltration
if the system
infiltration is toisform
system part part
to form of a ofdetention basinbasin
a detention or if ortheif the 100
Vd = catchment areaarea
catchment to the
to system is large
the system (> 50(>ha)
is large 50 then a fulla flood
ha) then routing
full flood 5.77
computation
routing computationmethod should
method Atlantis
be be Flo-Tank (double) =
should 25
WSUD Technical Design Guidelines for South East Queensland90
– Version 1 June 2006 7-8
usedused
to estimate design
to estimate flows.
design flows.
80
Ainf =Outflow from
Outflow the Goal
Solve
from infiltration
Seek system
for
the infiltration is viais the
Area
system via base and and
the base sidessides
of the
of infiltration
6.42media
m2
the infiltration and is
media dependent
and Atlantis Flo-Tank (double) =
is dependent 23
on the areaarea
on the and and
depth of the
depth structure.
of the In computing
structure. the infiltration
In computing fromfrom
the infiltration the walls of anofinfiltration
the walls an infiltration
Hydrologic Effectiveness (%)
70
system, Australian
system, Runoff
Australian Quality
Runoff (Engineers
Quality Australia
(Engineers 2006)
Australia suggests
2006) suggeststhat that
pressure is hydrostatically
pressure is hydrostatically
Goal Seek
distributed and and
distributed thusthus
equalequal
to half the depth
to half of water
the depth overover
of water the bed of the
the bed the 0.00
of infiltration system:
infiltration system: ADOPT 25 60
50
ª ª § d ·º dUº KU K D D
2.73 modules/m3
Vo Vo«A inf«Ainf¨ P §¨ P¸» ·¸» sat sat Equation
15.76 7.2 7.2
Equation 40
¬ ¬ © ©2 ¹¼ 2 ¹¼10001000 3.6mm/hr hydraulic conductivity
Chapter 7 – Infiltration Measures 10mm/hr hydraulic conductivity
30
36mm/hr hydraulic conductivity
100mm/hr hydraulic conductivity
Where Vo Vo
Where = outflow volume
= outflow (for storm
volume duration
(for storm D) (mD)3) (m3)
duration 20 360mm/hr hydraulic conductivity
1800mm/hr hydraulic conductivity
Ksat Ksat = saturated hydraulic
= saturated conductivity
hydraulic (mm/hr)
conductivity as provided
(mm/hr) in Step
as provided 1. 1.
in Step 3600mm/hr hydraulic conductivity
10
2
Ainf Ainf = infiltration areaarea
= infiltration (m ) (m ) 2
0
P
P = perimeter length
= perimeter of the
length of infiltration area area
the infiltration (m) (m) 0 0.5 1 1.5 2 2.5 3
Where Vd = required detention volume (m3)
Size of 'Infiltration Area' (as a % of Total Catchment Area)
d d = depth of the
of infiltration system (m) (m)
Vi = depth the infiltration
= inflow volume (m3)
system
U U = soil hydraulic conductivity moderating factor (see Table 7.5)
Vo = soil= hydraulic conductivity
outflow volume (m3)moderating factor (see Table 7.5)
Figure 7-7: Hydrologic Effectiveness of ‘Detention Storage’ for Infiltration Systems for the North Coast (Depth = 1 m and Porosity = 1.0)
D D = storm duration
= storm (hrs)(hrs)
duration
p = porosity (void = 1, gravel = 0.35)
Thus, the required detention volume (Vd) of an infiltration system can be Chapter 7 as
– Infiltration Measures
Thus, the required detention volume
Computation of the required storage will need (V d ) of an infiltration
to be carried system cancomputed
out for be computed
the
follows:
full range as
of follows:
probabilistic storm Infiltration Hydrologic Effectiveness (Depth = 1m, Porosity = 0.35) - Nambour
durations, ranging from 6 minutes to 72 hours. The critical storm event is that which results in the
highest required storage. A spreadsheet application (using equations 7.1 to 7.3) is the most convenient 100
Vi VVo V
wayVdofVdoing ithis. oIt is important to note that some storm events result in double peaks Equation
in the7.3
hyetograph
Equation 7.3
d p
p storm and these may affect the size of detention storage required.
for the particular
90
Soil Hydraulic Conductivity Moderating Factor 80
Where Vd = required detention volume (m3)
Soil is inherently non-homogeneous and field tests can often misrepresent the areal hydraulic
Hydrologic Effectiveness (%)
70
3
WSUD
conductivity Technical
WSUD Vinto
a soilDesign
of Technical =Guidelines
which
i Design inflow
Guidelines forvolume
South
stormwater (m
East
for South ) be
isQueensland
to
East – Version
infiltrated.
Queensland 1Field
June
– Version 2006 2006
1 experience
June suggests that field 7-16
tests
7-16
of ‘point’ soil hydraulic Vo conductivity
= outflow(asvolume
defined(m3)by Step 1) can often under estimate the areal hydraulic
60
conductivity of clay soils and over estimate in sandy soils. As a result, Australian Runoff Quality
(Engineers Australia 2005) p = porosity (void
recommends = 1,moderation
that gravel = 0.35)factors for hydraulic conductivities determined 50
from field test be applied as shown in Table 7-6.
Computation of the required storage will need to be carried out for the full range of probabilistic storm 40
Tabledurations, rangingFactors
7-6: Moderation from to 6 Convert
minutes Pointto 72tohours. The critical storm
Areal Conductivities event is that
(after Engineers which2005)
Australia results in the
3.6mm/hr hydraulic conductivity
highest required storage. A spreadsheet application (using equations 7.1 to 7.3) is the most convenient 30
Moderation Factor (U) 10mm/hr hydraulic conductivity
way of doing this. It is important to note that some storm events result in double peaks in the hyetograph
Soil Type 36mm/hr hydraulic conductivity
(to convert “point” Ksat to areal Ksat) 20
for the particular storm and these may affect the size of detention storage required. 100mm/hr hydraulic conductivity
Sandy soil 0.5 360mm/hr hydraulic conductivity
Sandy
Soil clay Conductivity Moderating Factor
Hydraulic 1.0 10 1800mm/hr hydraulic conductivity
3600mm/hr hydraulic conductivity
Medium and Heavy Clay 2.0
Soil is inherently non-homogeneous and field tests can often misrepresent the areal hydraulic 0
Emptying Time of a soil into which stormwater is to be infiltrated. Field experience suggests that field tests
conductivity 0 0.5 1 1.5 2 2.5 3
Size of 'Infiltration Area' (as a % of Total Catchment Area)
Emptying time is defined as the time taken to fully empty aoften
of ‘point’ soil hydraulic conductivity (as defined by Step 1) can under estimate
detention volumethe areal hydraulic
associated with an
conductivity
infiltration systemoffollowing
clay soilstheandcessation
over estimate in sandy
of rainfall. Thissoils.
is anAsimportant Australian
a result, design Runoff Quality
consideration as the
(Engineers
computation Australia associated
procedure 2005) recommends that moderation
with Equation factors that
7.3 assumes for hydraulic conductivities
the storage is empty determined
prior to the Figure 7-8: Hydrologic Effectiveness of ‘Detention Storage’ for Infiltration Systems the North Coast (Depth = 1 m and Porosity = 0.35)
from field testofbethe
commencement applied as shown
design storm in Table
event.7-6.Australian Runoff Quality (Engineers Australia 2006)
suggestsTable
an 7-6:
emptying time
Moderation of the
Factors detention
to Convert storage
Point to of infiltration
Areal Conductivities (aftersystems
Engineers to vary 2005)
Australia from 12 hours to 84
hours. For detention basins (surface systems) the emptying time must be limited to 72 hours to reduce
the risk of mosquito breeding. Moderation Factor (U)
Soil Type
(to convert “point” Ksat to areal Ksat)
Emptying time is computed
Sandy soil simply as the ratio of the volume of 0.5water in temporary storage (dimension
of storage x porosity)
Sandy clayto the infiltration rate (hydraulic conductivity1.0x infiltration area):
Medium and Heavy Clay 2.0
Emptying
1000 Vd Time
P p
te Equation 7.4 WSUD Technical Design Guidelines for South East Queensland – Version 1 June 2006 7-13
A inf K sat
Emptying time is defined as the time taken to fully empty a detention volume associated with an
infiltration system following the cessation of rainfall. This is an important design consideration as the
computation procedure associated with Equation 7.3 assumes that the storage is empty prior to the
Where te = emptying time (hours)
commencement of the design storm event. Australian Runoff Quality (Engineers Australia 2006)
3
suggests anVdemptying = time of thevolume
detention detention
(mstorage
) of infiltration systems to vary from 12 hours to 84
hours. For detention basins (surface systems) the emptying time must be limited to 72 hours to reduce
P = perimeter length of the infiltration area (m)
the risk of mosquito breeding.
Ainf = infiltration area (m2)
Emptying time is computed simply as the ratio of the volume of water in temporary storage (dimension
of storage xKporosity)
sat =tosaturated hydraulic
the infiltration conductivity
rate (hydraulic (mm/hr)
conductivity as provided
x infiltration in Step 1
area):
p = porosity (void = 1, gravel = 0.35)
1000 Vd P p
te Equation 7.4
A inf K sat
Where te = emptying time (hours)
Vd = detention volume (m3)
WSUD Technical Design Guidelines for South East Queensland – Version 1 June 2006 7-17
P = perimeter length of the infiltration area (m)
Ainf = infiltration area (m2)
Ksat = saturated hydraulic conductivity (mm/hr) as provided in Step 1
p = porosity (void = 1, gravel = 0.35)
WSUD Technical Design Guidelines for South East Queensland – Version 1 June 2006 7-17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Tod Consulting Stormwater Plans v2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.