CIVIL ENGINEERING PROJECT MANAGEMENT
SEDIMENT AND EROSION CONTROL
The dimensions of the constructed infiltration system using Atlantis Flo-Tank (Matrix Triple Modules) were
also provided in the Aquaintel report. This system comprises of 18 modules connected in 2 rows of 9 modules
formation. The dimension of each cell used is 408mm wide x 685mm long x 1310mm high, this provides a
volume of 0.366m3 per cell.
Using the Atlantis Flo-tank dimensions, the capacity to accommodate the original flows and the increased area
of impervious were calculated using the Design Event Method volume. The results are shown in Table 3.
Table 3 – Required Infiltration Tank Size
Required Volume Existing Tank Properties (18 modules)
Acceptable Capacity
(Design Event Method) Surface Area Volume
Original
6.36m3 4.9m2 6.59m3 Yes
(70% impervious fraction)
Proposed
6.94m3 4.9m2 6.59m3 No
(90% impervious fraction)
It is demonstrated that the increase in impervious area would increase the runoff volume calculated using the
Design Event Method. This increase in volume is larger than the available capacity of the infiltration system
currently installed.
Page 6 of 10
2261 david low way, peregian beach, qld 4573 acn: 626671092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
33522 Stormwater report018-01 SWQA issued 180704.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.