                                                                                       2010/574




       Plan No.              Rev.    Plan Name – Prepared by                      Date
       Sheet 1 of 4                  Lower Level Plan – Civic Steel Homes         24 March 2010
       Sheet 2 of 4                  Upper level Plan – Civic Steel Homes         24 March 2010
       Sheet 3 of 4                  Elevations – Civic Steel Homes               24 March 2010
       Sheet 4 of 4                  Elevations – Civic Steel Homes               24 March 2010

Relevant Period
2.   The Development Permit for a material change of use lapses if the use has not happened by
     31 May 2014, unless an application to extend the currency is approved by Council.
Building Height
3.   The building height shall not exceed 8.0 metres above the natural ground level, finished
     ground level and 2 storey.
4.   A verification survey of the building shall be carried out by a Licensed Surveyor and a
     certificate lodged with Council at completion of the work confirming compliance with the
     maximum allowable building height as required by either the conditions of approval of the
     Planning Scheme.
Security Bond
5.   Security in the form of a cash bond or trading bank guarantee to the sum of $10 000 must be
     submitted, to secure performance of all conditions of this approval, prior to the issue of a
     Development Permit for building works. The cash bond or trading bank guarantee will be
     returned on performance of the conditions of approval less any costs incurred by Council in
     respect of enforcing performance of this permit.
Landscaping
6.   The retaining wall shall not encroach into the southern boundary setback.
7.   Existing trees on the site and within road reserves shall be retained, except where required to
     be removed due to building operations or the conduct of the approved use. In this regard:
     7.1.   the mature Banksia integrifolia located near the front boundary shall be retained.
     7.2.   the small Banksia integrifolia located to the north west corner of the Lot and within the
            setback shall be retained.
8.   All vegetation shall be protected from interference resulting from clearing or construction
     activities by:
     8.1.   Clearly marking the 2 Banksias to be retained with flagging tape;
     8.2.   Installing protective fencing around the drip line of the trees;
     8.3.   Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
            cause interference with trees; and
     8.4.   Low impact construction techniques are used around trees to minimise interference with
            the trees.
9.   Cleared vegetation is to be suitably processed by one of the following methods and removed
     from the site:
     9.1.   Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
            loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
            minimum of 10 metres between edges of heaps.
     9.2.   Disposal for firewood.
     9.3.   Disposal for landscaping purposes.
                                                                                     Page 2 of 8

Used in these records

About this file

File size
61 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2010_574 SPA Decision Notice [As Published].pdf · 61 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.