202315 Woodland RFI Stage Rev E 21.07.23
Very large file (11.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
CLD02 RS01 CLD01 AWN01 RS01 GU01
1 2 3 4 5 6
3,070 2,280 2,100 3,900 16,090
RS01
+17.603
Highest point of roof
GU01
+16.400
2 Roof
+16.400 +15.800 AWN01 AWN01
Window / Door Head FG FG FG FG FG FG FG
Bifold window
CLD01
1 Upper Level +13.400 CLD02
+13.100
+13.400
Bottom of Slab +12.500 SCN01
BAL01
Bottom of SCN01
SCN03
P2
DP01
WS
+10.100
0 Ground Level
+10.100 BOUNDARY
Adjacent landscaped mound RBW01 P1 WS SCN01 P1 P1 P2 WS P1 SCN01
North East Elevation
1:100
RS01 CLD02
A B C D E F G
2,090 7,110 5,600 1,700 2,080 790
RS01
+17.603
Highest point of roof
GU01 GU01
+16.400
2 Roof
+16.400 +15.800 AWN01 AWN01
Window / Door Head FG FG FG FG FG FG
DP01 X X O
Bifold window
SCN02
BAL01 CLD02
+13.400
1 Upper Level
+13.100
+13.400
Bottom of Slab +12.500
Bottom of SCN01
SCN03 DP01
SCN03
+10.100 BOUNDARY O X X O BOUNDARY
0 Ground Level
+10.100
Adjacent landscaped mound dotted RBW01 DP01 WS SCN01 DP01 SCN04
South East Elevation
1:100
B L A C K Mixed Use Building
ELEVATIONS
W O O D
DA3.02
Scale Project No. Date Revision For Aaron O’Connor
1:100 @ A3 202315 21/07/2023 E 7 Woodland Drive, Peregian Beach QLD 4563
a r c h i t e c t u r e & d e s i g n
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.