OZCARE NOOSA AGED CARE RESIDENCE Construction Management Plan
Table of Contents
1 INTRODUCTION .......................................................................................................................................3
2 PROJECT SUMMARY ................................................................................................................................3
2.1 Construction .................................................................................................................................3
2.2 Time Frame ...................................................................................................................................5
2.3 Site Contacts .................................................................................................................................5
2.4 Off Site Management and Site Management Structure ...............................................................5
2.5 Project Organisational Chart ........................................................................................................5
3 CONSTRUCTION VEHICLE ROUTE ............................................................................................................6
4 LOADING AND UNLOADING OF VEHICLES ..............................................................................................6
4.1 Site Limitations .............................................................................................................................6
4.2 Entry Points...................................................................................................................................6
5 IMPACT ON TRAFFIC MAVEMENT IN THE AREA .....................................................................................6
6 PARKING FOR CONSTRUCITON VEHICLES ...............................................................................................6
7 ENVIRONMENTAL ISSUES .......................................................................................................................8
7.1 Dust and Air Quality Control Management ..................................................................................8
7.2 Noise Control ................................................................................................................................8
7.3 Vibration .......................................................................................................................................8
7.4 Site Drainage and Water Quality ..................................................................................................8
8 PEDESTRIAN AND PUBLIC SAFETY ISSUES ...............................................................................................9
8.1 Site Main Access ...........................................................................................................................9
9 HOURS OF WORK ..................................................................................................................................10
10 FENCING AROUND SITE.....................................................................................................................10
11 COMPLAINTS REMEDY PROCESS.......................................................................................................10
12 TRAFFIC MANAGEMENT ...................................................................................................................11
APPENDIX 1 – Proposed Construction Vehicle Routes .................................................................................12
APPENDIX 2 – Site Establishment Plan .........................................................................................................13
APPENDIX 3 – Erosion & Sediment Control Plans .........................................................................................14
APPENDIX 4 – Environmental Management Plan (EMP) ..............................................................................15
APPENDIX 5 – Workplace Health & Safety Management Plan (WHSMP) ....................................................16
Woollam Constructions Page 1 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.