Skip to the record
Accept no imitations.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 134, section 1. The text section number identifies this passage in the reader.

OZCARE NOOSA AGED CARE RESIDENCE                                                         Construction Management Plan


    7       ENVIRONMENTAL ISSUES
    Environmental issues for these stages of the project are to be covered specifically in an Environmental
    Management Plan (EMP) included in Appendix 4 and shall include but not be limited to:

         7.1        Dust and Air Quality Control Management
    Air Quality Management, will be in accordance with;

         a) EMP in conjunction with
         b) Local EPA requirements.

         7.2        Noise Control
    Noise Control Management, will be in be in accordance with;

         a) EMP, and in conjunction with;
         b) Local EPA requirements
    In order to reduce the noise impact on the surrounding areas Woollam Constructions will implement the
    following control measures:

         a) The hours for construction work on the site which generates audible noise will be limited to the
            working hours of 7:00am to 6:30pm Monday to Saturday. No work is to be undertaken on Sundays
            or public holidays without prior Council authority approval.
         b) Noise levels to be kept within legislative requirements and monitored as required.
         c) Construction equipment shall be properly noise attenuated where possible and maintained in
            good working order.
         d) All equipment used on site will be operated in an efficient manner and properly maintained.
         e) A complaints register will be developed to fully investigate any noise complaints.
         f) Respond expeditiously to any public complaints and maintain a complaints’ register
         g) Ensure all works are conducted within approved hours.

         7.3        Vibration
    Vibration Control Management will be in accordance with:

         a) EMP, and in conjunction with;
         b) Local EPA requirements

         7.4        Site Drainage and Water Quality
    Site Drainage and Water Quality Management, will be in be in accordance with:

         a) EMP, and in conjunction with,
         b) Local EPA requirements
         c) Erosion & Sediment Control Plans (Appendix 3)




Woollam Constructions                                                                                          Page 8 of 17

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.