Construction activities
The construction project is in an existing facility with several stages of work. The project involves the following
stages of work at the approximate timing.
Project Phases J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Site establishment
Early Works
Enabling Works
Stage 1
Stage 2
Stage 3
Stage 4
All stages of work in the project involve the following activities.
• Demolition
• Site preparation and excavation work
• Trenching for storm water and sewerage
• Trenching for electrical and fire services
• Placement of steel reinforcement
• Concrete footings, internal and external floor slabs and paths
• Erection and dismantling of formwork
• Scaffolding
• Structural steelwork
• Roof sheeting and associated roof plumbing
• Brick Veneer external walls with steel frame
• Brick cavity partitions with steel framing above lined with plasterboard
• Aluminium framed windows and doors
• Insulation to walls & roof
• Cabinetwork and joinery
• Tiling, toppings and rendering
• Painting both internal and external
• Installation of plumbing services, fixtures and fittings
• Installation of electrical services and fittings
• Installation of mechanical services and fittings
• Installation of Vinyl and carpet floor coverings
• External paving, landscaping and landscape structures
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 7 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.