Council archive · source document
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 154, section 1. The text section number identifies this passage in the reader.
- Paints and solvents that location was a place that could lawfully
including the cleaning be used as a waste facility for that waste.
of equipment, tools
and brushes. Submit to the Principal’s Representative
- Cleaning materials and reports, including the record of waste
rags disposal and method and location of
- Trade Waste disposal; and immediate reports of the
- Materials unsuitable details of any waste from the site which has
for re-use; and been conveyed or deposited at any place
- Other waste that cannot lawfully be used as a waste
facility for that waste.
Records Sufficient records to This EMP and modifications to suit this Site Manager Continual 3.4.5 EMS
demonstrate appropriate Contract will be submitted to Principal’s
environmental Representative
management.
The EMP will be updated as required.
Notifications and Fines
from the EPA and the Appropriate progress and other reports will
resulting Corrective be submitted to the Principal’s
Action Representative
The Principal’s Representative will be
notified of all EPA action and Fines from the
EPA and the resulting Corrective Action
All records will be securely filed using an
effective document retrieval system.
Vehicle Access Damage to the All vehicles and plant will access the site Site Manager Site Specific Site Specific
ecosystems on Site is along designated routes Induction Induction Records
minimised Contractors Training
Traffic Flow Plan
Parking of Damage to the All vehicles and plant will park in Site Manager Site Specific Site Specific
vehicles and ecosystems on site is designated areas Induction Induction Records
plant minimised Contractors Training
Traffic Flow Plan
Movements of Damage to the All pedestrian materials and equipment Site Manager Site Specific Site Specific
pedestrians, ecosystems on site is movement from and to vehicles will be Induction Induction Records
materials and minimised along approved access routes Contractors Training
equipment Traffic Flow Plan
Wash down of Storm water is not Vehicles and plant will be washed down Site Manager Site Specific Induction Records
vehicles and polluted by residues from only in areas approved by the Principal’s Induction
plant wash down Representative for this purpose Contractors Training Site Specific
Induction
Traffic Flow Plan
Reinstatement Re-instatement of Relevant areas of Site will be cleaned and Site Manager Immediately 2. Risk Register EMP
damaged eco-systems to re-instated
their previous conditions Landscaping
Contractor
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 10 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.