Skip to the record
The gold standard in government transparency.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 160, section 1. The text section number identifies this passage in the reader.

Training, Awareness and
Competence
Site Managers/Leading Hands will receive training in the use of this management plan using the Environmental
Management Plan Training Program at the commencement of each project. Evidence will be recorded on the
Environmental Management Plan Training Program Questionnaire and saved in the EMP for the Project. The
Training Register will be updated each time this training is undertaken. Alternatively, the information will be
recorded on the HR training system ELMO.
Additional environmental training, if deemed necessary, shall be given to all employees and Contract Partners
in conjunction with the Site-Specific Induction. The objective of the training will be to make all employees
aware of and have an understanding of the Environmental Management Plan and Woollam environmental
operating guidelines.
Relevant employees involved in the use of machinery and materials on site shall be trained in practices for
minimising environmental problems, including noise, dust, water quality, waste and contamination. The Site
Manager shall be responsible for ensuring that relevant site personnel receive safety and environmental
training where required. Records shall be maintained of employees and subcontractors who have received this
safety and environmental training.

                           Environmental Management Plan Induction Record

       Name                     Position                         Role                      Signature                    Date




*Ensure training module on Woollam Connect has been completed.


 Document ID: WC ENV 002      Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
            Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                   Environmental Management Plan / Page 16 of 18

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.