Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 172, section 1. The text section number identifies this passage in the reader.

    4. PLANNING
    4.1 Environmental aspects
Corporate Level
Woollam will endeavor to minimise its impact on the environment by adopting some simple strategies in
regard to the following:
    •   Electrical – wherever possible Woollam electrical appliances will be:
                 -    Turned off when not in use;
                 -    Regularly maintained to ensure optimum performance;
                 -    Use the most energy efficient receptacles e.g. florescent light bulbs;
    •   Vehicles – All vehicles owned by Woollam will be regularly maintained and serviced;
    •   Paper – Woollam will;
                 -    Actively recycle paper/cardboard where practicable;
                 -    Use paper sourced from environmentally responsible providers;
    •   Printer and toner cartridges – all printer and toner cartridges are recycled;
    •   Redundant mobile phones – redundant mobile phones are recycled.


Projects Level
The environmental aspects related to projects will be assessed by the Project Manager, in conjunction with
the Site Manager and HSEQT Manager /Regional HSE Coordinator, at the Project Start Up Meeting.
The results from this initial assessment will be recorded in section 4, Risk Register, of the Environmental
Management Plan.
Compliance with the controls listed in the assessment will be monitored by regular site inspections, reviews
and audits.



    4.2 Legal and other requirements
The HSEQT Manager will subscribe to the Office of Queensland Parliamentary Council (OQPC) and to the
NSW Legislation Feed, which alerts subscribers of changes in Legislation, and SAI Global Standards Watch,
which alerts of any changes to Australian Standards.
The HSEQT Manager will subscribe to the Office of Queensland Parliamentary Council (OQPC) and to the
NSW Legislation Feed, which alerts subscribers of changes in legislation, and SAI Global Standards Watch,
which alerts of any changes to Australian Standards.
The HSEQT Manager will issue document updates to the nominated relevant person as they are received,
who in turn will notify regional staff affected by the changes. In turn, the Site Manager will communicate
relevant information to site staff via toolbox talks and daily pre-starts.
A link to relevant legislation has been provided through Woollam intranet. All Woollam staff with access to
the server via a shortcut to the intranet added to their desktop.




                                                            Environmental Management System Manual / Page 11 of 18

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.