Skip to the record
Every meeting, every word.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 206, section 1. The text section number identifies this passage in the reader.

9. Emergency Preparedness and
   Response Plan
Woollam Constructions has identified the most likely potential emergency situations for construction activities.
Generic situations and appropriate actions are recorded on the Emergency Preparedness and Response Plan.
The plan will be created by the HSEQT Manager / Regional HSE Co-ordinator with that person holding a
minimum a Cert 4 BSB41419 Work Health and Safety or equivalent.
The Emergency Preparedness and Response Plan will be available in prominent locations on site (site office or
lunchroom.
Site Specific Emergency scenarios will also be identified using the Emergency Preparedness and Response Plan
Site Managers and other workers nominated as Emergency Coordinators will be required to undertake the
Emergency Response Training on the cloud-based software system and participate in development of the
Emergency Preparedness and Response Plan during the site establishment phase.
The Emergency Preparedness and Response Plan shall formally assess the suitability, location and accessibility
of emergency equipment and identify potential Emergency Scenarios. It shall also determine the first aid
system, facilities and number of first aid providers, appropriate for the project and the organizational risks.

9.1 Supporting Documents
Evacuation Diagram
Emergency Preparedness and Response Plan
Emergency Preparedness and Response Plan Training (conducted online)




                                                                                  WHS Management Plan / Page 26

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.