11. Site Diary
The Site Diary for the project will be undertaken on a cloud-based software system each day by the Site
Manager. The Site Diary will be used to record the following:
• Notes Register – the notes register is to record activities that could include but not be limited to:
- Incidents.
- Hired Plant information.
- Activities and associated hazards on site.
• Weather conditions
• Timecard entry – a record of all Woollam Constructions’ employees worked hours.
• Man Hours Register – a record of all Contract Partner’s worked hours.
All completed Site Diaries will be filed, and can be accessed, through the relevant project and recorded on
Procore.
WHS Management Plan / Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.