20. HSE Planning Tool
The HSE Planning Tool will be completed by the Regional HSE Coordinator in consultation with the Site
Manager and Site HSE Advisers (where applicable), to identify high risk activities and discuss controls on a
weekly basis. HSE planning tool will also be used to identify and design changes or changes to risk profiles of
temporary structures A record of the identified and risks and the intended controls will be kept on a cloud-
based software system.
As found in Procore.
WHS Management Plan / Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.