CONCRETE NOTES 11. CONTINUED 24. TOP STEEL HAS MAIN BARS OR WIRES ON TOP. BOTTOM STEEL HAS MAIN BARS OR
1. BUILDER TO ENSURE CONCRETE MATERIAL AND QUALITY BY THE CONCRETE WIRES ON BOTTOM.
SUPPLIER TO BE IN ACCORDANCE WITH RELEVANT CODES AND REGULATIONS. 25. UNLESS NOTED OTHERWISE BAR LAPS SHALL BE:
2. ALL CONCRETE WORK SHALL BE EXECUTED IN ACCORDANCE WITH THE FOLLOWING
CODES, UNLESS SPECIFICALLY VARIED BY
THE CONTRACT DOCUMENTS.
- AS2870 - RESIDENTIAL SLABS AND FOOTINGS (IF APPLICABLE).
- AS3600 - CONCRETE STRUCTURES.
- AS3610 - FORMWORK FOR CONCRETE.
- AS/NZS 4671 - STEEL REINFORCING MATERIALS.
3. PROVIDE THE ENGINEER WITH AT LEAST 48 HOURS NOTICE OF REINFORCEMENT
BEING READY FOR INSPECTION. NO CONCRETE IS TO BE POURED WITHOUT
INSPECTION.
4. THE CHARACTERISTIC COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS (f’c)
SHALL BE AS FOLLOWS:
LAPPED SPLICING NOT PERMITTED FOR N40 BARS. SPLICES SHALL BE ACHIEVED BY USE OF
MECHANICAL COUPLERS.
26. ALL STARTER BARS TO REINFORCED CONCRETE WALLS, COLUMNS AND ALL
MASONRY WALLS AND PIERS ARE TO BE TIED INTO THE FOOTING REINFORCEMENT.
27. NO CONSTRUCTION OR EXPANSION JOINTS ARE PERMITTED UNLESS SHOWN ON
DRAWINGS.
28. CONCRETE TESTING RESULTS TO BE PROVIDED AT 1 TEST PER 50m3 WITH A
5. NO ADDITIVES SHALL BE ADDED OR APPLIED TO THE CONCRETE MIX WITHOUT THE
MINIMUM OF 1 TEST PER DAY.
APPROVAL OF THE ENGINEER.
29. ALL TRAFFICABLE CONCRETE SLABS SHALL BE BROOM FINISHED PERPENDICULAR
6. THE MAXIMUM PERMISSIBLE TRANSPORT TIME FOR CONCRETE BETWEEN BATCHING
TO TRAFFIC FLOW. FOR SLABS WITH FALLS OF GREATER THAN 1 IN 10 (10%) USE
AND PLACEMENT ON SITE SHALL BE IN ACCORDANCE WITH THE FOLLOWING TABLE:
HEAVY DUTY BROOM FINISH.
30. WHERE SERVICE PIPES PENETRATE CONCRETE ELEMENTS, PROVISION SHOULD BE
MADE TO ALLOW FOR MOVEMENT OF THE ELEMENT.
12. ALL CONCRETE SHALL BE VIBRATED IN ACCORDANCE WITH AS3600.
13. SIZES SHOWN ARE STRUCTURAL SIZES AND DO NOT INCLUDE APPLIED FINISHES.
14. REINFORCEMENT IS SHOWN DIAGRAMMATICALLY AND NOT IN TRUE PROJECTION.
15. NO CHASES OR HOLES OTHER THAN THOSE SHOWN ON THE STRUCTURAL
DRAWINGS WILL BE PERMITTED IN CONCRETE MEMBERS WITHOUT PRIOR
APPROVAL OF THE ENGINEER
7. THE EXPOSURE CLASSIFICATION FOR INDIVIDUAL CONCRETE ELEMENTS IS AS
16. FORMWORK FINISHES AND FINISH CLASS AS PER THE ARCHITECT'S SPECIFICATION.
FOLLOWS:
17. WELDING OF REINFORCEMENT WILL NOT BE PERMITTED WITHOUT APPROVAL FROM
ENGINEER.
18. ALL CONCRETE SHALL BE MECHANICALLY VIBRATED. VIBRATORS SHALL NOT BE
USED TO SPREAD CONCRETE.
19. STRIPPING OF FORMWORK SHALL BE AS PER THE FOLLOWING:
8. CURING REQUIREMENTS:
°C ° ° ° °
9. COVER REQUIREMENTS:
20. STRIPPING OF FORMWORK AND REPROPPING OF SUSPENDED SLABS AND BEAMS
SHALL BE CARRIED OUT PROGRESSIVELY SO THAT AT NO STAGE IS THE SLAB OR
BEAM UNSUPPORTED UNTIL IT IS PERMITTED TO FULLY REMOVE ALL PROPPING.
21. IN MULTISTORY CONSTRUCTION, PROPS SHALL BE LOCATED IN THE SAME POSITION
ON EACH FLOOR SO THAT THEY WILL BE CONTINUOUS IN THEIR SUPPORT FROM
FLOOR TO FLOOR. WHERE THE NUMBER OF PROPS ON A FLOOR IS REDUCED, THE
REMAINING PROPS SHALL BE LOCATED DIRECTLY UNDER PROPS ON THE FLOOR
10. CURING SHALL BE EFFECTED BY USE OF AN APPROVED CURING COMPOUND WHICH
ABOVE.
SHALL BE APPLIED TO ALL CONCRETE SURFACES WHERE VISIBLE IMMEDIATELY ONCE
22. SPLICES IN REINFORCEMENT TO BE MADE IN PLACES SHOWN OR APPROVED IN ALL
CONCRETE IS HARD AND TO ALL FORMED SURFACES IMMEDIATELY AFTER FORMS
CASES. GENERALLY AT THE MIDSPAN FOR TOP STEEL AND NEAR SUPPORTS FOR
ARE REMOVED, EXCEPT WHERE AN APPLIED FINISH IS TO BE USED. THE CURING
BOTTOM STEEL. IN ALL CASES THE LAP LENGTH SHALL BE AS PER NOTE 25.
COMPOUND SHALL THEN BE TAKEN OUT BY MAINTAINING THE SURFACE IN A MOIST
23. SL72, RL918 etc INDICATES REINFORCING FABRIC CONFORMING TO AS/NZS 4671. LAP
CONDITION. OTHER CURING METHODS SHALL BE APPROVED IN WRITING BY THE
LENGTHS SHALL BE:
ENGINEER PRIOR TO USE.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEASURING AND RECORDING THE
AIR TEMPERATURE, RELATIVE HUMIDITY, CONCRETE TEMPERATURE AND WIND
VELOCITY (MEASURED 1m ABOVE THE AS PLACED CONCRETE) AT THE TIME OF
CONCRETE PLACEMENT AND CONTINUE UNTIL CURING HAS COMMENCED. THIS
INFORMATION SHALL BE USED IN CONJUNCTION WITH FIGURE 1 TO DETERMINE THE
RATE OF EVAPORATION OF WATER FROM THE FRESHLY PLACED CONCRETE AND
UNPROTECTED SURFACE OF THE CONCRETE. THE RATE OF EVAPORATION SHALL BE
MONITORED BY THE CONTRACTOR UNTIL SUCH TIME AS CURING COMMENCES.WHEN
THE VALUE OF THE RATE OF EVAPORATION AS DETERMINED FROM FIGURE 1 EXCEED
NOTE.
0.5kg/m2 PER HOUR, THE CONTRACTOR SHALL TAKE PRECAUTIONS TO MINIMISE
EVAPORATION MOISTURE LOSSES SUCH AS THE APPLICATION OF ALIPHATIC
ALCOHOL BASED EVAPORATIVE RETARDING COMPOUND. PLASTIC SHRINKAGE OR
DRYING CRACKING IS LIKELY TO OCCUR WHEN SITE CONDITIONS GIVE AN
ST
EVAPORATION RATE OF 1kg/m2 PER HOUR. THEREFORE, PRECAUTIONS ARE
RECOMMENDED WHEN THE EVAPORATION RATE IS LIKELY TO EXCEED 0.5kg/m2 PER
ST
HOUR. THE APPLICATION OF ALIPHATIC ALCOHOL, WHEN REQUIRED, IS TO BE
APPLIED IMMEDIATELY AFTER THE INITIAL SCREENING AND WHILE THERE IS BLEED
WATER STILL PRESENT ON THE SURFACE. REPEATED APPLICATIONS MAY BE
o
NECESSARY. THE APPLICATION OF THE ALIPHATIC ALCOHOL SHALL BE IMPLEMENTED
Noo
IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS. DETAILS OF THE
PRODUCT AND ITS APPLICATION PROCEDURE SHALL BE SUBMITTED TO THE
O
ENGINEER FOR REVIEW NOT LESS THAN 4 WEEKS PRIOR TO THE COMMENCEMENT OF
PLACEMENT. THE CONCRETE SHALL NOT BE PLACED IN WEATHER WITH
TEMPERATURES EXCEEDING 32°C.
ST
o
ST
D AS S A o
IN ASSO IATION WIT OOLLA CONSTRUCTIONS CIVIL
o D A Do
B OPERATIONAL OR S ISSUE DCZ E 04 0 24 D N
o
A PRELI INARY HJD E 2 0 24 OZCARE NOOSA D J N Jo N . D No. R o
THIS DRAWING IS COPYRIGHT © DO NOT
R D o B A D 80 COOYAR STREET, NOOSA HEADS E SCALE DRAWING ORIGINAL DRAWING IS A1
STP24-0253 C102 B
A o SIZE. THIS DRAWING IS NOT TO BE USED FOR
D T E CONSTRUCTION UNLESS THE APPROVED
A END ENTS PROJECT NOTES - SHEET 2 R E No. SIGNATURE HAS BEEN ADDED. NOT FOR CONSTRUCTION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.