STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 256, section 1. The text section number identifies this passage in the reader.
2.1 Design and Construct Project
Residual
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Hazard Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Worker health and HIGH 5 Consultation with all designers and consultants to ensure they are made aware that their design is to meet. Project Manager and
safety during the: • all legislative requirements and Designers and
• Construction • incorporate control measures to remove or reduce health and safety implications to an acceptable level. Consultants
• Use Design briefs need to consider the health and safety of persons.
• Maintenance and • during construction of the structure/equipment
• In the vicinity • when the structure /equipment has been constructed and is used by the end user.
Regular meetings are to be scheduled with designers/consultants to review and where possible close out actions/issues raised in the design
risk assessment.
Architects, designers, engineers, and those consultants responsible for design elements must provide the project team with a documented
design risk assessment addressing the issues described above.
Residual constructability risks to be outlined in the above table.
Where there are design changes the site team is to undertake a preliminary assessment and.
• Record yes or no on the project variation register to identify if the changes may impact on the site health and safety that involve
change in.
• New construction materials
• Construction processes
• Construction techniques previously used.
• Introduction of new hazardous materials
Amend or develop a new work method statement for the change being made.
Where YES has been recorded on the variation register the site team is to undertake a design changes assessment
Results of the design change risk assessment are to be communicated to the relevant Contract Partner’s or employees and involve a toolbox
talk to inform the relevant workers
Project Hazard/Risk Assessment / Page 14 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.