Original PDF page 279, section 1. The text section number identifies this passage in the reader.
Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
HIGH 6 Maintain good personal hygiene practices which includes – M Site Management
Contract Partner
- Washing hands regularly HSE Advisor with BSBWHS414 OHS
- Removing possibly contaminated clothing at the end of shift Cert 4
- Wipe down work areas and workspaces regularly with antibacterial / anti-viral cleaners on a regular
basis
Health monitoring Health impacts EXTREME 5 Where Woollam direct employees are undertaking activities exposing them to hazardous substances M Site Management Contract
health surveillance / monitoring as required by relevant legislation will be undertaken, or those identified Partner
as significant risk to a worker’s health through the Hazardous Substance Risk Assessment. Procedure is HSE Advisor with BSBWHS414
outlined in the Woollam 0011 - Health Monitoring Program. OHS Cert 4
Health impacts EXTREME 5 Health surveillance / monitoring information / reports will be provided to workers. M Site Management Contract
Partner
HSE Advisor with BSBWHS414
OHS Cert 4
Health impacts EXTREME 5 Actions will be taken based on the results of the health surveillance / monitoring. M Site Management Contract
Partner
HSE Advisor with BSBWHS414
OHS Cert 4
Reference WHS Reg 2011 Schedule 14, Managing Biological Hazards COP
Review / Monitoring Safety Interactions, Task Observations, SWMS Review, Weekly HSE Inspection, Monthly Audit as per Procore Inspection Matrix
7.10 Fumes, gas, vapour hazards
Planning for construction Fumes of Risk – HIGH 5 Identify any possible exposure risks prior to work commencing during project prestart meeting. HSE team Project Team
activities – Fumes to be involved in meeting. Site Manager
- Solvents HSE Advisor with BSBWHS414 OHS
- Glues Cert 4 with BSBWHS414 OHS Cert 4
- Plastic HIGH 5 Where possible risks are identified which don’t have suitable controls in place. Engage a qualified and Site Management
materials formally trained occupation hygienist to assess the risk and provide a mitigation strategy. Contract Partner’s
Visitors
- Manufactured
Formally trained occupation
timbers
hygienist
Project Hazard/Risk Assessment / Page 37 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.