STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 286, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                      Residual
                    Rating
                    Initial
                                                                                 Proposed Controls




                     Risk




                                                                                                                                                        Risk
Activity   Hazard                                                                                                                                                      Responsible Person




                              HOC
                                                     (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)

                    HIGH      6     PPE and RPE is always worn whilst performing activities that have risk potential.                                            Site Management
                                                                                                                                                                 Contract Partner
                                                                                                                                                                 HSE Advisor with BSBWHS414 OHS
                                                                                                                                                                 Cert 4


                    HIGH      6     Ensure areas at risk are excluded and signed appropriately in a manner that prevents unauthorised access.                    Site Management
                                                                                                                                                                 Contract Partner
                                                                                                                                                                 HSE Advisor with BSBWHS414 OHS
                                                                                                                                                                 Cert 4




                    HIGH      6     Where possible provide ventilation to area ensuring you are not moving contaminated air to another                           Site Management
                                    inhabited area.                                                                                                              Contract Partner
                                                                                                                                                                 HSE Advisor with BSBWHS414 OHS
                                                                                                                                                                 Cert 4

                    HIGH      5     Ensure ventilated bunded areas are available to store materials that may emit harmful vapours.                               Site Management
                                                                                                                                                                 Contract Partner
                                                                                                                                                                 HSE Advisor with BSBWHS414 OHS
                                                                                                                                                                 Cert 4

                    HIGH      5     If flammable, ensure no naked flames are present and firefighting equipment is available in the immediate                    Site Management
                                    area of storage and use.                                                                                                     Contract Partner
                                                                                                                                                                 HSE Advisor with BSBWHS414 OHS
                                                                                                                                                                 Cert 4




                                                                                                                     Project Hazard/Risk Assessment / Page 44 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.