Original PDF page 286, section 1. The text section number identifies this passage in the reader.
Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
HIGH 6 PPE and RPE is always worn whilst performing activities that have risk potential. Site Management
Contract Partner
HSE Advisor with BSBWHS414 OHS
Cert 4
HIGH 6 Ensure areas at risk are excluded and signed appropriately in a manner that prevents unauthorised access. Site Management
Contract Partner
HSE Advisor with BSBWHS414 OHS
Cert 4
HIGH 6 Where possible provide ventilation to area ensuring you are not moving contaminated air to another Site Management
inhabited area. Contract Partner
HSE Advisor with BSBWHS414 OHS
Cert 4
HIGH 5 Ensure ventilated bunded areas are available to store materials that may emit harmful vapours. Site Management
Contract Partner
HSE Advisor with BSBWHS414 OHS
Cert 4
HIGH 5 If flammable, ensure no naked flames are present and firefighting equipment is available in the immediate Site Management
area of storage and use. Contract Partner
HSE Advisor with BSBWHS414 OHS
Cert 4
Project Hazard/Risk Assessment / Page 44 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.