Council archive · source document
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 288, section 1. The text section number identifies this passage in the reader.
8. Hazardous Substances
Residual
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Hazards Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
8.1 Asbestos Removal
Planning for ACM Incorrectly licenced EXTREME 5 Licensed Asbestos Removalist (with the appropriate asbestos removal certification) will be used for the removal of M Site Management
removal contractor asbestos. Asbestos Removalist
Unidentified ACM EXTREME 5 A copy of the relevant asbestos register (inclusive of relevant risk assessments) will be provided to the Asbestos M Project Manager
Removalist. Site Manager
Unlicenced HIGH 5 Licences / permits / notifications (as relevant) will be checked at time of review of the asbestos removal plan. M Project Management
removal works Site Management
Project Hazard/Risk Assessment / Page 46 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.