STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 299, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                Residual
                                                                                                                                                                                                                               Responsible




                                                          Rating
                                                                                                                               Proposed Controls




                                                          Initial




                                                                    HOC
                                                           Risk




                                                                                                                                                                                                                  Risk
      Activity                   Hazards
                                                                                                   (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                               Person

Installation of       Faulty wiring                      EXTREME    5     All temporary construction electrical installations will be installed and maintained in accordance with AS/NZS 3012                               Site Management
temporary                                                                                                                                                                                                                  Electrical Contractor
electrical circuits   Faulty electrical installations   EXTREME     4     RCDs will be supplied to all circuits in switchboards and will be tested monthly by a push button test and every 3                                Site Management
                                                                          months by a person holding an Electrical Practitioner Licence. Records of all testing to be retained on site and provided                        Electrical Contractor
                                                                          to Woollam.

                      Faulty electrical equipment       HIGH        3     Daily RCD push button test by user is to be completed for all PSOA (portable socket outlet assemblies) on site.                                          User

                      Workers electrocuted /            EXTREME     4     Construction wiring will not be tied, bundled or grouped with permanent wiring.                                                                   Site Management
                      shocked.                                                                                                                                                                                              Contract Partner
                                                                          It will be readily distinguishable from permanent wiring by using cable of a different colour (except green), or by
                      Faulty installation                                 attaching iridescent yellow tape at intervals of not more than five (5) metres and stamped with the words
                                                                          “Construction Wiring.”

                      Faulty installation               EXTREME     5     Switchboards must be:                                                                                                                             Site Management
                                                                                                                                                                                                                            Contract Partner
                                                                          - readily accessible, protected from damage and located within the site perimeter; and
                                                                          - singularly identifiable through either numbering, lettering, or a combination of the two.




                                                                                                                                                              Project Hazard/Risk Assessment / Page 57 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.