Original PDF page 307, section 1. The text section number identifies this passage in the reader.

   10.               Fire Protection on Site




                                                                                                                                                                                      Residual
                                                                                                                                                                                                 Responsible




                                                 Rating
                                                 Initial
                                                                                                                   Proposed Controls




                                                           HOC
                                                  Risk




                                                                                                                                                                                        Risk
       Activity                       Hazards
                                                                                      (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                              Person

Planning               Safe evacuation path     MEDIUM     3     Fire Emergency Exits / evacuations ways:                                                                                           Site
                                                                                                                                                                                                 Management
                                                                 - to be assessed to be clear of operational activities that could have a major impact on safe movement of
                                                                       workers.
                                                                 -     be a minimum of 1200mm wide.
                                                                 -     be the quickest route to identified exit internal stairs and scaffold stairs.
                                                                 -     be uncluttered and kept clear for the entire route to the exit stairs and down to the building exit.
                                                                 -     be uncluttered from the building exit to the assembly areas.
                                                                 -     have adequate lighting to ensure safe visual travel – refer Lighting section to be maintained on a daily
                                                                       basis and assessed on the Weekly HSE Inspection on Procore

                       Incorrect signage        MEDIUM     3     Fire Emergency Exit / Access Signage                                                                                               Site
                                                                                                                                                                                                 Management
                                                                 - “Exit” signs to be positioned at all exit points from floor levels to exit stairs.
                                                                 - “Evacuation Route” signs to be positioned along areas where Exit Signs can’t be quickly identified due to
                                                                       building structure changes.
                                                                 - exit signs to be positioned at a height of 2m and at various locations along the access way to adequately
                                                                       inform workers of the safe exit route to take.
                                                                 - be positioned at a height minimum of 2m above the floor adjacent to the exit openings.
                                                                     be illuminated adjacent to internal stair wells – refer Lighting section to be maintained on a daily basis and
                                                                     assessed on Weekly HSE Inspection on Procore

                       Fire control equipment   MEDIUM     4     Fire Extinguisher:                                                                                                                 Site
                                                                                                                                                                                                 Management
                                                                 - Not less than one fire extinguisher to suit Class A, B and C fires and fires involving electrical equipment
                                                                       will be always provided on each storey adjacent to each required exit or temporary stair or exit.
                                                                 - Fire extinguishers to be installed with mounting bracket, (1200mm above floor level) and signage (2m
                                                                       above floor) to prevent possible dislodgement and damage.
                                                                 - to be maintained daily and assessed on Weekly Inspection Checklist
                                                                 - To be tested and tagged at intervals not exceeding 6 months
Construction phase     Fire control equipment   MEDIUM     4     After the building has reached an effective height of 12m:                                                                         Site
                                                                                                                                                                                                 Management
                                                                 - The required hydrants and hose reels for the building will be operational in at least every storey that is
                                                                       covered by the roof or the floor structure above, except the 2 uppermost storeys: and
                                                                 - Any required booster connections are to be installed.
                                                                 - Hose reels are to be always rolled onto drum.
                                                                 - The area in front of all hose reels is to be kept clear and uncluttered.

                                                                                                                                   Project Hazard/Risk Assessment / Page 65 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.