Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 310, section 1. The text section number identifies this passage in the reader.

   11.Demolition




                                                                                                                                                                                                      Residual
                                                                                                                                                                                                                   Responsible




                                              Rating
                                              Initial
                                                                                                                        Proposed Controls




                                                        HOC
                                               Risk




                                                                                                                                                                                                        Risk
    Activity              Hazards
                                                                                           (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                           Person

Planning for       Collapse of structures   EXTREME     5     Woollam’ Demolition Work of Structures Checklist is to be completed prior to work starting.                                                              Site
demolition works   / buildings                                                                                                                                                                                    Management
                                                                                                                                                                                                                   Demolition
                                                                                                                                                                                                                 Contract Partner
                   Compliance with          EXTREME     5     The regulator is required to be notified of the following types of demolition work 5 business days prior to the commencement                           Project
                   regulatory                                 of work:                                                                                                                                            Management
                   requirements                                                                                                                                                                                        Site
                                                                   - of a structure or part of a structure that is load bearing or otherwise related to the physical integrity of the structure                   Management
                                                                       (only if six metres or higher in height)                                                                                                    Demolition
                                                                   - involving load shifting machinery on a suspended floor                                                                                      Contract Partner
                                                                   - involving explosives
                                                                   - Copies of notifications and permits will be obtained and retained on file
                   Exposure to hazardous    EXTREME     5     Asbestos report from client or an appropriately qualified person who has examined the building or structure for the presence                           Project
                   materials                                  of asbestos.                                                                                                                                        Management
                                                                                                                                                                                                                       Site
                                                                                                                                                                                                                  Management
                   Exposure to hazardous    EXTREME     1     All hazardous substances, lead and asbestos will be removed prior to demolition.                                                                         Site
                   materials                                                                                                                                                                                      Management
                                                                                                                                                                                                                 Asbestos / Lead
                                                                                                                                                                                                                   Removalist
                   Compliance with          EXTREME     5     Copies of business certificate for demolition and where applicable asbestos removal certificates for the Contract Partner will                           Site
                   regulatory                                 be obtained.                                                                                                                                        Management
                   requirements                                                                                                                                                                                    Demolition
                                                                                                                                                                                                                 Contract Partner
                   Inadequate               EXTREME     5     Name and details of competent person to supervise demolition activities are to be obtained.                                                              Site
                   supervision                                                                                                                                                                                    Management
                                                                                                                                                                                                                 Contract Partner
                   Collapse of structures   EXTREME     5     A Demolition Work Plan which considers the requirements of AS 2601 The demolition of structures and the relevant state                               Demolition
                   / buildings                                code of practice will be provided for all demolition activities including:                                                                         Contract Partner
                   Injury to workers                          a) location of the site on which the structure to be demolished stands
                                                              b) The overall height of the structure above ground level and the least distance from the structure to each boundary (all to
                                                                   nearest 0.5m)
                                                              c)    A brief description of the type of building (occupancy class), its structural support system and principal materials of
                                                                   construction.



                                                                                                                                                    Project Hazard/Risk Assessment / Page 68 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.